Our company-designed hydropower facility has been completed, and we received a letter of appreciation from the Nagano Prefectural Enterprise Bureau.

The Koshaku no Shizuku Hydroelectric Power Plant (「越百のしずく発電所」), for which the Company was responsible for the design, was completed, and the Company received a letter of appreciation in recognition of its design work. The plant began operations in October 2025.

Worth reading
58In focus
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
1500
kW (maximum output)
Wording
Definitive
How definitive the wording is.

Announced details

Koshaku no Shizuku Hydroelectric Power Plant (「越百のしずく発電所」)
Applicable field (uses covered by this announcement)

Hydroelectric power generation, effective use of unused resources, local energy production for local consumption

Launch dateOctober 2025 (operations commenced; actual)
What the company reported numerically
Quantitative Effects

Contributes to increased power generation, reduced maintenance and management costs for Iijima Town’s water supply, and local energy production for local consumption (figures are Not disclosed)

Relationship between the counterparty and the company
CTI Engineering Co.,Ltd.9621
Relationship with the Company

The Company was responsible for designing the plant as a member of the design-build team. Capital and personnel relationships are Not disclosed.

CounterpartyNagano Prefectural Enterprise Bureau

Nagano Prefectural Enterprise Bureau, the plant operator. Other information, including its location, representative, capital, year established and business activities, is Not disclosed.

Award/certification name

Letter of appreciation

Awarding / certifying body

Nagano Prefectural Enterprise Bureau

Location (as indicated in this announcement)

An upstream location on the main channel of the Yodagiri River, part of the Tenryu River system, in Iijima Town, Nagano Prefecture

Maximum water intake: 1.8 m³/s; maximum effective head: 106.92 m; maximum output: 1,500 kW; annual electricity generated: approximately 5.5 MWh

In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.

Announced details
ItemDetails
Names of Products / Services CoveredKoshaku no Shizuku Hydroelectric Power Plant (「越百のしずく発電所」)
CounterpartyNagano Prefectural Enterprise Bureau
Counterparty overviewNagano Prefectural Enterprise Bureau, the plant operator. Other information, including its location, representative, capital, year established and business activities, is Not disclosed.
Relationship with the CompanyThe Company was responsible for designing the plant as a member of the design-build team. Capital and personnel relationships are Not disclosed.
Launch dateOctober 2025 (operations commenced; actual)
Applicable areaHydroelectric power generation, effective use of unused resources, local energy production for local consumption
Award/certification nameLetter of appreciation
Awarding / certifying bodyNagano Prefectural Enterprise Bureau
LocationAn upstream location on the main channel of the Yodagiri River, part of the Tenryu River system, in Iijima Town, Nagano Prefecture
Location scaleMaximum water intake: 1.8 m³/s; maximum effective head: 106.92 m; maximum output: 1,500 kW; annual electricity generated: approximately 5.5 MWh
Quantitative EffectsContributes to increased power generation, reduced maintenance and management costs for Iijima Town’s water supply, and local energy production for local consumption (figures are Not disclosed)
Items this document does not state (7)
Contract ValueOffering priceContract DateRegistration number and expiry dateUsage historyImpact on Business PerformanceSource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

To make use of unused resources upstream on the Yodagiri River, contribute to increased power generation downstream, reduce the burden of maintaining and managing Iijima Town’s water supply, and promote local energy production for local consumption through electricity use by companies within the prefecture.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
Our company-designed hydropower facility has been completed, and we received a letter of appreciation from the Nagano Prefectural Enterprise Bureau. | CTI Engineering Co.,Ltd. (9621) timely disclosure | Komori