Hokkaido Electric Power Company (9509) · InitiativeAdvanced
Plan to Transfer Multiple Hydroelectric Power Plants
First written in FY2023. 2 of 3 entries say "Advanced", first in FY2024-Q2. Latest entry: FY2025-H1.
3entries
2years
0from disclosures
How it moved
Same theme, other companies
Rationalisation of Generation Assets Through the Transfer of Multiple Hydroelectric Power StationsA theme 1 companies write about · 0 as a headwind · 0 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2025-H1AdvancedAnnual report
「Hydropower Isogai River No. 1 (transfer) (Note) 2,400 May 2024 Hydropower Isogai River No. 2 (transfer) (Note) 1,250 August 2024」
Isogai River No. 1, with a capacity of 2,400 kW, was transferred to 道南水力発電合同会社 in May 2024, and Isogai River No. 2, with a capacity of 1,250 kW, was transferred in August 2024. - FY2024-Q2AdvancedAnnual report
「Hydropower Ainumanai (transferred) (Note) 2,000 May 2023 Hydropower Ono (transferred) (Note) 1,500 July 2023」
Under the plan to transfer multiple hydropower plants, the transfer of Ainumanai and Ono, totaling 3,500 kW, was completed in May and July 2023, marking progress on part of the plan. - FY2023First statedAnnual report
「Hydropower Ainumanai (transferred) (Note) 2,000 May 2023 Hydropower Ono (transferred) (Note) 1,500 July 2023 Hydropower Isogayagawa No. 1 (transferred) (Note) 2,400 May 2024 Hydropower Isogayagawa No. 2 (transferred) (Note) 1,250 August 2024 Hydropower Nanae (transferred) (Note) 10,000 December 2024」
A plan was presented to transfer the Ainumanai, Ono, Isogai River No. 1 and No. 2, and Nanae hydropower plants, totaling 5 plants and 17,150 kW, to the affiliated company 道南水力発電合同会社.