Komori
Nippo (9913) · RiskMitigated

Risk of Production Interruptions and Delays Due to Natural Disasters at Factories

First written in FY2016. 8 of 11 entries say "Restated". Latest entry: FY2022.

11entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2020-Q3MitigatedFY2020 – FY20222016: 120162017: 320172018: 220182019: 220192020: 220202021: 020212022: 12022
Same theme, other companies

The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 187 companies compared. The sentences above are computed from all 187.Comparing 200 of the theme's 503 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2022MitigatedAnnual report

    「The Group has 11 plants in Japan and overseas. If the buildings or facilities at these plants were damaged by a fire, earthquake, typhoon or other event and suffered catastrophic damage, substantial costs could be incurred for repairs, while production and shipping activities could be reduced or suspended, potentially affecting the Group’s performance. As a response to this risk, the Group has established risk management manuals setting out disaster-prevention activities during normal times and the procedures and systems from the initial response in an emergency through the resumption of operations.」

    The risk of natural disasters at plants continues, while the establishment and review of risk management manuals covering 11 plants, including disaster-prevention activities and procedures from the initial response through the resumption of operations, were explicitly stated as countermeasures.
  2. FY2020MitigatedAnnual report

    「Although the company is preparing to minimize damage by developing business continuity plans and taking other measures, if any of these buildings or facilities were to suffer catastrophic damage from a major disaster such as an earthquake or typhoon, operations could be interrupted and production and shipments delayed, resulting in lower revenue. Substantial costs could also be required to repair or replace manufacturing facilities and other sites, which could affect the performance of the Group.」

    The risk of production disruptions caused by natural disasters continues, but the previously disclosed risk description now explicitly states that preparations include developing business continuity plans and other measures.
  3. FY2020-Q3RestatedAnnual report

    「There were no occurrences of matters relating to the business, financial conditions or other items described in this quarterly report that could have a material impact on investors' decisions during the cumulative third quarter, and no significant changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    No material changes were reported regarding the risk of production disruptions and delays caused by natural disasters at plants.
  4. FY2019RestatedAnnual report

    「If any of these facilities were to suffer catastrophic damage from an earthquake or other disaster, operations could be interrupted and production and shipments delayed, resulting in lower revenue. In addition, substantial costs could be required to repair or replace manufacturing facilities and other sites.」

    The risks of production disruptions caused by natural disasters at plants, delays in production and shipments, and repair or replacement costs continue.
  5. FY2019-Q3RestatedAnnual report

    「There were no occurrences of matters relating to the business, financial conditions or other items described in this quarterly report that could have a material impact on investors' decisions during the cumulative third quarter, and no significant changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    No material changes were reported regarding the risk of production disruptions and delays caused by natural disasters at plants.
  6. FY2018RestatedAnnual report

    「If any of these facilities were to suffer catastrophic damage from an earthquake or other disaster, operations could be interrupted and production and shipments delayed, resulting in lower revenue. In addition, substantial costs could be required to repair or replace manufacturing facilities and other sites.」

    The risk of production disruptions caused by natural disasters at plants, delays in production and shipments, and repair or replacement costs continues to be disclosed.
  7. FY2018-Q3RestatedAnnual report

    「There were no occurrences of matters relating to the business, financial conditions or other items described in this quarterly report that could have a material impact on investors' decisions during the cumulative third quarter, and no significant changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    No material changes were reported regarding the risk of production disruptions and delays caused by natural disasters at plants.
  8. FY2018-Q2RestatedAnnual report

    「There were no occurrences of matters relating to the business, financial conditions or other items described in this quarterly report that could have a material impact on investors' decisions during the cumulative second quarter, and no significant changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    No material changes were reported regarding the risk of production disruptions and delays caused by natural disasters at plants.
  9. FY2018-Q1RestatedAnnual report

    「There were no new developments during the three-month cumulative consolidated period of the current fiscal year among matters concerning the business and financial conditions described in this quarterly report that could have a material impact on investors' decisions, nor were there any material changes to the "Business and Other Risks" described in the annual securities report for the previous fiscal year.」

    No material changes were reported regarding the risk of production disruptions and delays caused by natural disasters at plants.
  10. FY2017RestatedAnnual report

    「If any of these facilities were to suffer catastrophic damage from an earthquake or other disaster, operations could be interrupted and production and shipments delayed, resulting in lower revenue. In addition, substantial costs could be required to repair or replace manufacturing facilities and other sites.」

    The risk of production disruptions caused by natural disasters at plants, delays in production and shipments, and repair or replacement costs continues to be disclosed.
  11. FY2016First statedAnnual report

    「If any of these facilities were to suffer catastrophic damage from an earthquake or other disaster, operations could be interrupted and production and shipments delayed, resulting in lower revenue. In addition, substantial costs could be required to repair or replace manufacturing facilities and other sites.」

    The company cites the possibility of production stoppages at domestic and overseas manufacturing sites, lower revenue, and repair or replacement costs.
Moved together

"Upfront investment burden of new sites, including plants in the Philippines and Mexico" moved the same way as this thread, in the same document, in 2 of its 11 moves.

222222★123456
  1. ★This thread
  2. 1Upfront investment burden of new sites, including plants in the Philippines and Mexico2×
  3. 2Construction of production plants and expansion of equipment to meet customer needs2×
  4. 3Continued Operating and Net Losses and Material Event Relating to the Going Concern Assumption2×
  5. 4Foreign Exchange Fluctuation Risk Associated with Foreign-Currency-Denominated Assets and Overseas Subsidiaries2×
  6. 5Performance-based dividend policy, with the possibility of no dividends2×
  7. 6Transition to Operating Profitability and to a Management Structure Capable of Generating Stable Earnings2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Nippo's next results are scheduled for 2026-11-05. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.