Consec (9895) · RiskMaterialised
Impact on Order Intake and Operations from Natural Disasters Such as Torrential Rain, Typhoons and Earthquakes
First written in FY2019-Q2. 3 of 3 entries say "Materialised", first in FY2019-Q2. Latest entry: FY2023-Q2.
3entries
5years
0from disclosures
How it moved
Same theme, other companies
Business Impact Risk from Natural-Disaster Damage to Factories and Construction SitesA theme 13 companies write about · 12 as a headwind · 1 as a tailwind
Consec moved to the "Worse" side of this theme in 2018, 7 years before the typical company in this theme (2025).
The whole theme swung hardest in 2018: 2 of 7 companies on the "Worse" side.
0 other companies' latest entry also says "Materialised".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2023-Q2MaterialisedAnnual report
「Large-scale construction projects were delayed due to the impact of typhoon damage and other factors」
It was stated that the impact of natural disasters actually resulted in delays to the schedules of large-scale construction projects. - FY2022-Q2MaterialisedAnnual report
「In addition to the impact of the sharp increase in COVID-19 infections and record torrential and prolonged rains」
Record torrential and prolonged rains were actually cited as factors affecting the economy. However, this filing does not describe direct impacts on the Company, such as interruptions to its construction work or damage to its facilities caused by the disasters. - FY2019-Q2MaterialisedAnnual report
「Meanwhile, the Company was also affected by natural disasters, including the torrential rains in western Japan in July, typhoons making landfall and the earthquake in Hokkaido.」
The impact of natural disasters, including the torrential rains in western Japan, typhoons and the earthquake in Hokkaido, was actually reported. For specialty construction, lost opportunities due to delays in construction projects were specifically described, while damage was reported in the factory equipment-related business.