Risk of an unexpected large-scale power outage
First written in FY2019. 2 of 4 entries say "Mitigated", first in FY2021. Latest entry: FY2026.
The whole theme swung hardest in 2019: 4 of 6 companies on the "Worse" side.
2 other companies' latest entry also says "Mitigated".
- FY2026MitigatedAnnual report
「The facilities used to monitor and control gas pressure and flow, as well as the safety operations centre building used for disaster response, rely on commercial power. During a power outage, however, they switch from commercial power to emergency power and can continue operating.」
As a response to large-scale power outages, specifically describes on-site power-generation facilities, backup between multiple LNG terminals, and the switchover to emergency power at monitoring and control facilities and the safety operations centre building. - FY2022RestatedAnnual report
「Even if one LNG terminal were to stop operating, the Company's other LNG terminals could provide backup, enabling it to produce and supply almost all of the gas required.」
Continues measures to maintain a certain level of supply through backup from on-site power-generation facilities and multiple LNG terminals during a large-scale power outage or terminal shutdown. - FY2021MitigatedAnnual report
「Even if one LNG terminal were to stop operating, the Company's other LNG terminals could provide backup, enabling it to produce and supply almost all of the gas required.」
In response to supply disruptions during a large-scale power outage, specifically describes the potential for backup from on-site power-generation facilities and multiple LNG terminals. - FY2019First statedAnnual report
「Even if one LNG terminal were to stop operating, the Company's other LNG terminals could provide backup, enabling it to produce and supply almost all of the gas required.」
Identifies disruption to gas production and supply during a large-scale power outage as a risk, with backup from multiple LNG terminals, on-site power-generation facilities and BCP as countermeasures.