Delivery Delays Due to Semiconductor Supply Shortages

First written in FY2022-Q2. 2 of 5 entries say "Restated". Latest entry: FY2025.

5entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2022-Q3MitigatedFY2023-Q1RestatedFY2024-Q1 – FY20252021: 120212022: 220222023: 120232024: 020242025: 12025
Same theme, other companies
Supply Constraints and Inventory Stockouts of IT Equipment Due to Semiconductor ShortagesA theme 10 companies write about · 10 as a headwind · 0 as a tailwind

2 other companies' latest entry also says "Dropped".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025DroppedAnnual report
    No specific reference to delivery delays caused by the semiconductor shortage was found in the discussion of business conditions and business risks for the current fiscal year.
  2. FY2024-Q1RestatedAnnual report

    「In the Platform & Services segment, although operations and platform construction projects remained solid, revenue was ¥6.897 billion, down 9.2% year on year, due in part to the反動 of temporarily higher product sales in the same period of the previous fiscal year, which had been affected by delivery delays caused by the semiconductor shortage.」

    The impact of delivery delays caused by the semiconductor shortage, together with the反動 of higher product sales in the same period of the previous fiscal year, was cited as a factor weighing on segment revenue in the current quarter.
  3. FY2023-Q1MitigatedAnnual report

    「In the Platform & Services segment, revenue was ¥7.595 billion, up 24.7% year on year, due to strong performance in projects such as operations platform design and construction, as well as the resolution of timing differences caused by the impact of the semiconductor shortage in the previous fiscal year.」

    It was stated that the timing differences related to delivery delays caused by the semiconductor shortage in the previous fiscal year had been resolved during the current quarter.
  4. FY2022-Q3RestatedAnnual report

    「In the Core Products segment, despite the impact of a large project in the previous fiscal year and delivery delays caused by the semiconductor shortage, system operations design for the information and communications industry remained solid. In addition, following the consolidation of I-NET Rely Corporation Co., Ltd. as a subsidiary, revenue was ¥18.576 billion, compared with ¥17.379 billion in the same period of the previous fiscal year.」

    It was stated that delivery delays caused by the semiconductor shortage continued to occur.
  5. FY2022-Q2MaterialisedAnnual report

    「In the Core Products segment, despite the impact of a large project in the previous fiscal year and delivery delays caused by the semiconductor shortage, system operations design for the information and communications industry remained solid. In addition, following the consolidation of I-NET Rely Corporation Co., Ltd. as a subsidiary, revenue was ¥12.07 billion, compared with ¥11.857 billion in the same period of the previous fiscal year.」

    It was stated that delivery delays caused by the semiconductor shortage actually occurred in the Core Products segment.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Dts's next results are scheduled for 2026-11-02. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Delivery Delays Due to Semiconductor Supply Shortages | DTS CORPORATION (9682) | Komori