Komori
Chichibu Railway (9012) · InitiativeAchieved

Introduction of a train operation information system

First written in FY2016. 1 of 4 entries say "Advanced", first in FY2017. Latest entry: FY2018.

4entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2017RestatedFY2018-Q22016: 120162017: 220172018: 12018
Same theme, other companies
Railway Station Service Information and Wi-Fi Infrastructure ImprovementsA theme 6 companies write about · 0 as a headwind · 8 as a tailwind

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2018AchievedAnnual report

    「Installation of the passenger information system (digital signage) was completed, and operations began at all passenger stations.」

    Installation of digital signage was completed, and operations began at all passenger stations.
  2. FY2018-Q2RestatedAnnual report

    「In addition, as part of efforts to improve service, we proceeded with the installation of a passenger information system (digital signage) providing train operation information and other information, working to improve customer convenience.」

    Installation of digital signage and efforts to improve convenience are continuing, but no new progress figures, such as the number of stations where it has been installed, are provided.
  3. FY2017AdvancedAnnual report

    「As part of efforts to improve service, we introduced a passenger information system (digital signage) providing train operation information and other information from the current fiscal year, and began operating it at 14 stations. Installation at the remaining 22 stations is planned for the following fiscal year.」

    Digital signage began operating at 14 stations, progressing to the stage where installation at the remaining 22 stations is planned for the following fiscal year.
  4. FY2016First statedAnnual report

    「In the railway business, as part of efforts to improve service, we plan to introduce a passenger information system (digital signage) providing train operation information.」

    The company plans to introduce digital signage providing train operation information as a service improvement measure.
Moved together

"Revitalizing areas along the railway line through new stations" moved the same way as this thread, in the same document, in 2 of its 4 moves.

2★1
  1. ★This thread
  2. 1Revitalizing areas along the railway line through new stations2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Chichibu Railway yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.