Announced details
Relationship between the recipient of the Japan Society of Civil Engineers Award and the awarding organization
Tanaka Prize, Works Division (New Construction)
Technology Award (Group I)
Japan Society of Civil Engineers
Yamakita Town, Kanagawa Prefecture (Shin-Kaina Segawa Bridge), Class A river Yodo River (Yodogawa Great Weir Lock)
In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.
Japan Society of Civil Engineers, “FY2025 Japan Society of Civil Engineers Award Recipients”
| Item | Details |
|---|---|
| Names of Products / Services Covered | Shin-Tomei Expressway, “Shin-Kaina Segawa Bridge”, Construction technology for lock gates and lock chambers in a river area with challenging construction conditions (Yodogawa Great Weir Lock Structural Development Project) |
| Counterparty | Japan Society of Civil Engineers |
| Relationship with the Company | Relationship between the recipient of the Japan Society of Civil Engineers Award and the awarding organization |
| Launch date | Project planned with a view to commencing service for Expo 2025 Osaka, Kansai. Specific service commencement date: Not disclosed |
| Applicable area | Planning, design, fabrication, construction and maintenance of bridges, Construction of lock gates and lock chambers in river areas, Use in the event of disasters, Alternative to land transport, Regional Revitalization |
| Award/certification name | Tanaka Prize, Works Division (New Construction), Technology Award (Group I) |
| Awarding / certifying body | Japan Society of Civil Engineers |
| Location | Yamakita Town, Kanagawa Prefecture (Shin-Kaina Segawa Bridge), Class A river Yodo River (Yodogawa Great Weir Lock) |
| Location scale | Shin-Kaina Segawa Bridge: Upbound carriageway, 5 PC spans, bridge length 353 m, Shin-Kaina Segawa Bridge: Downbound carriageway, 6 PC spans, bridge length 398 m, Yodogawa Great Weir Lock: width 20 m, length 70 m |
| Source | Japan Society of Civil Engineers, “FY2025 Japan Society of Civil Engineers Award Recipients” |
Items this document does not state (8)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.For the Shin-Kaina Segawa Bridge, the company comprehensively undertook a wide range of design work for the bridge and related structures. For the Yodogawa Great Weir Lock, it rationalized the work schedule and construction planning using DX, adopted precast construction, optimized temporary works planning and took other measures under challenging construction conditions, thereby ensuring the schedule, quality and safety and contributing to the smooth progress of the project.