Chubu Electric Power Company (9502) · RiskMitigated

Risks to supply facilities from natural disasters, accidents, terrorism and fuel procurement disruptions

First written in FY2016. 4 of 11 entries say "Restated". Latest entry: FY2026.

11entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2018MaterialisedFY2019RestatedFY2022-Q22016: 120162017: 220172018: 120182019: 120192020: 020202021: 220212022: 020222023: 020232024: 120242025: 120252026: 22026
Same theme, other companies

The whole theme swung hardest in 2019: 4 of 6 companies on the "Worse" side.

3 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「Following a reassessment based on the new damage assumptions published by the government using more accurate topographical data and other information, the Group confirmed that no additional advance facility measures were necessary. It will continue to monitor developments at the national and local government levels and review the Group's BCP (business continuity plan) and other plans based on the latest knowledge.」

    The Group reassessed the situation based on the new damage assumptions for a major Nankai Trough earthquake and confirmed that no additional advance facility measures were necessary. The BCP review will continue.
  2. 2026-04-28WorsenedResults presentation

    「The impact on JERA’s LNG procurement is currently limited. However, if tensions in the Middle East intensify or persist, restrictions on the navigation of fuel vessels could affect supply and demand in energy markets and resource prices, and we are closely monitoring developments.」

    The company identified the possibility of restrictions on fuel-vessel navigation and impacts on energy markets arising from a worsening or prolonged situation in the Middle East as supply risks related to LNG procurement.
  3. FY2025RestatedAnnual report

    「The Group's business activities face risks from large-scale natural disasters such as Nankai Trough earthquakes, major typhoons and abnormal weather, as well as armed attacks, terrorist acts, epidemics and accidents.」

    In addition to natural disasters, risks to supply facilities and business continuity, including armed attacks, epidemics and accidents, are listed, and a policy for reviewing the BCP in light of the government's revised damage assumptions for the Nankai Trough is presented.
  4. FY2025-H1MaterialisedAnnual report

    「Following the earthquake that occurred on 8 August 2024 with its epicenter in the Hyuga-nada Sea, the Nankai Trough Earthquake Extra Information was issued for the first time. We immediately activated our earthquake standby system and established communication channels with external parties, including local governments. At the Hamaoka Nuclear Power Station, as part of the initial response, approximately 300 personnel, including standby personnel, conducted patrols and inspections of facilities. Subsequently, a standby system of approximately 30 personnel was maintained in preparation for an earthquake.」

    The Hyuga-nada earthquake and the issuance of Nankai Trough Earthquake Extra Information actually occurred, resulting in the activation of the earthquake standby system, communication with local governments, an initial response involving approximately 300 personnel at Hamaoka, and a standby system of approximately 30 personnel.
  5. FY2022-Q2RestatedAnnual report

    「Based on recent natural disasters, we are working to strengthen information sharing with society and customers and our facility restoration framework, and will continue to implement disaster response measures as the Chubu Electric Power Group as a whole.」

    As part of the response to natural disasters, information sharing with society and customers, strengthening of the facility restoration framework, and Group-wide disaster response continue.
  6. FY2021MitigatedAnnual report

    「Based on lessons learned from typhoon disasters and other events, the Group is working under its Action Plan to strengthen its facility restoration framework by developing various restoration support systems, expand the functions of its information dissemination app, strengthen communications with customers through website improvements, and enhance cooperation with local governments and other electric power companies. In addition, to strengthen resilience, the Group will work with local governments and others on measures including further accelerating the advance cutting of trees for preventive maintenance, removing utility poles, and cooperating in flood control when flooding is expected at dams used for hydroelectric power generation.」

    Based on lessons learned from typhoon disasters, measures have been made specific, including restoration support systems, information dissemination, cooperation with local governments and other electric power companies, advance cutting of trees, removal of utility poles and flood-control cooperation.
  7. FY2019MaterialisedAnnual report

    「Revenue from the provision of power network services increased by ¥1.7 billion from the previous fiscal year to ¥746.4 billion, due to factors including an increase in subsidies under the Renewable Energy Special Measures Act, despite a decrease in electricity demand in the Chubu area. Meanwhile, operating expenses increased by ¥3.9 billion to ¥693.3 billion, as costs were incurred to restore facilities damaged by Typhoons No. 21 and 24, including an increase in purchase costs under the Renewable Energy Special Measures Act, despite efforts to improve the efficiency of base costs.」

    Restoration costs were incurred for facilities damaged by Typhoons No. 21 and 24, so the supply facility risk from natural disasters materialized.
  8. FY2018Cyberterrorism countermeasures explicitly statedAnnual report

    「To deliver high-quality electricity economically and reliably, the Group works to develop and maintain optimal facilities and has also implemented measures against large-scale earthquakes and cyberterrorism as part of its response to threats such as disasters.」

    In addition to conventional measures against natural disasters and accidents, countermeasures against cyberterrorism have been explicitly stated as part of the response to threats to supply facilities.
  9. FY2017RestatedAnnual report

    「However, business performance may be affected depending on the operating status of our supply facilities and those of other companies from which we receive electricity, due to large-scale natural disasters, accidents or terrorist acts, disruptions to fuel procurement, and responses to new regulatory standards.」

    Supply facility risks associated with natural disasters, accidents and terrorism, disruptions to fuel procurement, and responses to new regulatory standards continue to be described.
  10. FY2017-Q3RestatedAnnual report

    「However, business performance may be affected depending on the operating status of our supply facilities and those of other companies from which we receive electricity, due to large-scale natural disasters, accidents or terrorist acts, disruptions to fuel procurement, and responses to new regulatory standards.」

    Supply facility risks from natural disasters, accidents and terrorism, disruptions to fuel procurement, and responses to new regulatory standards continue to be described.
  11. FY2016First statedAnnual report

    「However, business performance may be affected depending on the operating status of our supply facilities and those of other companies from which we receive electricity, due to large-scale natural disasters, accidents or terrorist acts, disruptions to fuel procurement, and responses to new regulatory standards.」

    External and internal factors that could affect the operating status of supply facilities are listed.
Moved together

"Guarantee exposure relating to JERA and overseas power-generation businesses" moved the same way as this thread, in the same document, in 4 of its 11 moves.

443322★123456
  1. ★This thread
  2. 1Guarantee exposure relating to JERA and overseas power-generation businesses4×
  3. 2Interest-bearing debt and fluctuations in market interest rates4×
  4. 3Fluctuations in electricity sales volumes and generation costs caused by economic conditions, temperature and precipitation3×
  5. 4Fluctuations in fuel costs and procurement disruptions caused by fuel prices, foreign exchange rates and supplier conditions3×
  6. 5Improving safety at the Hamaoka Nuclear Power Station and achieving compliance with regulatory standards2×
  7. 6Power supply and network upgrades for Nishinagoya Series 7 and Taketoyo Unit 5, among others2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Chubu Electric Power Company's next results are scheduled for 2026-10-29. Read the earnings preview It last moved in the Results presentation of 2026-04-28: "Worsened".