Komori
Wadakohsan (8931) · InitiativeRestated

Cost Optimization and Quality Improvement Leveraging Relationships with Design Firms and Construction Companies

First written in FY2018. 5 of 6 entries say "Restated". Latest entry: FY2025.

6entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018 – FY20252018: 120182019: 120192020: 020202021: 020212022: 120222023: 120232024: 120242025: 12025
Same theme, other companies
Advanced Management of Outsourced Construction Work through Collaboration with General ContractorsA theme 4 companies write about · 0 as a headwind · 4 as a tailwind

2 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「In addition, we intend to strive to achieve both cost optimization and higher quality by maintaining close relationships with local architectural firms and construction companies.」

    Measures to achieve both cost optimization and higher quality continue to be implemented based on relationships with local architectural firms and construction companies.
  2. FY2024RestatedAnnual report

    「In addition, we will strive to achieve both cost optimization and higher quality while maintaining close relationships with local architectural firms and construction companies.」

    Measures to achieve both cost optimization and higher quality continue to be implemented based on relationships with local architectural firms and construction companies.
  3. FY2023RestatedAnnual report

    「In addition, we will strive to achieve both cost optimization and higher quality while maintaining close relationships with local architectural firms and construction companies.」

    Measures to achieve both cost optimization and higher quality continue to be implemented based on relationships with local architectural firms and construction companies.
  4. FY2022RestatedAnnual report

    「In addition, we will strive to achieve both cost optimization and higher quality while maintaining close relationships with local architectural firms and construction companies.」

    Measures to achieve both cost optimization and higher quality continue to be implemented by leveraging relationships with local architectural firms and construction companies.
  5. FY2019RestatedAnnual report

    「In addition, we will strive to achieve both cost optimization and higher quality while maintaining close relationships with local architectural firms and construction companies.」

    Measures to achieve both cost and quality continue to be implemented based on relationships with local architectural firms and construction companies.
  6. FY2018First statedAnnual report

    「In addition, we will strive to achieve both cost optimization and higher quality while maintaining close relationships with local architectural firms and construction companies.」

    Measures to achieve both cost and quality are clearly stated, based on relationships with local architectural firms and construction companies.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Wadakohsan yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Cost Optimization and Quality Improvement Leveraging Relationships with Design Firms and Construction Companies | WADAKOHSAN CORPORATION (8931) | Komori