Komori
Occurring Fact9503The Kansai Electric Power Company,IncorporatedElectricity and gas

Manual Shutdown of Reactor Unit 3 at the Mihama Nuclear Power Station

The reactor at Mihama Power Station Unit 3 was manually shut down after a steam leak was detected around the high-pressure turbine. The steam leak has stopped, and an investigation into the cause will be conducted.

Worth reading
33Immaterial
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Deterioration
Direction inferred from the company’s description.
Scale
—
Displayed only when the document provides numerical figures.
Wording
Avoiding a definitive answer
How definitive the wording is.

Manual Shutdown of the Reactor at Mihama Power Station Unit 3

Subject Entity

The Kansai Electric Power Company,Incorporated (Mihama Power Station Unit 3)

Target Locations / Products

Around the high-pressure turbine at Mihama Power Station Unit 3 (secondary system)

Occurrence8 May 2026 (alarm activated at 04:08, steam leak confirmed at around 04:10, and reactor manually shut down at 04:24)
Same day
Awareness or receipt of notice8 May 2026 (alarm activated at 04:08 and steam leak confirmed at around 04:10)
This disclosure05/08/2026
Impact on Earnings Forecast

If any matters requiring disclosure, including any impact on business performance, are identified, we will promptly announce them.

Company response

Suspended operations

Reactor operation at Mihama Power Station Unit 3 (manual shutdown of the reactor)

Outlook

An investigation into the cause will be conducted. If any matters requiring disclosure, including any impact on business performance, are identified, we will promptly announce them.

Event that occurred
ItemDetails
Event nameManual Shutdown of the Reactor at Mihama Power Station Unit 3
Date of occurrence8 May 2026 (alarm activated at 04:08, steam leak confirmed at around 04:10, and reactor manually shut down at 04:24)
Date recognized / date notice received8 May 2026 (alarm activated at 04:08 and steam leak confirmed at around 04:10)
Subject EntityThe Kansai Electric Power Company,Incorporated (Mihama Power Station Unit 3)
Target Locations / ProductsAround the high-pressure turbine at Mihama Power Station Unit 3 (secondary system)
Impact on Earnings ForecastIf any matters requiring disclosure, including any impact on business performance, are identified, we will promptly announce them.
Suspended operationsReactor operation at Mihama Power Station Unit 3 (manual shutdown of the reactor)
OutlookAn investigation into the cause will be conducted. If any matters requiring disclosure, including any impact on business performance, are identified, we will promptly announce them.
Planned follow-up disclosureIf any matters requiring disclosure, including any impact on business performance, are identified, we will promptly announce them.
Items this document does not state (16)
CauseAmount of Impact on Business PerformanceAccounting period in which recognizedType of litigation or proceedingCourt or authorityPlaintiffDefendantDate of filing / date of actionClaim amount / surcharge amountAmount of receivables at risk of non-collection or delayed collectionScheduled resumption dateInvestigation structureMeasures to prevent recurrenceDirectors' and officers' liabilityVoting rights ownership percentage before the changeVoting rights ownership percentage after the change

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

A steam leak from around the high-pressure turbine was confirmed using surveillance cameras. The root cause of the leak has not yet been identified.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.