Komori
Kin-Ei Corp. (9636) · InitiativeAdvanced

Creating Comfortable and Safe Buildings Through Facility Upgrades

First written in FY2017-Q2. 27 of 34 entries say "Advanced", first in FY2017-Q3. Latest entry: FY2027-H1.

34entries
11years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q3 – FY2018AdvancedFY2020 – FY2022-Q2AdvancedFY2024 – FY2027-H12016: 22017: 420172018: 420182019: 320192020: 220202021: 320212022: 320222023: 420232024: 220242025: 220252026: 52026
Same theme, other companies
Improving Comfort and Safety through Facility Upgrades in Owned BuildingsA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2027-H1AdvancedAnnual report

    「In the real estate segment, at the Kintetsu Apollo Building we carried out air-conditioning equipment maintenance, surveillance camera expansion and upgrades, and preparation of leased floors and common-area sections associated with the move-in of a large tenant in the second half of the fiscal year, maintaining and improving building functionality and safety and enhancing its appearance. At Abeno Lucias, we systematically worked on upgrades to drainage, electrical room, power meter and central monitoring equipment, advancing efforts to create a safer and more comfortable building.」

    At the Apollo Building, carried out air-conditioning equipment work, surveillance camera upgrades and space preparation associated with the large tenant scheduled to move in during the second half of the fiscal year. At the Lucias Building, also advanced upgrades to drainage, electrical room, power meter and central monitoring equipment.
  2. 2026-09-08AdvancedEarnings

    「At Kintetsu Apollo Building, we maintained the air-conditioning equipment, added and renewed security cameras, and improved the leased-floor and common-area sections in connection with the move-in of a major tenant in the second half, thereby maintaining and improving the building’s functions and safety and enhancing its appearance. At Abeno Lucias, we systematically worked on upgrades to drainage equipment, electrical-room equipment, power-meter equipment and the central monitoring system, promoting the development of a safer and more comfortable building.」

    The company carried out and promoted specific facility maintenance and upgrades at Kintetsu Apollo Building and Abeno Lucias.
  3. FY2026AdvancedAnnual report

    「In the real estate segment, at the Kintetsu Apollo Building we carried out restroom renovations, maintenance and upgrades related to air-conditioning and water supply and drainage equipment, and surveillance camera expansion and upgrades, improving building safety and comfort. At Abeno Lucias, we systematically worked on restroom renovations, upgrades to electrical room equipment, central monitoring equipment, and air-conditioning and water supply and drainage equipment, as well as repairs to fire shutters, advancing efforts to create a safer and more comfortable building.」

    Carried out and advanced specific upgrades and repairs at the Apollo and Abeno Lucias buildings to restrooms, air-conditioning, water supply and drainage, surveillance and central monitoring, electrical room and fire-prevention equipment.
  4. FY2026-H1AdvancedAnnual report

    「At the Apollo Building, in addition to maintenance and upgrades related to electrical, air-conditioning and water supply and drainage equipment, we expanded the surveillance camera system, maintaining and improving building functionality and safety. At the Lucias Building, we systematically worked on upgrades to electrical room equipment, central monitoring equipment, and air-conditioning and water supply and drainage equipment, advancing efforts to create a safer and more comfortable building.」

    Carried out and advanced specific maintenance and upgrades at the Apollo and Lucias buildings to electrical, air-conditioning, water supply and drainage, surveillance camera and central monitoring equipment.
  5. FY2025AdvancedAnnual report

    「At the Kintetsu Apollo Building, we carried out various works, including upgrades to the gas cogeneration system, wastewater pipes and emergency lights, improving building safety and comfort and promoting energy efficiency and CO2 reduction. At Abeno Lucias, we systematically worked on upgrades to air-conditioning equipment, electrical room equipment and water supply and drainage equipment, as well as repairs to fire shutters, advancing efforts to create a safer and more comfortable building.」

    Carried out upgrades and repairs to cogeneration, piping, emergency lighting, air-conditioning, electrical room, water supply and drainage, and fire-prevention equipment at the Apollo and Lucias buildings.
  6. FY2025-H1AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we carried out various works, including replacement of miscellaneous wastewater pipes and emergency lights, balcony waterproofing, and fire-prevention, disaster-prevention and water supply equipment associated with attracting new tenants, improving building functionality and safety. At the Lucias Building, we systematically carried out upgrades to electrical room equipment, air-conditioning equipment, wastewater pipes and the elevated domestic water tank, as well as maintenance of chillers, advancing efforts to create a safer and more comfortable building.」

    Carried out specific upgrades and maintenance at the Apollo and Lucias buildings to piping, waterproofing, emergency lighting, disaster-prevention, water supply, electrical room, air-conditioning and chiller equipment.
  7. FY2024AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we carried out various works, including upgrades to air-conditioning units, air-conditioning pumps and fire shutters, restroom repairs and cooling tower maintenance, working to improve building safety and comfort and promote energy efficiency. At the Lucias Building, we systematically worked on upgrades to air-conditioning equipment and power receiving and transformation equipment, as well as repairs to fire shutters and other safety equipment, advancing efforts to create a safer and more comfortable building.」

    Carried out and advanced upgrades and repairs to air-conditioning, pumps, fire-prevention equipment, restrooms, cooling towers and power receiving and transformation equipment at the Apollo and Lucias buildings.
  8. FY2024-Q3RestatedAnnual report

    「We are working systematically on facility and other upgrades, advancing efforts to create safer and more comfortable buildings while」

    Continued efforts to create safer and more comfortable buildings through systematic facility upgrades.
  9. FY2024-Q2AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we carried out air-conditioning unit maintenance and various works, including disaster-prevention and water supply and drainage equipment associated with attracting new tenants, improving building functionality. At the Lucias Building, we systematically worked on upgrades to extra-high-voltage electrical room equipment, air-conditioning control equipment and battery storage equipment, as well as maintenance of chillers and air-conditioning units, advancing efforts to create a safer and more comfortable building.」

    At the Apollo Building, maintained air-conditioning units and disaster-prevention, water supply and drainage equipment. At the Lucias Building, advanced upgrades and maintenance of extra-high-voltage electrical room equipment, air-conditioning control equipment, battery storage equipment and chillers.
  10. FY2024-Q1RestatedAnnual report

    「We will work to create a safe and comfortable environment at our facilities, while」

    Continued to report on efforts to create an environment that improves facility safety and comfort.
  11. FY2023AdvancedAnnual report

    「At the Apollo Building, we carried out various works, including upgrades to air-conditioning units, fire shutters and the domestic water booster pump, and converted stairwell lighting fixtures to LED, improving building safety and comfort, promoting energy efficiency and strengthening functionality. At the Lucias Building, we systematically worked on upgrades to supply fan equipment, air-conditioning equipment, extra-high-voltage receiving equipment and battery storage equipment, as well as repairs to fire shutters, advancing efforts to create a safer and more comfortable building.」

    Carried out and advanced specific upgrades and repairs at both buildings to air-conditioning, power-receiving, battery storage, fire-prevention and lighting equipment.
  12. FY2023-Q3RestatedAnnual report

    「We are working systematically on facility and other upgrades, advancing efforts to create safer and more comfortable buildings while」

    Continued efforts to create safer and more comfortable buildings through facility upgrades in the real estate business.
  13. FY2023-Q2AdvancedAnnual report

    「At the Apollo Building, we carried out various works, including air-conditioning equipment maintenance and space preparation associated with attracting new tenants, improving building functionality. At the Lucias Building, we systematically worked on upgrades to the air-conditioning control equipment, extra-high-voltage receiving equipment and battery storage equipment, advancing efforts to create a safer and more comfortable building.」

    Carried out and advanced air-conditioning and space preparation works at the Apollo Building, and upgrades to the air-conditioning control, extra-high-voltage receiving and battery storage equipment at the Lucias Building.
  14. FY2022AdvancedAnnual report

    「At the Apollo Building, we carried out various works, including upgrades to the emergency public-address system, security cameras and air-conditioning units, conversion of stairwell lighting fixtures to LED, and space preparation associated with attracting tenants, improving building functionality. At the Lucias Building, we systematically worked on upgrades to supply and exhaust fans, the air-conditioning control equipment and battery storage equipment, as well as repairs to fire shutters, advancing efforts to create a safer and more comfortable building.」

    Carried out specific upgrades and repairs at both buildings to public-address systems, security equipment, air-conditioning, lighting, battery storage and fire-prevention equipment.
  15. FY2022-Q3RestatedAnnual report

    「We will continue to systematically advance facility upgrades, improvement works and related projects, further improving building functionality and working to create safe and comfortable environments.」

    Continued the policy of systematically advancing facility upgrades and improvement works at both buildings to improve safety, comfort and functionality.
  16. FY2022-Q2AdvancedAnnual report

    「At the Apollo Building, in addition to upgrading security cameras inside elevators, we replaced exhaust fans and carried out various works, including space preparation associated with attracting new tenants, improving building functionality. At the Lucias Building, we systematically worked on upgrades to exhaust fans and fire-fighting equipment and repairs to fire shutters, advancing efforts to create a safer building.」

    Carried out upgrades and repairs to security cameras, exhaust fans, fire-fighting equipment and fire shutters at the Apollo and Lucias buildings, making concrete progress on facility improvements.
  17. FY2021AdvancedAnnual report

    「At the Apollo Building, we completed the restroom renovations on the second through sixth floors that had been carried out in stages, systematically replaced air-conditioning units, and carried out various works including wastewater pipe replacement, improving services and building functionality. At the Lucias Building, we worked on upgrades to fire-fighting equipment and proceeded in stages with upgrades to the air-conditioning control equipment and other air-conditioning-related equipment, advancing efforts to create a safer and more comfortable building.」

    Reported completion of restroom renovations on the second through sixth floors of the Apollo Building, replacement of air-conditioning units and wastewater pipes, and upgrades to fire-fighting and air-conditioning-related equipment at the Lucias Building.
  18. FY2021-Q2AdvancedAnnual report

    「At the Apollo Building, we proceeded in stages with restroom renovations from the second through sixth floors and carried out various works, including wastewater pipe replacement and digital signage upgrades, improving building functionality and services. At the Lucias Building, we worked on upgrades to fire-fighting equipment and repairs to fire shutters, and proceeded in stages with upgrades to the air-conditioning control equipment, advancing efforts to create a safer and more comfortable building.」

    Carried out and advanced upgrades and repairs to restrooms, wastewater pipes, digital signage, fire-fighting equipment, fire shutters and air-conditioning control equipment at the Apollo and Lucias buildings.
  19. FY2020AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we proceeded in stages with restroom renovations from the first basement level through the third basement level, systematically expanded the security camera system, converted lighting fixtures in the third-floor basement and other common areas to LED, and carried out various works including replacement of the air-conditioning unit serving the south system on the first floor, advancing efforts to create a safer and more comfortable building. At the Lucias Building, in addition to upgrading the parking control system and proceeding in stages with maintenance and upgrades of the air-conditioning control equipment and air-conditioning equipment, we refurbished common areas and converted lighting fixtures to LED on the 15th and 16th floors, improving building functionality.」

    Carried out specific upgrades and improvements to restrooms, air-conditioning, security, lighting and parking control systems at the Apollo and Lucias buildings.
  20. FY2020-Q3RestatedAnnual report

    「In the real estate segment, we systematically carried out various improvement works throughout the Apollo and Lucias buildings, advancing efforts to create more comfortable and safer buildings.」

    Continued measures to improve comfort and safety through various improvement works at both buildings. No newly identified completion milestone was reported.
  21. FY2020-Q2AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we carried out various works, including security camera expansion and LED conversion of lighting fixtures in the third-floor basement and other common areas, improving building functionality. At the Lucias Building, in addition to upgrading the parking control system, we proceeded in stages with upgrades to the air-conditioning control equipment and air-conditioning units, advancing efforts to create a safer and more comfortable building.」

    At the Apollo Building, expanded the security camera system and converted common-area lighting to LED. At the Lucias Building, upgraded the parking control system and air-conditioning equipment, making progress on facility improvements.
  22. FY2019AdvancedAnnual report

    「At the Apollo Building, we completed the seismic reinforcement work and, in conjunction with it, carried out various improvement works on the building exterior and in various parts of the interior, while」

    Completed seismic reinforcement work at the Apollo Building and carried out various improvement works on the exterior and interior.
  23. FY2019-Q3AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we actively proceeded with seismic reinforcement and related work that began in October of the previous year, carried out security camera expansion and LED conversion of lighting fixtures in common areas on the fourth and fifth floors and elsewhere, and advanced efforts to create a more comfortable and safer building. At the Lucias Building, we also carried out work on the emergency public-address system and other facilities, advancing efforts to create a safer and more comfortable building while working to reduce expenses.」

    Continued to advance seismic reinforcement work at the Apollo Building and carried out security camera expansion and LED conversion of lighting in common areas on the fourth and fifth floors and elsewhere. Also carried out work on the emergency public-address system and other facilities at the Lucias Building.
  24. FY2019-Q2AdvancedAnnual report

    「In the real estate segment, at the Apollo Building we actively proceeded with seismic reinforcement and related work that began in October of the previous year, and carried out security camera expansion and LED conversion of lighting fixtures in the fourth-floor basement mechanical room and elsewhere, improving building functionality and safety and reducing expenses. At the Lucias Building, in addition to replacing the emergency public-address system, we proceeded in stages with upgrades to the air-conditioning control equipment and air-conditioning units and carried out LED conversion of lighting fixtures in common areas and the parking facility, advancing efforts to create a safer and more comfortable building while working to reduce expenses.」

    Advanced seismic reinforcement work at the Apollo Building and carried out security camera expansion and LED conversion of lighting fixtures. At the Lucias Building, also proceeded with upgrades to the emergency public-address system, air-conditioning equipment and lighting, making concrete progress on facility improvements.
  25. FY2019-Q1RestatedAnnual report

    「Total assets at the end of the first quarter accounting period increased by ¥230.682 million from the end of the previous fiscal year to ¥5,242.898 million, mainly due to an increase in property, plant and equipment associated with the ongoing seismic reinforcement work at the Apollo Building.」

    Reported that seismic reinforcement work at the Apollo Building was ongoing and that property, plant and equipment had increased in connection with the work. No new completion milestone was reported.
  26. FY2018AdvancedAnnual report

    「At the Apollo Building, in addition to commencing seismic reinforcement work in October of the previous year, we upgraded the central monitoring equipment, disaster-prevention equipment and air-conditioning units, replaced and expanded the security camera system, and converted lighting in the common areas on the second and third floors to LED, improving building functionality and safety and reducing expenses.」

    In addition to commencing seismic reinforcement work, carried out upgrades and improvements to the central monitoring equipment, disaster-prevention equipment, air-conditioning units, security cameras and common-area lighting.
  27. FY2018-Q3AdvancedAnnual report

    「大日本土木㈱ 5 October 2017 October 2017–January 2019 Seismic reinforcement work for the Kintetsu Apollo Building」

    Concluded a construction contract for seismic reinforcement work at the Apollo Building and set the construction period from October 2017 through January 2019.
  28. FY2018-Q2AdvancedAnnual report

    「At the Apollo Building, we converted lighting in the common areas on the second and third floors to LED and replaced miscellaneous wastewater pipes in the lower floors, reducing building expenses and improving functionality. At the Lucias Building, we continued the planned replacement and expansion of the security camera system and proceeded in stages with upgrades to the air-conditioning control system and air-conditioning units, advancing efforts to create a safer and more comfortable building.」

    Reported progress on LED conversion and miscellaneous wastewater pipe replacement at the Apollo Building, and on security camera replacement and expansion and air-conditioning-related facility upgrades at the Lucias Building.
  29. FY2018-Q1AdvancedAnnual report

    「As the design has now been completed, we will commence construction.」

    Reported completion of the design and commencement of construction for seismic reinforcement of the Apollo Building. The estimated construction cost is ¥1,250 million, with construction scheduled to begin in October 2017 and be completed in January 2019.
  30. FY2017AdvancedAnnual report

    「At the Apollo Building, we completed the replacement of 3 escalators serving the third through fifth floors as the final phase of a project implemented in stages. We also carried out refurbishment work in various parts of the building and upgraded fire-fighting equipment, air-conditioning units and other facilities to improve building functionality. At the Lucias Building, we continued the planned replacement and expansion of the security camera system, upgraded the central monitoring system, and proceeded in stages with upgrades to disaster-prevention equipment and the air-conditioning control system, advancing efforts to create a safer and more comfortable building.」

    Reported completion of the final phase of the escalator project, as well as progress on upgrades to the central monitoring system, disaster-prevention equipment and air-conditioning control system.
  31. FY2017-Q3AdvancedAnnual report

    「At the Apollo Building, we completed the final phase of the escalator replacement project and carried out refurbishment work on the upper floors, advancing efforts to create a more comfortable and safer building.」

    Completed the final phase of the escalator replacement project. Also carried out refurbishment work on the upper floors and converted lobby lighting throughout the building to LED, advancing facility improvements.
  32. FY2017-Q2First statedAnnual report

    「We promoted interior improvement and facility renewal and enhancement work at various locations in the buildings. At Lucias Building, we also renewed and expanded security camera facilities in the underground parking area and elsewhere, promoting the creation of more comfortable and safer buildings.」

    Identified interior improvements, facility upgrades and enhancements, and security-camera renewal and expansion as specific measures.
Moved together

"Revenue and Earnings Growth Trend" moved the same way as this thread, in the same document, in 15 of its 34 moves.

15139986★123456
  1. ★This thread
  2. 1Revenue and Earnings Growth Trend15×
  3. 2Improving Comfort Inside Theaters Through Seat Renovations13×
  4. 3Improving Financial Strength and Reducing Borrowings through Operating Cash Flow9×
  5. 4Concentration of Business Operations in Abeno-ku, Osaka, and Risk of Major Earthquakes9×
  6. 5Securing Rental Revenue and Maintaining and Improving Building Occupancy Rates8×
  7. 6Improving Profitability with a Focus on ROA and Operating Margin6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Kin-Ei Corp. yet. It last moved in the Earnings of 2026-09-08: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Creating Comfortable and Safe Buildings Through Facility Upgrades | Kin-Ei Corp. (9636) | Komori