Komori
Hiroshima Electric Railway (9033) · InitiativeAdvanced

Company-wide risk response and department-specific safety management

First written in FY2017. 1 of 3 entries say "Restated". Latest entry: FY2020.

3entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017 – FY20182017: 120172018: 120182019: 020192020: 12020
Same theme, other companies
Emergency Response Framework Based on a Business Continuity Plan (BCP)A theme 347 companies write about · 83 as a headwind · 268 as a tailwind

The whole theme swung hardest in 2020: 19 of 111 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 196 companies compared. The sentences above are computed from all 196.Comparing 200 of the theme's 352 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2020AdvancedAnnual report

    「The Group is taking measures in stages, including formulating a business continuity plan (BCP) and disaster response manuals, conducting disaster preparedness drills and elevating important facilities above ground level.」

    The company specifically describes BCP, disaster response manuals, disaster preparedness drills and elevating important facilities as risk response measures.
  2. FY2018RestatedAnnual report

    「When a company-wide risk or a risk requiring an emergency response arises, the Representative Director and President, as the officer responsible for overseeing risk response, directs each director. Under the direction of the officer responsible for overseeing risk response, each director directs the department in their charge to minimize damage arising from the risk.」

    The company-wide risk response framework led by the President as the officer responsible for overall coordination, together with safety management and training in each department, continues.
  3. FY2017First statedAnnual report

    「When a company-wide risk or a risk requiring an emergency response arises, the Representative Director and President, as the officer responsible for overseeing risk response, directs each director. Under the direction of the officer responsible for overseeing risk response, each director directs the department in their charge to minimize damage arising from the risk.」

    The company describes a company-wide risk response framework led by the Representative Director and President as the officer responsible for overall coordination, along with department-specific safety management rules and training for rail, bus and other operations.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Hiroshima Electric Railway's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.