Gecoss (9991) · InitiativeAdvanced
Commercialization of Composite Underground Wall Technology Using the J-WALL II Construction Method
First written in FY2016. 1 of 2 entries say "Advanced", first in FY2018. Latest entry: FY2018.
2entries
3years
0from disclosures
How it moved
Same theme, other companies
Practical application and field deployment of seismic-resistance and construction-efficiency technologiesA theme 4 companies write about · 0 as a headwind · 6 as a tailwind
2 other companies' latest entry also says "Advanced".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2018AdvancedAnnual report
「During the consolidated fiscal year, it was adopted for seismic reinforcement work on buildings, and we are currently collecting data.」
J-WALLⅡ工法 was adopted for seismic reinforcement work on buildings, and the project progressed to the stage of accumulating application results and collecting data. - FY2016First statedAnnual report
「Jointly with JFE Steel Corporation and OBAYASHI CORPORATION, we developed “J-WALLⅡ工法,” which integrates special steel sheet piles used as temporary earth-retaining walls during underground-wall construction with reinforced concrete to build a permanent composite underground wall. On 3 December 2015, we obtained a construction technology review certification from the Japan Institute of Construction Engineering (JICE).」
It is positioned as a new technology on which we will focus for orders and other applications in fiscal 2016.