Construction of the Amata Nakorn Logistics Center

First written in FY2019-Q3. 2 of 4 entries say "Softened", first in FY2019. Latest entry: FY2021.

4entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2019-Q3SoftenedFY2019 – FY20202019: 220192020: 120202021: 12021
Same theme, other companies
Construction and operation of the Amata Nakorn Logistics CenterA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2021AchievedAnnual report

    「The principal asset completed during the current period was the following logistics center, newly constructed adjacent to Amata City Chonburi Industrial Estate, Thailand's largest industrial estate and a location where many Japanese companies have established operations. Construction of the Sankyu Amata Nakorn Freight Center, 1,410, June 2020, warehouse area: 9,939 m², building: single-story steel-frame structure」

    The planned Amata Nakorn Logistics Center was completed in June 2020 and was disclosed as a base with a warehouse area of 9,939 m².
  2. FY2020SoftenedAnnual report

    「Sankyu-Thai Co.,Ltd, Thailand, Bangkok, Logistics Business, Amata Nakorn Logistics Center construction, 1,720, 914, internal funds, August 2019, June 2020, total floor area: 9,327 m², building: single-story steel-frame structure」

    The Amata Nakorn Logistics Center project is continuing, but the scheduled completion has been pushed back further, from April 2020 to June 2020.
  3. FY2019SoftenedAnnual report

    「Sankyu-Thai Co.,Ltd., Thailand, Bangkok, Logistics Business, Amata Nakorn Logistics Center construction, 1,720, -, internal funds, borrowings and other sources, August 2019, April 2020, total floor area: 9,327 m², building: single-story steel-frame structure」

    The Amata Nakorn Logistics Center project is continuing, but the scheduled timing has been pushed back from the previously stated start in January 2019 and completion in September 2019 to a start in August 2019 and completion in April 2020.
  4. FY2019-Q3First statedAnnual report

    「Sankyu-Thai Co., Ltd. Thailand Bangkok Logistics business Construction of the Amata Nakorn Logistics Center 1,720 Internal funds Borrowings, etc. January 2019 September 2019 Total floor area: 9,327㎡ Building: single-story steel-frame structure」

    A plan to construct the Amata Nakorn Logistics Center in Bangkok, Thailand, was newly disclosed. The planned investment is ¥1,720 million, with construction scheduled to start in January 2019 and finish in September 2019. The facility will be a single-story steel-frame building with a total floor area of 9,327 m².
Moved together

"Stable Shareholder Returns and a ¥11 Dividend" moved the same way as this thread, in the same document, in 2 of its 4 moves.

2★1
  1. ★This thread
  2. 1Stable Shareholder Returns and a ¥11 Dividend2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Sankyu's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.