APEX 1.0 Lander Upsizing and Increased Payload Capacity

First written in FY2024. 4 of 10 entries say "Reframed", first in 2026-03-27. Latest entry: FY2026.

10entries
3years
5from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024AdvancedFY2025-H1SoftenedFY2025AdvancedFY2026-H1Reframed2026-03-27 – FY20262024: 220242025: 220252026: 62026
Same theme, other companies
Enlarging the APEX and ULTRA landers and expanding payload capacityA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026ReframedAnnual report

    「The ULTRA lander, to be used from Mission 3 onward, expands on this design and is currently designed to carry a payload of up to 200 kg. Development has already begun. The ULTRA lander is a model that integrates the APEX 1.0 lander originally developed in the United States with the Series 3 lander (provisional name) developed in Japan, combining the high quality required by customers with development efficiency.」

    The plan was changed from independently scaling up the existing APEX 1.0 lander to developing the ULTRA lander, which integrates APEX 1.0 and Series 3. The design was also described as capable of carrying a maximum payload of 200 kg.
  2. FY2026-H1AdvancedAnnual report

    「For Mission 3, testing of each APEX 1.0 lander subsystem is progressing as scheduled toward a 2027 launch.」

    It stated that testing of each APEX 1.0 lander subsystem for Mission 3, which was postponed from 2026 to 2027, is progressing as scheduled.
  3. FY2025SoftenedAnnual report

    「Mission 3 had been scheduled for launch in 2026, but it became clear that supplying the installed engine within the planned procurement schedule would be difficult. The company therefore changed the specifications by significantly simplifying the structure to further increase the likelihood of mission success, and changed the launch date to 2027.」

    The planned launch of Mission 3 using the APEX 1.0 lander was pushed back by approximately one year, changing from 2026 to 2027.
  4. FY2025-H1AdvancedAnnual report

    「The company’s U.S. subsidiary is making steady progress in developing the APEX 1.0 lander, targeting a 2026 launch for Mission 3.」

    The company stated that development of the APEX 1.0 lander for Mission 3 was progressing steadily, with a launch targeted for 2026.
  5. FY2024First statedAnnual report

    「The APEX 1.0 lander has been redesigned from the RESILIENCE lander. The company plans to increase its size so that Mission 3 can transport payloads of up to 300 kg, and aims to develop the lander to transport payloads of up to 500 kg from Mission 4 onward.」

    The development plan for the APEX 1.0 lander, targeting payload capacity of up to 300 kg for Mission 3 and up to 500 kg for Mission 4 and subsequent missions, was described for the first time.
Moved together

"Development delays due to long lead times, specification changes, and defects" moved the same way as this thread, in the same document, in 7 of its 10 moves.

764422★123456
  1. ★This thread
  2. 1Development delays due to long lead times, specification changes, and defects7×
  3. 2Two R&D missions and development for the third mission6×
  4. 3Development of the Series III lander using an SBIR grant4×
  5. 4Awarded Mission 3 under NASA’s CLPS program4×
  6. 5Securing Medium- to Long-Term Growth Capital2×
  7. 6Acquisition of New Customers for Payload Services2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for ispace yet. It last moved in the Revision of earnings forecasts of 2026-05-15: "Softened".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
APEX 1.0 Lander Upsizing and Increased Payload Capacity | ispace,inc. (9348) | Komori