Komori
The Kansai Electric Power Company (9503) · TargetAdvanced

Nuclear Plant Restarts with Safety as the Top Priority and Safe, Stable Operations

First written in FY2017. 11 of 25 entries say "Advanced", first in FY2018-Q1. Latest entry: 2026-10-09.

25entries
10years
7from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2019-Q1 – FY2019-Q3AdvancedFY2022-Q3 – FY2025-H12017: 320172018: 420182019: 120192020: 020202021: 020212022: 120222023: 220232024: 320242025: 020252026: 112026
Same theme, other companies
Promoting Nuclear Power Plant Safety Improvements and Early RestartA theme 3 companies write about · 0 as a headwind · 3 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-10-09AdvancedOccurring Fact

    「原子炉起動に向けた準備が完了したことから、10月10日に原子炉を起動し、同日に調整運転を開始する予定です。 原子炉起動・臨界 :2026年10月10日 調整運転開始 :2026年10月10日 本格運転再開(総合負荷性能検査終了) :2026年11月 4日」

    美浜発電所3号機で水の滴下および配管の貫通穴が確認され、原子炉を手動停止した後、配管取替え等の対策を実施し、原子炉起動・調整運転開始および本格運転再開の予定が具体化した。
  2. FY2026AdvancedAnnual report

    「All 7 nuclear plants continue to operate. The company is also appropriately addressing measures for aging plants while ensuring safety, based on long-term facility management plans approved by the government.」

    The disclosure states that all 7 units continue to operate and that long-term facility management plans for all 7 units have been approved. It also states that the company has begun voluntary site surveys for a successor plant to Mihama Power Station.
  3. FY2025-H1AdvancedAnnual report

    「Nuclear power generation 21,535 26,000 120.7」

    Nuclear power generation was 120.7% of the previous year's level, increasing from the same period of the previous year with 7 units in operation.
  4. FY2024AchievedAnnual report

    「After completing safety-related construction, including facilities for responding to specified severe accidents, the company resumed full-scale operations at Takahama Power Station Unit 1 in August last year and Unit 2 in October of the same year. As a result, all plants at Mihama Power Station, Takahama Power Station, and Oi Power Station are operating, establishing a seven-unit operating structure.」

    The resumption of full-scale operations at Takahama Units 1 and 2 and the completion of safety-related construction established an operating structure comprising 7 units at 3 power stations.
  5. FY2024-Q3AdvancedAnnual report

    「Nuclear power generation 17,052 31,693 185.9」

    Nuclear power generation was 185.9% of the previous year's level, and the disclosure continues to state that the nuclear capacity factor rose and thermal fuel costs declined.
  6. FY2024-Q2AdvancedAnnual report

    「Nuclear power generation 9,285 21,535 231.9」

    Nuclear power generation was 231.9% of the previous year's level, and the disclosure states that the nuclear capacity factor rose and thermal fuel costs declined.
  7. FY2024-Q1AdvancedAnnual report

    「Nuclear power generation 3,968 10,731 270.5」

    Nuclear power generation was 270.5% of the previous year's level, and the disclosure states that the nuclear capacity factor rose and thermal fuel costs declined.
  8. FY2022-Q3AdvancedAnnual report

    「Nuclear power generation 12,926 25,882 200.2」

    Nuclear power generation was 200.2% of the previous year's level, and the disclosure states that generation increased as the nuclear capacity factor rose.
  9. FY2019-Q3RestatedAnnual report

    「On the expense side, operating expenses were ¥2,255,801 million, up ¥190,359 million, or 9.2%, year on year. This reflected higher costs resulting from rising fuel prices and increased electricity sales volume and inter-area and sales to other companies, which outweighed the cost reductions resulting from the resumption of operations at nuclear plants and efforts to thoroughly improve management efficiency.」

    The disclosure continues to cite cost reductions resulting from the resumption of operations at nuclear plants, but does not indicate further progress on nuclear restarts.
  10. FY2019-Q2RestatedAnnual report

    「On the expense side, operating expenses were ¥1,501,955 million, up ¥114,712 million, or 8.3%, year on year. This reflected higher costs resulting from rising fuel prices and increased electricity sales volume and inter-area and sales to other companies, which outweighed the cost reductions resulting from the resumption of operations at nuclear plants and efforts to thoroughly improve management efficiency.」

    The disclosure continues to cite cost reductions resulting from the resumption of operations at nuclear plants, but does not indicate further progress on nuclear restarts.
  11. FY2019-Q1RestatedAnnual report

    「On the expenditure side, operating expenses were ¥696,986 million, an increase of ¥20,792 million, or 3.1%, from the same period of the previous year. This was despite thorough efforts to improve management efficiency and a reduction in costs resulting from the resumption of operations at nuclear plants, as costs increased due to higher fuel prices and higher inter-area and third-party electricity sales volumes.」

    The disclosure continues to cite cost reductions resulting from the resumption of operations at nuclear plants, but does not indicate further progress on nuclear restarts.
  12. FY2018AdvancedAnnual report

    「The company will continue safe, stable operations at Takahama Power Station Units 3 and 4 and reduce electricity rates following the restart of Oi Power Station Units 3 and 4. It will also steadily carry out safety-related construction for operation of nuclear plants beyond 40 years, while advancing decommissioning work safely and efficiently.」

    The company identifies the continuation of safe, stable operations at Takahama Power Station, the restart of Oi Power Station Units 3 and 4, safety-related construction for operations beyond 40 years, and decommissioning work as specific initiatives.
  13. FY2018-Q3RestatedAnnual report

    「On the expenditure side, operating expenses increased despite thorough efforts to improve management efficiency and the cost reductions resulting from the resumption of operations at Takahama Power Station Units 3 and 4, as thermal fuel costs increased due to higher fuel prices and other factors.」

    The disclosure continues to cite cost reductions resulting from the resumption of operations at Takahama Power Station Units 3 and 4, but does not indicate further progress on nuclear restarts.
  14. FY2018-Q2RestatedAnnual report

    「On the expense side, operating expenses were ¥1,387,242 million, up ¥40,277 million, or 3.0%, year on year. This reflected higher fuel costs and raw material costs for the gas and other energy businesses resulting from rising fuel prices, which outweighed the cost reductions from the resumption of operations at Units 3 and 4 of the Takahama Nuclear Power Station and efforts to thoroughly improve management efficiency.」

    The disclosure continues to cite cost reductions resulting from the resumption of operations at Takahama Power Station Units 3 and 4, but does not indicate further progress on nuclear restarts.
  15. FY2018-Q1AdvancedAnnual report

    「On the expense side, operating expenses were ¥676,193 million, up ¥23,545 million, or 3.6%, year on year. This reflected higher thermal fuel costs resulting from rising fuel prices, which outweighed the cost reductions from the resumption of operations at Units 3 and 4 of the Takahama Nuclear Power Station and efforts to thoroughly improve management efficiency.」

    The disclosure states that operations at Takahama Power Station Units 3 and 4 resumed and that this generated fuel cost reductions.
  16. FY2017First statedAnnual report

    「③ Nuclear restarts and safe, stable operations with safety as the top priority ・The company will keep firmly in mind that primary responsibility for nuclear safety rests with the operator. By making unremitting efforts to improve the safety and reliability of nuclear plants and continuing safe, stable operations, the group will use its full strength to restore confidence in nuclear safety and promote understanding of the need for nuclear power as a baseload source and for the nuclear fuel cycle.」

    Nuclear restarts and safe, stable operations are identified as priority initiatives to be advanced by improving the safety and reliability of nuclear plants.
Moved together

"Increase in Fuel Costs for Substitute Thermal Power Generation Due to Prolonged Nuclear Power Plant Outages" moved the same way as this thread, in the same document, in 8 of its 25 moves.

887766★123456
  1. ★This thread
  2. 1Increase in Fuel Costs for Substitute Thermal Power Generation Due to Prolonged Nuclear Power Plant Outages8×
  3. 2¥25 Per-Share Dividend Following Two Consecutive Profitable Periods and Improved Financial Position8×
  4. 3Expansion of Information and Communications Services Leveraging Fiber-Optic Infrastructure7×
  5. 4Development of Energy-Efficient Real Estate and Lifestyle-Related Services7×
  6. 5Restoring Trust through Root-Cause Analysis and Recurrence Prevention6×
  7. 6Interest Rate Risk Associated with Interest-Bearing Debt6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
The Kansai Electric Power Company's next results are scheduled for 2026-10-29. Read the earnings preview It last moved in the Occurring Fact of 2026-10-09: "Advanced".
Nuclear Plant Restarts with Safety as the Top Priority and Safe, Stable Operations | The Kansai Electric Power Company,Incorporated (9503) | Komori