Komori
Shobunsha Holdings (9475) · RiskMitigatedLatest Management Planning (2026-06-19): "Advanced"

Production and logistics stoppages caused by natural disasters in the Greater Tokyo area and at subcontractors

First written in FY2017. 1 of 5 entries say "Reframed", first in FY2019. Latest entry: 2026-06-19.

5entries
10years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017ReframedFY2019MitigatedFY20212017: 120172018: 020182019: 120192020: 020202021: 120212022: 020222023: 020232024: 020242025: 020252026: 22026
Same theme, other companies

The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 187 companies compared. The sentences above are computed from all 187.Comparing 200 of the theme's 501 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2021MitigatedAnnual report

    「The buildings, equipment and products owned by the Company are each insured against unforeseen events. In addition, as described in (1), the Company has established backup arrangements, including storing the databases that underpin the Company Group's operations at multiple locations.」

    For natural disaster risks affecting bases and product centers in the Tokyo metropolitan area and subcontractors, the Company explicitly disclosed insurance coverage for buildings, equipment and products, as well as storage of databases at multiple locations.
  2. FY2019ReframedAnnual report

    「Because the core publishing business outsources work ranging from editing to bookbinding, even if the facilities of the Company Group avoid damage, the same risks described above may arise depending on the extent of damage suffered by subcontractors.」

    Subcontractors entrusted with editing and bookbinding were explicitly added to the scope of natural disaster risks, alongside the Company's bases and product centers in the Tokyo metropolitan area.
  3. FY2017First statedAnnual report

    「Our group's principal business locations are concentrated in the Tokyo metropolitan area. If a major disaster such as an earthquake or typhoon occurs in the area, production may be halted due to damage to facilities and shipments may be delayed due to disruption of the logistics system. In addition, if a disaster strikes a distribution center where products are stored and the products are destroyed, shipments may be temporarily impossible, which could have a material impact on the performance of our group.」

    Identifies the possibility that concentration of bases in the Tokyo metropolitan area, damage to the product center, or damage to subcontractors could result in production stoppages, shipment delays, or product loss due to fire.
Moved together

"Bad-debt risk arising from counterparty fraud or business deterioration" moved the same way as this thread, in the same document, in 2 of its 5 moves.

22★12
  1. ★This thread
  2. 1Bad-debt risk arising from counterparty fraud or business deterioration2×
  3. 2Business Practice and Legal System Risks Associated with Partnerships with Overseas Companies2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Shobunsha Holdings's next results are scheduled for 2026-11-06. Read the earnings preview It last moved in the Management Planning of 2026-06-19: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Production and logistics stoppages caused by natural disasters in the Greater Tokyo area and at subcontractors | Shobunsha Holdings,Inc. (9475) | Komori