Komori
Chubu Electric Power Company (9502) · RiskWorsened

Winter supply-demand tightness caused by large-scale solar deployment and the suspension or retirement of thermal power plants

First written in FY2023-Q2. 2 of 3 entries say "Worsened", first in FY2024-Q3. Latest entry: FY2025.

3entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023-Q2WorsenedFY2024-Q3 – FY20252022: 120222023: 020232024: 120242025: 12025
Same theme, other companies

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2025WorsenedAnnual report

    「In addition, as large amounts of variable renewable generation with unstable output are deployed, there are concerns that supply-demand conditions in Japan could deteriorate if unexpected increases in demand caused by abnormal weather coincide with lower solar generation and other factors caused by bad weather, and if equipment problems occur or an unforeseen event arises in a resource-producing country.」

    Regarding the risk of supply-demand tightness in winter and other periods, the company presents a scenario in which domestic supply-demand conditions deteriorate due to the combination of large-scale deployment of variable renewable generation, increased demand caused by abnormal weather, lower generation caused by bad weather, equipment problems, and unforeseen events in resource-producing countries.
  2. FY2024-Q3WorsenedAnnual report

    「In addition, as large amounts of variable renewable generation, including solar power, are being deployed, supply-demand tightness is becoming more likely in winter, when increased demand coincides with lower solar generation and other factors. There are concerns that supply-demand conditions in Japan could deteriorate if equipment problems occur or an unforeseen event arises in a resource-producing country.」

    Regarding the risk of winter supply-demand tightness, the company explicitly identifies the potential for domestic supply-demand conditions to deteriorate due to equipment problems or unforeseen events in resource-producing countries, in addition to the large-scale deployment of variable renewable generation.
  3. FY2023-Q2First statedAnnual report

    「In particular, while large-scale solar power deployment is advancing, the suspension or retirement of existing thermal power plants and other factors are making it more likely that supply and demand will become tight in winter, when demand increases as solar power generation declines.」

    Against a backdrop of large-scale solar deployment and the suspension or retirement of existing thermal power plants, the company identifies winter supply-demand tightness, when increased demand coincides with lower solar generation, as a new risk. It also lists measures including soliciting bids for additional power sources, confirming available supply capacity based on fuel inventories, and improving the accuracy of renewable power output forecasts.
Moved together

"Fluctuations in electricity sales volumes and generation costs caused by economic conditions, temperature and precipitation" moved the same way as this thread, in the same document, in 2 of its 3 moves.

2★1
  1. ★This thread
  2. 1Fluctuations in electricity sales volumes and generation costs caused by economic conditions, temperature and precipitation2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Chubu Electric Power Company's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Winter supply-demand tightness caused by large-scale solar deployment and the suspension or retirement of thermal power plants | Chubu Electric Power Company,Incorporated (9502) | Komori