Ohba (9765) · InitiativeRestated

Acquiring Technologies Compatible with CIM and i-Construction

First written in FY2018. 3 of 7 entries say "Advanced", first in FY2019. Latest entry: FY2026.

7entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – FY2021RestatedFY2022 – FY20262018: 120182019: 120192020: 120202021: 120212022: 120222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies

The whole theme swung hardest in 2022: 1 of 11 companies on the "Worse" side.

5 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 26 companies compared. The sentences above are computed from all 26.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「We are promoting the advanced use of CIM technology to support the Ministry of Land, Infrastructure, Transport and Tourism's response from fiscal 2023 to its policy of making CIM (Construction Information Modeling) the default for its operations.」

    Technology enhancement and the response to DX, in anticipation of the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM the default for its directly managed operations from fiscal 2023, continue.
  2. FY2024RestatedAnnual report

    「There are many digital technology challenges that must be addressed promptly, including responding to the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM the default for its directly managed operations from fiscal 2023.」

    The advanced use of CIM technology and the response to DX, in anticipation of the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM the default for its directly managed operations from fiscal 2023, continue.
  3. FY2022RestatedAnnual report

    「We are promoting the advanced use of CIM technology in preparation for the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM (Construction Information Modeling) the default for its operations in 2023.」

    The advanced use of CIM technology and the response to DX, in anticipation of the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM the default for its operations in 2023, continue.
  4. FY2021AdvancedAnnual report

    「To acquire CIM (Construction Information Modeling) technology compatible with i-Construction, we have provided training primarily for young engineers since the 83rd fiscal year and are currently developing more than 100 CIM engineers. We are promoting preparations for the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM the default for its operations in 2023, while strengthening our response to DX.」

    The number of CIM engineers developed increased from more than 60 in the previous fiscal year to more than 100, and preparations for the Ministry of Land, Infrastructure, Transport and Tourism's policy of making CIM the default for its operations in 2023, together with stronger DX capabilities, were indicated.
  5. FY2020AdvancedAnnual report

    「To acquire CIM (Construction Information Modeling) technology compatible with i-Construction, we have provided training primarily for young engineers since the 83rd fiscal year and are currently developing more than 60 CIM engineers.」

    The number of CIM engineers developed increased from more than 50 in the previous fiscal year to more than 60.
  6. FY2019AdvancedAnnual report

    「To acquire CIM (Construction Information Modeling) technology compatible with i-Construction, we have provided training primarily for young engineers since the 83rd fiscal year and are currently developing more than 50 CIM engineers.」

    Training for young employees continued, and more than 50 CIM engineers were developed. Efforts are also being made to acquire advanced technologies, including those of CIM managers and CIM coordinators.
  7. FY2018First statedAnnual report

    「To acquire CIM (Construction Information Modeling) technology compatible with i-Construction, we have provided training for young employees at all offices since the 83rd fiscal year. In the 84th fiscal year, we also conducted an intensive CIM coordinator training program for mid-level employees and promoted three-dimensional design and planning initiatives at the individual office level to foster engagement with CIM, while continuing research and development with a view to linking this work to i-Construction in the future.」

    Training for young employees, intensive training for mid-level employees and three-dimensional design and planning are described for the first time as measures to acquire technologies compatible with CIM and i-Construction.
Moved together

"Improving Cash Flow and Reducing Interest-Bearing Debt" moved the same way as this thread, in the same document, in 3 of its 7 moves.

333222★123456
  1. ★This thread
  2. 1Improving Cash Flow and Reducing Interest-Bearing Debt3×
  3. 2Narrowing Quarterly Losses3×
  4. 3Flexible Capital Policy Through Share Repurchases3×
  5. 4Expansion of business operations through high-value-added proposal-based services2×
  6. 5Grant of Stock-Based Compensation Stock Options to Directors2×
  7. 6Building an Organization of 200 Professional Engineers2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Ohba yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Acquiring Technologies Compatible with CIM and i-Construction | OHBA CO.,LTD. (9765) | Komori