Impact of Torrential Rain in Fukui Prefecture
アルテック新材料株式会社 (consolidated subsidiary)
Premises and buildings, production equipment, etc. in Sakai City, Fukui Prefecture (business: manufacture and sale of preforms for PET bottles)
Flooding caused by torrential rain in Fukui Prefecture from 29 to 30 August 2026
Current period
Company response
Temporary suspension of operations at アルテック新材料株式会社
A detailed investigation into the damage to production equipment and other assets is under way. If any material impact requiring disclosure is identified, it will be announced promptly.
| Item | Details |
|---|---|
| Event name | Impact of Torrential Rain in Fukui Prefecture |
| Date of occurrence | From 29 to 30 August 2026 |
| Subject Entity | アルテック新材料株式会社 (consolidated subsidiary) |
| Target Locations / Products | Premises and buildings, production equipment, etc. in Sakai City, Fukui Prefecture (business: manufacture and sale of preforms for PET bottles) |
| Cause | Flooding caused by torrential rain in Fukui Prefecture from 29 to 30 August 2026 |
| Accounting period in which recognized | Current period |
| Suspended operations | Temporary suspension of operations at アルテック新材料株式会社 |
| Outlook | A detailed investigation into the damage to production equipment and other assets is under way. If any material impact requiring disclosure is identified, it will be announced promptly. |
| Planned follow-up disclosure | If any material impact requiring disclosure is identified, it will be announced promptly. |
Items this document does not state (16)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.The premises and buildings of アルテック新材料株式会社 were flooded by torrential rain in Fukui Prefecture from 29 to 30 August 2026.