Tokyo Gas (9531) · RiskMitigated

Risk of an unexpected large-scale power outage

First written in FY2019. 2 of 4 entries say "Mitigated", first in FY2021. Latest entry: FY2026.

4entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2019MitigatedFY2021RestatedFY20222019: 120192020: 020202021: 120212022: 120222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies

The whole theme swung hardest in 2019: 4 of 6 companies on the "Worse" side.

2 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「The facilities used to monitor and control gas pressure and flow, as well as the safety operations centre building used for disaster response, rely on commercial power. During a power outage, however, they switch from commercial power to emergency power and can continue operating.」

    As a response to large-scale power outages, specifically describes on-site power-generation facilities, backup between multiple LNG terminals, and the switchover to emergency power at monitoring and control facilities and the safety operations centre building.
  2. FY2022RestatedAnnual report

    「Even if one LNG terminal were to stop operating, the Company's other LNG terminals could provide backup, enabling it to produce and supply almost all of the gas required.」

    Continues measures to maintain a certain level of supply through backup from on-site power-generation facilities and multiple LNG terminals during a large-scale power outage or terminal shutdown.
  3. FY2021MitigatedAnnual report

    「Even if one LNG terminal were to stop operating, the Company's other LNG terminals could provide backup, enabling it to produce and supply almost all of the gas required.」

    In response to supply disruptions during a large-scale power outage, specifically describes the potential for backup from on-site power-generation facilities and multiple LNG terminals.
  4. FY2019First statedAnnual report

    「Even if one LNG terminal were to stop operating, the Company's other LNG terminals could provide backup, enabling it to produce and supply almost all of the gas required.」

    Identifies disruption to gas production and supply during a large-scale power outage as a risk, with backup from multiple LNG terminals, on-site power-generation facilities and BCP as countermeasures.
Moved together

"New group structure and business selection and focus" moved the same way as this thread, in the same document, in 2 of its 4 moves.

222222★123456
  1. ★This thread
  2. 1New group structure and business selection and focus2×
  3. 2Shareholder distributions targeting a total payout ratio of around 60% through fiscal 20202×
  4. 3Research and Development Centered on the City Gas Business2×
  5. 4Share Price Fluctuation Risk of Listed Shares Held2×
  6. 5Strengthening supply infrastructure through the acquisition of the Koga–Moka trunk pipeline and other main and branch pipelines2×
  7. 6Achieved 2.4 million electricity contracts one year ahead of schedule, by fiscal 20202×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Tokyo Gas's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.