Komori
Maruken Lease (9763) · RiskMitigated

Accidents at Factories and Construction Sites

First written in FY2016. 4 of 6 entries say "Restated". Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY20252016: 120162017: 120172018: 120182019: 020192020: 020202021: 020212022: 120222023: 020232024: 020242025: 120252026: 12026
Same theme, other companies
Accident and Disaster Risk at Equipment Installation and Machinery Manufacturing SitesA theme 9 companies write about · 9 as a headwind · 0 as a tailwind

1 other company's latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「The Group will also strengthen heatstroke prevention measures required by law.」

    For the risk of accidents at factories and construction sites, the Group has added the strengthening of legally required heatstroke prevention measures to its existing safety equipment investment, pre-construction review meetings and safety patrols.
  2. FY2025RestatedAnnual report

    「If accidents occur at factories that repair and process heavy temporary steel materials for construction, or at construction sites where pile driving and extraction, earth-retaining structure installation, diaphragm wall construction, foundation work centred on cast-in-place pile methods, obstruction removal and other work are performed, the Group may be liable for compensation for losses arising from delays in steel material deliveries, construction schedules and other consequences.」

    The Group continues to identify the risks of accidents at factories and construction sites, delivery and construction delays, and compensation for losses even after expanding the relevant business operations.
  3. FY2022RestatedAnnual report

    「If the Group becomes liable for compensation for losses arising from accidents at factories that repair and process heavy temporary steel materials for construction, and at construction sites where pile driving and extraction, earth-retaining structure installation, diaphragm wall construction and other work are performed, as well as from delays in steel material deliveries, construction schedules and other consequences of such accidents, this may affect the Group's operating results and financial position.」

    The Group continues to identify the risks of accidents at factories and construction sites, delivery and construction delays, and compensation for losses.
  4. FY2018RestatedAnnual report

    「The Group may be liable for compensation for losses arising from accidents at factories and construction sites, as well as from delays in steel material deliveries, construction schedules and other consequences of such accidents.」

    The Group continues to identify the risks of accidents at factories and construction sites, delivery delays, construction delays and compensation for losses.
  5. FY2017RestatedAnnual report

    「The Group may be liable for compensation for losses arising from accidents at factories that repair and process heavy temporary steel materials for construction foundation work, and at construction sites where pile driving and extraction, earth-retaining structure installation, diaphragm wall construction and other work are performed, as well as from delays in steel material deliveries, construction schedules and other consequences of such accidents.」

    The Group continues to identify the risks of accidents at factories and construction sites, associated delivery and construction delays, and compensation for losses.
  6. FY2016First statedAnnual report

    「The Group may be liable for compensation for losses arising from accidents at factories that repair and process temporary steel materials for construction foundation work, and at construction sites where pile driving and extraction, earth-retaining structure installation, diaphragm wall construction and other work are performed, as well as from delays in steel material deliveries, construction schedules and other consequences of such accidents.」

    The Group identifies accidents at factories and construction sites, associated delivery and construction delays, and compensation for losses as risks.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Maruken Lease's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.