The Yunose Itooshiki Hydroelectric Power Station, built immediately downstream of Yunose Dam in Nagano, began operations on 1 October 2026. 北野建設 handled the design and construction.
The Yunose Itooshiki Hydroelectric Power Station, built by Nagano Prefecture in Nagano, is located immediately downstream of the city's Yunose Dam and has begun operating. The article reports the power station's official start-of-operations date.
北野建設 was responsible for the design and construction of the power station. The article does not provide details of the specific construction schedule or scale.