Komori
Chubu Electric Power Company (9502) · InitiativeRestated

An autonomous business structure based on the company system

First written in FY2016. 8 of 10 entries say "Restated". Latest entry: FY2025.

10entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019RestatedFY2022-Q2 – FY20252016: 220162017: 220172018: 120182019: 120192020: 020202021: 220212022: 120222023: 020232024: 020242025: 12025
Same theme, other companies
Spin-off-based management and balancing company autonomy with company-wide controlA theme 4 companies write about · 0 as a headwind · 4 as a tailwind

1 other company's latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「From April 2020, the Company spun off its transmission and distribution division into Chubu Electric Power Grid Co., Ltd. and its sales division into Chubu Electric Power Miraiz Co., Ltd., establishing a structure centered on 3 operating companies, including JERA Co., Ltd.」

    Continues to use as a premise for business operations the structure centered on the 3 operating companies, Power Grid, Miraiz and JERA, following the company separations.
  2. FY2022-Q3RestatedAnnual report

    「From April 2020, the Company spun off its transmission and distribution division into Chubu Electric Power Grid and its sales division into Chubu Electric Power Miraiz, establishing a structure centered on 3 operating companies, including JERA.」

    Continues to use as a premise for business operations the structure centered on 3 operating companies formed through the separation of the transmission and distribution and sales businesses, together with JERA.
  3. FY2022-Q2RestatedAnnual report

    「From April 2020, the Company spun off its transmission and distribution division into Chubu Electric Power Grid and its sales division into Chubu Electric Power Miraiz, establishing a structure centered on 3 operating companies, including JERA.」

    Continues to use as a premise for business operations the structure centered on 3 operating companies formed through the separation of the transmission and distribution and sales businesses, together with JERA.
  4. FY2021ReframedAnnual report

    「From April 2020, the Company spun off its transmission and distribution division into Chubu Electric Power Grid and its sales division into Chubu Electric Power Miraiz, establishing a structure centered on 3 operating companies, including JERA.」

    The operating framework has been made more concrete, shifting from the previous explanation of the 3-company system to a structure centered on 3 operating companies formed through the separation of the transmission and distribution and sales businesses, together with JERA.
  5. FY2019RestatedAnnual report

    「Amid major changes in the business environment, we introduced a company-based system in April 2016 and established 3 companies, “Power Generation,” “Electricity Network,” and “Sales,” to build an autonomous business structure capable of responding quickly and flexibly in the power generation, transmission and distribution, and retail business fields.」

    Continues to position the 3-company system as a structure for responding autonomously to changes in the business environment.
  6. FY2018RestatedAnnual report

    「Amid major changes in the business environment, we introduced a company-based system in April 2016 and established 3 companies, “Power Generation,” “Electricity Network,” and “Sales,” to build an autonomous business structure capable of responding quickly and flexibly in the power generation, transmission and distribution, and retail business fields.」

    Continues to position the 3-company system as the foundation of an autonomous business structure.
  7. FY2017RestatedAnnual report

    「Amid major changes in the business environment, we introduced a company-based system in April 2016 and established 3 companies, “Power Generation,” “Electricity Network,” and “Sales,” to build an autonomous business structure capable of responding quickly and flexibly in the power generation, transmission and distribution, and retail business fields.」

    Reaffirms the 3-company system introduced in April 2016 as the foundation of an autonomous business structure.
  8. FY2017-Q3RestatedAnnual report

    「Amid major changes in the business environment, we introduced a company-based system in April 2016 and established 3 companies, “Power Generation,” “Electricity Network,” and “Sales,” to build an autonomous business structure capable of responding quickly and flexibly in the power generation, transmission and distribution, and retail business fields.」

    Reaffirms the 3-company system introduced in April 2016 as the foundation of an autonomous business structure.
  9. FY2017-Q2RestatedAnnual report

    「Amid major changes in the business environment, we introduced a company-based system in April 2016 and established 3 companies, “Power Generation,” “Electricity Network,” and “Sales,” to build an autonomous business structure capable of responding quickly and flexibly in the power generation, transmission and distribution, and retail business fields.」

    Reaffirms the 3-company system introduced in April 2016 as the foundation of an autonomous business structure.
  10. FY2016First statedAnnual report

    「Amid major changes in the business environment, we introduced a company system in April of this year and established three companies—Generation, Power Network and Retail—to create an autonomous business structure capable of responding quickly and flexibly in the generation, transmission and distribution, and retail fields.」

    The disclosure describes the introduction of the company system in April 2016 and the establishment of 3 companies.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Chubu Electric Power Company's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.