Komori
Other Disclosures9273KOA SHOJI HOLDINGS CO.,LTD.Trading & Wholesale

Notice Regarding the Completion of Construction of コーアイセイ's Zao No. 2 Plant

The consolidated subsidiary コーアイセイ has completed the Zao No. 2 Plant on the premises of its Zao Plant in Yamagata Prefecture. Once operations begin in July 2027, combined production capacity for prefilled syringe formulations at the two plants will be approximately 17 million syringes per year.

Worth reading
59In focus
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
6800
¥ million
Wording
Conditional
How definitive the wording is.

Announced details

Injectable formulations with high pharmacological activityPrefilled syringe products
Applicable field (uses covered by this announcement)

Injectable formulations and generic drugs for medical institutions

Launch dateJuly 2027 (scheduled start of operations)
What the company reported numerically
Quantitative Effects

Combined production capacity for prefilled syringe formulations at the Zao No. 1 Plant and the Zao No. 2 Plant will be approximately 17 million syringes per year

Relationship between the counterparty and the company
KOA SHOJI HOLDINGS CO.,LTD.9273
Relationship with the Company

コーアイセイ株式会社 is our consolidated subsidiary

Location (as indicated in this announcement)

1-7, Zao Matsugaoka 2-chome, Yamagata, Yamagata Prefecture (on the premises of the Zao Plant)

Building area: 2,793.10 m²; total floor area: 3,419.27 m²; two-story steel-frame structure with ALC panels; production capacity: 12 million syringes per year; liquid preparation capacity: 120 L maximum; water systems: 5 t (WFI) and 4 t (UF)
Impact on Business Performance

There will be no impact on results for the fiscal year ending June 2026. The impact on results from the following fiscal year onward will be disclosed appropriately.

The company does not address Contract Value / Offering price.

Announced details
ItemDetails
Names of Products / Services CoveredInjectable formulations with high pharmacological activity, Prefilled syringe products
Relationship with the Companyコーアイセイ株式会社 is our consolidated subsidiary
Launch dateJuly 2027 (scheduled start of operations)
Applicable areaInjectable formulations and generic drugs for medical institutions
Location1-7, Zao Matsugaoka 2-chome, Yamagata, Yamagata Prefecture (on the premises of the Zao Plant)
Location scaleBuilding area: 2,793.10 m²; total floor area: 3,419.27 m²; two-story steel-frame structure with ALC panels; production capacity: 12 million syringes per year; liquid preparation capacity: 120 L maximum; water systems: 5 t (WFI) and 4 t (UF)
Quantitative EffectsCombined production capacity for prefilled syringe formulations at the Zao No. 1 Plant and the Zao No. 2 Plant will be approximately 17 million syringes per year
Impact on Business PerformanceThere will be no impact on results for the fiscal year ending June 2026. The impact on results from the following fiscal year onward will be disclosed appropriately.
Items this document does not state (10)
CounterpartyCounterparty overviewContract ValueOffering priceContract DateAward/certification nameAwarding / certifying bodyRegistration number and expiry dateUsage historySource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

To ensure a stable supply of core products for which demand from medical institutions is high, the company will bring forward the plant's start of operations and establish a framework for further production increases.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
Notice Regarding the Completion of Construction of コーアイセイ's Zao No. 2 Plant | KOA SHOJI HOLDINGS CO.,LTD. (9273) timely disclosure | Komori