Revised forecast
Fiscal year ending September 2026 · Full yearPrevious forecast published 13 November 2025The bar length represents the relative magnitude of change, based on the item that changed the most in this document. The percentage change shown by the dotted line is calculated from the two reported figures because the company did not provide the rate.
The solar power plant in Sano, Tochigi Prefecture, incurred an impairment loss of ¥234 million because heavy rain during construction significantly delayed the work and caused its FIT accreditation to lapse. In the mobile telecommunications equipment sales-related business, an impairment loss of ¥19 million was recognized because some stores have become unprofitable as they have been unable to cover the personnel and property-related costs associated with events. Including the ¥193 million impairment loss recognized in the interim period, extraordinary losses totaled ¥447 million on a consolidated basis and ¥428 million on an individual basis.
Consolidated: ¥234 million in impairment losses on the solar power plant in Sano, Tochigi Prefecture; ¥19 million in impairment losses on fixed assets in the mobile telecommunications equipment sales-related business; and ¥193 million in impairment losses on fixed assets associated with replacing panels at the solar power plant, recognized in the interim period, for a total of ¥447 million. Individual: ¥234 million and ¥193 million, for a total of ¥428 million.
| Item | Details |
|---|---|
| Net Sales | 17,083 Millions of yen → 18,287 Millions of yen(7.0%) |
| Operating profit | 1,537 Millions of yen → 1,454 Millions of yen(△5.4%) |
| Ordinary income | 1,417 Millions of yen → 1,322 Millions of yen(△6.7%) |
| Profit attributable to owners of the parent | 918 Millions of yen → 640 Millions of yen(△30.3%) |
| Net income per share | ¥122.27 → ¥84.96 |
| Fiscal Period Covered | Fiscal year ending September 2026 |
| Period Covered | Full year |
| Publication date of previous forecast | 13 November 2025 |
| Previous-period results | Consolidated (fiscal year ended September 2025): net sales of ¥17,017 million, operating income of ¥1,465 million, ordinary income of ¥1,332 million, net income attributable to owners of the parent of ¥987 million, and basic earnings per share of ¥106.27. Individual: net sales of ¥2,700 million, operating income of ¥1,023 million, ordinary income of ¥879 million, net income of ¥763 million, and basic earnings per share of ¥82.20. |
| Reason for the revision | The solar power plant in Sano, Tochigi Prefecture, incurred an impairment loss of ¥234 million because heavy rain during construction significantly delayed the work and caused its FIT accreditation to lapse. In the mobile telecommunications equipment sales-related business, an impairment loss of ¥19 million was recognized because some stores have become unprofitable as they have been unable to cover the personnel and property-related costs associated with events. Including the ¥193 million impairment loss recognized in the interim period, extraordinary losses totaled ¥447 million on a consolidated basis and ¥428 million on an individual basis. |
| Details and amount of extraordinary loss | Consolidated: ¥234 million in impairment losses on the solar power plant in Sano, Tochigi Prefecture; ¥19 million in impairment losses on fixed assets in the mobile telecommunications equipment sales-related business; and ¥193 million in impairment losses on fixed assets associated with replacing panels at the solar power plant, recognized in the interim period, for a total of ¥447 million. Individual: ¥234 million and ¥193 million, for a total of ¥428 million. |
| Consolidated / non-consolidated | Consolidated/non-consolidated |
Items this document does not state (1)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.In the renewable energy business, the company reviewed its future earnings outlook for a solar power plant in Sano, Tochigi Prefecture, because heavy rain during construction significantly delayed the work and caused its feed-in tariff (FIT) accreditation to lapse, resulting in the recognition of an impairment loss of ¥234 million. In the mobile telecommunications equipment sales-related business, an impairment loss of ¥19 million was recognized because some stores have become unprofitable as they have been unable to cover the personnel and property-related costs associated with events. Including the ¥193 million impairment loss recognized in the interim period, extraordinary losses totaled ¥447 million on a consolidated basis and ¥428 million on an individual basis.