First written in FY2018. 4 of 10 entries say "Materialised", first in FY2020-Q2. Latest entry: 2026-07-29.

10entries
9years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018RestatedFY20212018: 120182019: 120192020: 320202021: 120212022: 020222023: 020232024: 020242025: 020252026: 42026
Same theme, other companies
Risk of Power Plant Shutdowns Due to Natural Disasters, Accidents and Other CausesA theme 2 companies write about · 2 as a headwind · 0 as a tailwind

Renova moved to the "Worse" side of this theme in 2019.

0 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2021RestatedAnnual report

    「The Kukunoe Solar silent partnership business suspended transmission from the morning of 7 July through the afternoon of 12 July 2020 due to a power outage caused by damage to the transmission system of Kyushu Electric Power Transmission and Distribution Co., Inc. In the Otsu Solar silent partnership business, some equipment is being repaired due to damage from the heavy rains.」

    The company reconfirmed the transmission suspension and equipment repairs caused by heavy rain and explained that the impact on consolidated results is minor within the scope of insurance coverage.
  2. FY2021-Q2MaterialisedAnnual report

    「In the group's renewable energy generation business during the cumulative period of the second quarter of the current fiscal year, 2 of the group's large-scale solar power plants were affected by the heavy rains that caused damage in the Kyushu region in July 2020. The Kukunoe Solar silent partnership business suspended transmission from the morning of 7 July through the afternoon of 12 July 2020 due to a power outage caused by damage to the transmission system of Kyushu Electric Power Transmission and Distribution Co., Inc. The Otsu Solar silent partnership business is also repairing some equipment damaged by the heavy rains. In both cases, the impact on consolidated results is minor. In addition, Kukunoe Solar suspended transmission from 15:00 on 7 September through 15:00 on 8 September 2020 after branches were found to have come into contact with its private transmission line due to Typhoon No. 10, which caused damage in Kyushu in September 2020.」

    Kukunoe Solar suspended transmission due to heavy rain in Kyushu, while Otsu Solar incurred repairs to some equipment. In addition, Kukunoe Solar suspended transmission for approximately 24 hours due to Typhoon No. 10. The company considers the impact on consolidated results minor.
  3. FY2021-Q1MaterialisedAnnual report

    「As of the filing date, no significant damage to the assets of the group's operating or under-construction large-scale solar and biomass power plants, or its projects under development, has been confirmed as a result of the heavy rains that caused damage in the Kyushu region in July 2020. The Kukunoe Solar silent partnership business suspended transmission from the morning of 7 July 2020 through the afternoon of 12 July due to a power outage caused by damage to the transmission system of Kyushu Electric Power Transmission and Distribution Co., Inc., but the impact on consolidated results is minor.」

    Kukunoe Solar suspended transmission from the morning of 7 July through the afternoon of 12 July 2020 due to damage to the transmission system caused by heavy rain in Kyushu. There was no significant damage to the power plant's assets, and the impact on consolidated results is considered minor.
  4. FY2020-Q3RestatedAnnual report

    「Due to a problem with the transmission network of Tokyo Electric Power Grid Inc. caused by Typhoon No. 15, which occurred on 5 September 2019, Futtsu Solar Power Plant did not transmit electricity for the 2 days of 9 and 10 September 2019. There was no impact from Typhoon No. 19, which caused damage nationwide from 12 October 2019, on the group's large-scale solar and biomass generation facilities that had commenced operations or were under construction.」

    The company reconfirmed the 2-day suspension of transmission by Futtsu Solar due to Typhoon No. 15 and stated that Typhoon No. 19 had no impact on its generation facilities.
  5. FY2020-Q2MaterialisedAnnual report

    「Due to a problem with the transmission network of Tokyo Electric Power Grid Inc. caused by Typhoon No. 15, which occurred on 5 September 2019, Futtsu Solar Power Plant (Futtsu, Chiba; generation capacity: 40.4 MW. Hereafter, solar generation output is stated on a module-capacity basis) did not transmit electricity for the 2 days of 9 and 10 September 2019.」

    Futtsu Solar Power Plant suspended transmission for 2 days due to a transmission-network problem caused by Typhoon No. 15. The company explained that some of the lost profits are expected to be covered by property insurance.
  6. FY2018First statedAnnual report

    「Large-scale typhoons, earthquakes, volcanic eruptions, tsunamis, floods, landslides, torrential rain, heavy snow and other natural disasters or abnormal weather, as well as man-made disasters such as war, terrorism and armed conflict, and major social infrastructure failures such as disruptions to transmission systems, could require extensive repairs to power plant and other facilities and could prevent the group from continuing its operations or cause significant disruption.」

    The company listed natural disaster, fire and accident risks affecting its head office and power plants nationwide, its supply chain and transmission infrastructure as a separate risk category.
Moved together

"Risk of Share-Value Dilution from the Exercise of Stock Acquisition Rights" moved the same way as this thread, in the same document, in 3 of its 10 moves.

32★12
  1. ★This thread
  2. 1Risk of Share-Value Dilution from the Exercise of Stock Acquisition Rights3×
  3. 2Sponsor Support Agreement for Borrowings by an Affiliated Company2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Renova yet. It last moved in the Occurring Fact of 2026-07-29: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Power Plant Shutdowns Caused by Natural Disasters, Fires, or Accidents | RENOVA,Inc. (9519) | Komori