How it moved
ProgressHeldSoftenedWorseOtherFY2022-Q1 – FY2024-Q32016: 120162017: 320172018: 420182019: 320192020: 420202021: 320212022: 320222023: 320232024: 320242025: 220252026: 22026
Same theme, other companies
Increasing overseas sales and profitsA theme 99 companies write about · 0 as a headwind · 102 as a tailwind

The whole theme swung hardest in 2020: 13 of 73 companies on the "Worse" side.

12 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 99 companies compared. The sentences above are computed from all 99.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「Centered on Japan, Thailand through タイ丸建㈱, and China through 瑞馬丸建(安徽)工程支護科技有限公司, where the Group has bases, we aim to expand transactions with East Asian countries, optimize steel materials held at each base, and expand earnings, with the goal of increasing earnings related to overseas operations to at least 20% of consolidated earnings.」

    It continues to pursue expansion in East Asia centered on Thailand and China, with a target of overseas-related earnings accounting for at least 20%.
  2. 2026-05-28MitigatedGeneral Meetings of Shareholders

    「There were also signs of a partial recovery in the overseas business.」

    The description of the overseas business changed from delayed recovery to signs of a partial recovery.
  3. FY2026-H1MitigatedAnnual report

    「Domestic operations remained generally firm, and signs of recovery were observed at the overseas operating companies in Thailand and China.」

    The description has changed from the previous mention of delayed recovery in the overseas business to an explanation that signs of recovery were observed at the operating companies in Thailand and China.
  4. FY2025Delayed overseas business recovery and allowance for doubtful accountsAnnual report

    「In the overseas business, the Company recognized an allowance for doubtful accounts on certain receivables after comprehensively considering the prolonged downturn in the business environment and the collectibility of receivables.」

    While continuing its policy of overseas expansion centered on East Asia, the Company recognized an allowance for doubtful accounts in the overseas business based on the downturn in the business environment and the collectibility of receivables.
  5. FY2025-H1RestatedAnnual report

    「Domestic operations remained generally firm, but the overseas operating companies in Thailand and China are taking time to recover their performance.」

    It continues to describe the situation as domestic operations remaining generally firm while the overseas operating companies in Thailand and China are taking time to recover their performance.
  6. FY2024RaisedAnnual report

    「Centered on Japan, Thailand through タイ丸建㈱, and China through 瑞馬丸建(安徽)工程支護科技有限公司, where the Group has bases, we aim to expand transactions with East Asian countries, optimize steel materials held at each base, and expand earnings, with the goal of increasing earnings related to overseas operations to at least 20% of consolidated earnings.」

    Regarding overseas expansion centered on Thailand and China, it has set a new quantitative target of increasing transactions with East Asian countries and raising overseas-related earnings to at least 20% of consolidated earnings.
  7. FY2024-Q3RestatedAnnual report

    「Under these conditions, the overseas operating companies in Thailand and China experienced delayed earnings recovery, while domestic operations remained generally firm.」

    It continues to describe the situation as domestic operations remaining generally firm while earnings recovery at the overseas operating companies in Thailand and China is delayed.
  8. FY2024-Q2Domestic operations firm, overseas recovery delayedAnnual report

    「Under these conditions, the Group's performance remained generally firm in Japan, while the overseas operating companies in Thailand and China showed delays in their recovery.」

    It explains that domestic operations remained generally firm, while the overseas operating companies in Thailand and China showed delayed recovery.
  9. FY2023RestatedAnnual report

    「Under these conditions, the overseas operating companies in Thailand and China were on a recovery trend from the COVID-19 pandemic but continued to be affected by delays in construction progress. In Japan, however, the heavy temporary steel material business generally remained firm, partly owing to progress on delayed projects.」

    It reconfirms that the domestic heavy temporary steel material business remained generally firm as delayed projects progressed, while recovery trends and delays in construction progress coexisted in Thailand and China.
  10. FY2023-Q3Domestic heavy temporary steel material business progressing, overseas construction delays continuingAnnual report

    「Under these conditions, the Group's core heavy temporary steel material business in Japan progressed smoothly, while the operating companies in Thailand and China were on a recovery trend from the COVID-19 pandemic but continued to be affected by delays in construction progress and postponed construction starts.」

    While the domestic core heavy temporary steel material business progressed smoothly, the overseas businesses in Thailand and China were on a recovery trend but continued to experience delays in construction progress and postponed construction starts.
  11. FY2023-Q2Overseas business recovery and continuing delays and deterioration in profitabilityAnnual report

    「Although the overseas operating companies, タイ丸建㈱ in Thailand and 瑞馬丸建(安徽)工程支護科技有限公司 in China, were on a recovery trend from the COVID-19 pandemic, they continued to be affected by postponed construction starts and delays in construction progress, resulting in difficult profitability conditions.」

    It explains that the overseas businesses in Thailand and China were on a recovery trend from the COVID-19 pandemic, while postponed construction starts and delays in construction progress continued to create difficult profitability conditions.
  12. FY2022RestatedAnnual report

    「Specifically, タイ丸建㈱ was subject to strict restrictions due to the COVID-19 pandemic during the fiscal year under review, which delayed the start and progress of construction. However, we will maintain and strengthen our cooperative relationship with our partner Italian-Thai Development Public Co.,Ltd. and seek to improve earnings by responding to development demand accompanying the resumption of economic activity in Thailand.」

    It continues to develop the domestic earnings base and overseas operations, noting construction delays in Thailand while targeting demand capture through cooperation with its partner.
  13. FY2022-Q3Delays in construction progress and commencement of work in the Thai businessAnnual report

    「Under these conditions, the Group's business performance progressed smoothly in Japan, although demand differed by region. Overseas, タイ丸建㈱ in Thailand, where restrictions including COVID-19 lockdowns were imposed, was affected by delays in construction progress and postponed construction starts.」

    While domestic operations progressed smoothly despite regional differences in demand, overseas operations were affected by delays in construction progress and postponed construction starts at タイ丸建 due to lockdowns and other restrictions.
  14. FY2022-Q1China progressing smoothly, Thailand facing difficult conditionsAnnual report

    「Overseas, 瑞馬丸建(安徽)工程支護科技有限公司 in China performed smoothly, while タイ丸建㈱ in Thailand continued to face difficult conditions due to the COVID-19 pandemic.」

    It explains that the Chinese joint venture performed smoothly, while タイ丸建 continued to face difficult conditions due to the COVID-19 pandemic.
  15. FY2021AdvancedAnnual report

    「As its third overseas project, following タイ丸建㈱ in Thailand and 中鉄伊紅鋼矢板有限公司 in China, the Company jointly with 伊藤忠丸紅鉄鋼㈱ subscribed in August 2020 to a third-party allotment by the joint venture 瑞馬丸建(安徽)工程支護科技有限公司, established to conduct a heavy temporary steel material joint venture business in China using an environmentally considerate steel earth-retaining construction method, and launched the business. The Company will work to expand its heavy temporary steel material business in China.」

    Regarding its third overseas project in China, it subscribed to a third-party allotment and launched the joint venture, moving into the stage of future expansion.
  16. FY2021-Q3RestatedAnnual report

    「On 7 August 2020, the Company established 丸建投資合同会社 through a joint investment with 伊藤忠丸紅鉄鋼株式会社, holding a 60% equity interest, and made it a consolidated subsidiary. On 14 August of the same year, through that company, it subscribed to a third-party allotment by 瑞馬丸建(安徽)工程支護科技有限公司 that resulted in a 40% equity interest, making it an equity-method affiliate.」

    Regarding overseas expansion, it reconfirms the investment in the Chinese heavy temporary steel material joint venture and the investee's status as an equity-method affiliate as descriptions of the business.
  17. FY2021-Q2AdvancedAnnual report

    「On 14 August of the same year, through the company, the Company subscribed to a third-party allotment by 瑞馬丸建(安徽)工程支護科技有限公司 that resulted in a 40% equity interest, making it an equity-method affiliate.」

    Regarding overseas operations, the investment in the Chinese heavy temporary steel material joint venture was completed, and the investee became an equity-method affiliate.
  18. FY2021-Q1RestatedAnnual report

    「Over the medium to long term, funds will be needed in Japan for M&A, capital participation and the development of new products under the medium-term management plan, and overseas for additional purchases of heavy temporary steel materials by タイ丸建㈱ and investment in a Chinese heavy temporary steel material joint venture. We will prepare for these funding needs.」

    It reconfirms additional steel material purchases by タイ丸建 and investment in a Chinese heavy temporary steel material joint venture as funding needs for overseas expansion. It does not mention the completion or commencement of any new overseas project.
  19. FY2020AdvancedAnnual report

    「For existing overseas projects, we will strengthen our cooperative relationships with partners, further increase our steel material holdings and make capital investments to meet demand from large-scale development and infrastructure projects, and seek to improve earnings through quantitative expansion. For new projects, we are assessing demand for heavy temporary steel materials in neighboring countries and promoting the adoption of the construction method, and have begun work on a third overseas project.」

    Regarding overseas expansion, including Thailand, China and Myanmar, it explicitly states that the Company has begun work on a third overseas project in addition to expanding existing projects.
  20. FY2020-Q3AdvancedAnnual report

    「In addition, with the aim of conducting a heavy temporary steel material business in China, the Company is proceeding with the establishment of a new company, 瑞馬丸建(安徽)工程支護科技有限公司, targeted for around March 2020.」

    Regarding overseas expansion, the establishment of a new company for a heavy temporary steel material business in China has been formalized, with procedures proceeding toward completion around March 2020.
  21. FY2020-Q2AdvancedAnnual report

    「② Developing the domestic earnings base and actively expanding overseas. As one of the specific measures described above, namely “active overseas expansion,” the Company agreed with Shwe Taung Development Co.,Ltd., a leading Myanmar conglomerate, to begin investigation and research into a heavy temporary steel material leasing business in Myanmar, and signed a memorandum of understanding.」

    It reiterates the domestic earnings base and overseas expansion as measures under the new plan, and has moved into the specific investigation and research stage for overseas expansion by signing a memorandum of understanding with a leading Myanmar conglomerate.
  22. FY2020-Q1RestatedAnnual report

    「In the construction industry to which the Group belongs, construction demand remained firm, centered on large-scale projects in the Tokyo metropolitan area, but the effects of labor shortages and rising costs, including steel material prices and transportation expenses, continued.」

    It continues to explain that domestic construction demand, centered on large-scale projects in the Tokyo metropolitan area, remains firm.
  23. FY2019-Q3RestatedAnnual report

    「Accordingly, the rental utilization and sales volumes of the heavy temporary steel materials handled by the Company also increased year on year.」

    It continues to state that rental utilization and sales volumes of heavy temporary steel materials increased in line with construction demand, centered on large-scale projects in the Tokyo metropolitan area.
  24. FY2019-Q2AdvancedAnnual report

    「Accordingly, the rental utilization and sales volumes of the heavy temporary steel materials handled by the Company also increased year on year.」

    It states that rental utilization and sales volumes of heavy temporary steel materials increased year on year in line with construction demand, centered on large-scale projects in the Tokyo metropolitan area.
  25. FY2019-Q1AdvancedAnnual report

    「As in the previous fiscal year, construction demand remained firm, centered on redevelopment in the Tokyo metropolitan area, Olympic and Paralympic-related projects, and infrastructure development. Accordingly, both the rental utilization and sales volumes of the heavy temporary steel materials handled by the Company increased.」

    Domestic construction demand, centered on redevelopment in the Tokyo metropolitan area and other projects, remained firm, and domestic demand was captured through increases in rental utilization and sales volumes of heavy temporary steel materials.
  26. FY2018AdvancedAnnual report

    「Ordinary income increased ¥123 million, or 6.5%, to ¥1,231 million, and net income attributable to owners of the parent increased ¥53 million, or 5.8%, to ¥983 million, owing to higher equity-method investment gains from タイ丸建㈱ in Thailand, where public infrastructure development is progressing, and 協友リース㈱, which handles large-scale temporary steel materials.」

    In addition to domestic construction demand, business expansion by overseas and affiliated companies such as タイ丸建 is reflected in earnings as an increase in equity-method investment gains.
  27. FY2018-Q3RestatedAnnual report

    「In Thailand, large-scale projects, including airport expansion work, have begun to move forward in earnest, and タイ丸建㈱ responded by making additional purchases of heavy temporary steel materials.」

    It continues to mention the full-scale launch of large-scale projects in Thailand and additional purchases of heavy temporary steel materials. Airport expansion work is cited as an example, but there is no new mention of completion or achievement.
  28. FY2018-Q2RestatedAnnual report

    「In Thailand, where large-scale projects, particularly public construction investment, have begun to move forward in earnest, タイ丸建㈱ responded by making additional purchases of heavy temporary steel materials.」

    It continues to mention the launch of large-scale projects in Thailand and additional purchases of heavy temporary steel materials by タイ丸建, following the previous quarter.
  29. FY2018-Q1AdvancedAnnual report

    「In Thailand, where large-scale projects, particularly public construction investment, have begun to move forward in earnest, タイ丸建㈱ responded by making additional purchases of heavy temporary steel materials.」

    As part of its overseas expansion, large-scale projects in Thailand moved forward in earnest, and タイ丸建 made additional purchases of heavy temporary steel materials.
  30. FY2017AdvancedAnnual report

    「Increased sales and construction work on large-scale projects in the Tokyo metropolitan area and earthquake-reconstruction-related projects in Tohoku resulted in revenue of ¥21,627 million, up ¥1,171 million, or 5.7%, from the previous fiscal year.」

    Sales and construction work increased in the Tokyo metropolitan area and Tohoku, while overseas orders for large-scale projects also increased, mainly for Thai Maruken's public construction business.
  31. FY2016First statedAnnual report

    「We will work to further strengthen our earnings base by reliably capturing domestic demand, expanding our overseas operations, and broadening our business scope, including through new strategic investments.」

    Identifies capturing domestic demand and expanding overseas operations as means of broadening the business scope and strengthening the earnings base.
Moved together

"Improving the Equity Ratio and Reducing Net Interest-Bearing Debt" moved the same way as this thread, in the same document, in 8 of its 31 moves.

886666★123456
  1. ★This thread
  2. 1Improving the Equity Ratio and Reducing Net Interest-Bearing Debt8×
  3. 2Southeast Asian Expansion Centered on THAI MARUKEN8×
  4. 3Strengthening the Earnings Base of the Core Business6×
  5. 4Dividend Payout Ratio of Approximately 25% and Annual Dividend of ¥86×
  6. 5Thorough Safety and Health Management6×
  7. 6Higher Sales and Lower Rental Earnings in the Heavy Temporary Steel Structure Business6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Maruken Lease's next results are scheduled for 2026-11-06. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-05-28: "Mitigated".