Impact of Changes in Estimated Total Costs on Construction Revenue
First written in FY2022. 1 of 2 entries say "Restated". Latest entry: FY2023.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Uncertainty in Cost and Progress Estimates for Construction Revenue RecognitionA theme 94 companies write about · 93 as a headwind · 1 as a tailwind
The whole theme swung hardest in 2024: 9 of 64 companies on the "Worse" side.
39 other companies' latest entry also says "Restated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 94 companies compared. The sentences above are computed from all 94.Full recordFilings, disclosures and news, newest first
- FY2023RestatedAnnual report
「However, if the scope of work changes after construction starts, or equipment and material prices or subcontracting prices fluctuate, this may affect the performance of the Group.」
The risk of fluctuations in the scope of work, material prices, and subcontracting prices continues in relation to revenue recognition for construction and contract manufacturing projects based on estimated total costs. - FY2022First statedAnnual report
「However, if the scope of work changes after construction starts, or equipment and material prices or subcontracting prices fluctuate, this may affect the performance of the Group.」
For construction and contract manufacturing projects for which revenue is recognized over a specified period based on estimated total costs, risks that fluctuations in the scope of work, equipment and material prices, and subcontracting prices may affect results are disclosed separately for the first time.