Development of High-Efficiency Coal-Fired Power Generation in Japan

First written in FY2016. 4 of 12 entries say "Restated". Latest entry: FY2026.

12entries
11years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019AdvancedFY2021-Q1 – FY2021-Q2DroppedFY2022 – 2026-05-272016: 120162017: 120172018: 020182019: 220192020: 320202021: 020212022: 120222023: 020232024: 020242025: 020252026: 42026
Same theme, other companies
Development and Capacity Expansion of High-Efficiency, Low-Environmental-Impact Thermal Power GenerationA theme 6 companies write about · 0 as a headwind · 12 as a tailwind

0 other companies' latest entry also says "Softened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026SoftenedAnnual report

    「In addition to recording impairment losses at Takasago Thermal Power Station and other facilities, during the fiscal year the company decided to discontinue operations at the end of FY2028,」

    The company states that it decided to discontinue operations at Takasago Thermal Power Station at the end of FY2028, moving away from its previous policy of continuing and developing domestic high-efficiency coal-fired power generation.
  2. FY2022DroppedAnnual report

    「During the fiscal year, Yamaguchi-Ube Power Co., Ltd. ceased to be a consolidated subsidiary after its liquidation was completed in February 2022.」

    Yamaguchi-Ube Power, formerly one of the domestic high-efficiency coal-fired power development projects, completed its liquidation in February 2022 and ceased to be a consolidated subsidiary.
  3. FY2021-Q2AdvancedAnnual report

    「On the revenue side for the second quarter of the fiscal year, electricity sales in the electric power business increased following the commencement of commercial operations at Takehara Thermal Power Station New Unit 1 (30 June 2020) and Kashima Thermal Power Station Unit 2 (1 July 2020). However, revenue declined 11.6% from the second quarter of the previous fiscal year to ¥408.5 billion due to lower thermal fuel prices and lower electricity market prices, among other factors.」

    Takehara Thermal Power Station New Unit 1 commenced commercial operations on 30 June 2020, followed by Kashima Thermal Power Station Unit 2 on 1 July 2020, as part of the domestic high-efficiency coal-fired power development program.
  4. FY2021-Q1AdvancedAnnual report

    「Takehara Thermal Power Station New Unit 1 (commercial operations commenced on 30 June 2020)」

    Takehara Thermal Power Station New Unit 1, part of the domestic high-efficiency coal-fired power development program, commenced commercial operations on 30 June 2020.
  5. FY2020-Q3RestatedAnnual report

    「From the second quarter of the fiscal year, Yamaguchi-Ube Power Co., Ltd., formerly an equity-method affiliate, was included in the scope of consolidation after additional shares were acquired in July 2019, making it a subsidiary.」

    The July 2019 conversion of Yamaguchi-Ube Power Co., Ltd. into a subsidiary is reconfirmed as a change involving a major affiliated company.
  6. FY2020-Q2AdvancedAnnual report

    「During the second quarter of the fiscal year, Yamaguchi-Ube Power Co., Ltd., formerly an equity-method affiliate, was included in the scope of consolidation after additional shares were acquired in July 2019, making it a subsidiary.」

    Yamaguchi-Ube Power, one of the domestic high-efficiency coal-fired power projects, became a subsidiary following the acquisition of additional shares in July 2019.
  7. FY2019RestatedAnnual report

    「Takehara New Unit 1 Maximum output 600,000 kW December 2015 June 2020」

    For Takehara New Unit 1, a project under the domestic high-efficiency coal-fired power development program, the equipment plan continues to state a maximum output of 600,000 kW and scheduled commencement of operations in June 2020.
  8. FY2017RestatedAnnual report

    「The Group aims to achieve corporate growth while contributing to Japan's economic growth through the development of high-efficiency coal-fired power generation, which is important from the perspective of maintaining a balanced energy mix.」

    The high-efficiency coal-fired power projects at Takehara, Takasago, Kashima Power and Yamaguchi-Ube Power, together with their capacity and scheduled commencement of operations, continue to be presented.
  9. FY2016First statedAnnual report

    「The Group aims to achieve corporate growth while contributing to Japan's economic growth through the development of high-efficiency coal-fired power generation, which is important from the perspective of maintaining a balanced energy mix.」

    Takehara New Unit 1, Takasago New Units 1 and 2, Kashima Power and Yamaguchi-Ube Power are listed as under construction or planned, together with their capacity and scheduled commencement of operations.
Moved together

"Growth in overseas power generation operations and expansion of overseas equity-method generation capacity" moved the same way as this thread, in the same document, in 3 of its 12 moves.

3222★1234
  1. ★This thread
  2. 1Growth in overseas power generation operations and expansion of overseas equity-method generation capacity3×
  3. 2Ensuring Equipment Reliability and Stable Operations at Power Generation Facilities2×
  4. 3Improving Asset Efficiency and Profitability through Business Selection2×
  5. 4Expansion of the Power Generation Business in the United States2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Electric Power Development's next results are scheduled for 2026-10-30. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-05-27: "Cited as achieved".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Development of High-Efficiency Coal-Fired Power Generation in Japan | Electric Power Development Co.,Ltd. (9513) | Komori