Cost Overruns in Large-Scale Development Projects

First written in FY2025-H1. 2 of 3 entries say "Materialised", first in FY2025-H1. Latest entry: FY2026.

3entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2025-H1 – FY20252025: 220252026: 12026
Same theme, other companies
Risk of Becoming Unprofitable Due to Excess Project Effort and Delivery DelaysA theme 92 companies write about · 91 as a headwind · 3 as a tailwind

The whole theme swung hardest in 2024: 17 of 54 companies on the "Worse" side.

1 other company's latest entry also says "Dropped".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 92 companies compared. The sentences above are computed from all 92.
Full recordFilings, disclosures and news, newest first
  1. FY2026DroppedAnnual report
    The cost overruns on the large-scale development project described in the previous filing are no longer directly mentioned in the operating results and risk disclosures of this filing.
  2. FY2025MaterialisedAnnual report

    「Because of cost overruns on a large-scale development project, the increase in work hours allocated to that project and the resulting reduction in hours allocated to other projects, among other factors, led to a slight year-on-year increase in revenue. The direct and indirect effects of the project with cost overruns also substantially reduced operating income and ordinary income.」

    The Company states that cost overruns on a large-scale development project also occurred for the full year, affecting the allocation of work hours to other projects as well as operating income and ordinary income.
  3. FY2025-H1MaterialisedAnnual report

    「Following cost overruns on a large-scale development project, the Company recorded an operating loss of ¥37.618 million, compared with operating income of ¥127.295 million in the same period of the previous year; an ordinary loss of ¥38.284 million, compared with ordinary income of ¥127.018 million; and an interim net loss attributable to owners of the parent of ¥32.003 million, compared with net income of ¥81.939 million.」

    The Company states that actual cost overruns on a large-scale development project led to an operating loss, ordinary loss and interim net loss attributable to owners of the parent for the interim consolidated accounting period.
Moved together

"Sales Growth and Growth in Profit at Each Stage" moved the same way as this thread, in the same document, in 2 of its 3 moves.

2★1
  1. ★This thread
  2. 1Sales Growth and Growth in Profit at Each Stage2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
GiXo's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Cost Overruns in Large-Scale Development Projects | GiXo Ltd. (9219) | Komori