Annual Securities Report — FY2025
What Hiroshima Electric Railway Co.,Ltd. reported for the period from 2025-04-01 to 2026-03-31.
Filed 2026-06-24View the original on EDINET
How much it says
76Very detailed
What moved here
31named for the first time
Its own wording
63terms
Which filing this is
36/ 36newest
No officer data yetThis company's filings have not been read for officers yet. Nothing is missing from the filings — the roster simply has not been extracted.
The gist
For the consolidated results for the period from 1 April 2025 through 31 March 2026, Hiroshima Electric Railway Co.,Ltd. reported higher operating revenue and narrower operating and ordinary losses, while net income attributable to owners of the parent decreased from the previous period rather than increasing. The filing also states that A&C was acquired for cash consideration on 2 February 2026, made a wholly owned subsidiary through the acquisition of shares, and included within the scope of consolidation.
Komori's summary of this document, not the document's own words.76Very detailed
How much this filing saysA weighted roll-up of 11 rubric dimensions, each scored from a fixed set of questions asked against this filing — built only from the 37 this document could answer. It measures how specific the disclosure is, not whether the company is doing well. Derived from the data, not editorial.
76
Very detailed
68
Detailed
83
Very detailed
100
Very detailed
100
Very detailed
41
Thin
69
Detailed
100
Very detailed
53
Typical
79
Very detailed
73
Detailed
R&D spendNot disclosedThis document does not carry the figure.
Cash left over-26億円Cash from the business, less what went into equipment.
Spent on equipment55億円Plants, machines — things meant to last.
Employees2,241Headcount at the end of this period.
How to read this page
This is not the documentIt is Komori's reading of the filing submitted to EDINET. The original is linked above.
The score is not a verdictIt measures how specific the disclosure is. It says nothing about results or where the share price goes.
When it updatesContent lands once the filing has been read through. Right after submission, the summary can still be empty.