Promoting Sales of For-Sale Condominiums and Achieving Sell-Out
First written in FY2016-Q2. 31 of 33 entries say "Advanced", first in FY2016-Q3. Latest entry: 2026-10-27.
The whole theme swung hardest in 2018: 1 of 9 companies on the "Worse" side.
4 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「Deliveries of 910 condominium units are expected in the following consolidated fiscal year, the fiscal year ending March 2027, and the contract progress rate was 70.7% as of the end of March 2026.」
The plan for the fiscal year ending March 2027 calls for delivery of 910 condominium units, with a contract progress rate of 70.7% as of the end of March 2026. Deliveries in the fiscal year ending March 2026 totaled 971 units, down from 1,195 units in the previous year. - FY2026-H1AdvancedAnnual report
「As sales progressed steadily, the contracted-unit progress rate against the full-year plan for condominium deliveries stood at 81.6% as of the end of the interim consolidated accounting period. In addition, all units of Le Jade Hokkaido Kita-Hiroshima, a condominium under development as part of the Station West Exit Area Revitalization Project being undertaken as a public-private partnership near JR Kita-Hiroshima Station (Kita-Hiroshima, Hokkaido), were fully contracted during the interim period. Delivery is scheduled for November 2026, and the property has 197 units.」
The contracted-unit progress rate stood at 81.6% against the 2026年3月期 full-year delivery plan of 1,000 units, and all 197 units of the Kita-Hiroshima condominium were fully contracted. - FY2025AdvancedAnnual report
「Against the condominium sales plan of 1,250 units for the fiscal year ending March 2025, 1,195 units were delivered.」
The company delivered 1,195 units against the condominium sales plan of 1,250 units for the fiscal year ending March 2025. - FY2025-H1AdvancedAnnual report
「Against the condominium sales plan of 1,250 units for the fiscal year ending March 2025, the number of contracted units had reached 85.5% as of 30 September 2024.」
Against the condominium sales plan of 1,250 units for the fiscal year ending March 2025, the contracted-unit progress rate was 85.5% at the end of September 2024. - FY2023-Q4AdvancedAnnual report
「In terms of sales progress, 12 of the properties completed during the current period, including Le Jade Hokkaido Ballpark (Kita-Hiroshima, Hokkaido; 118 units), have been fully delivered. Of the properties scheduled for delivery during the current or following period, 5, including Le Jade Nagai Park Avenue (Sumiyoshi-ku, Osaka; 52 units), are fully contracted.」
The number of properties completed during the current period with all units delivered increased from 5 in the previous disclosure to 12, and 5 fully contracted properties were also confirmed, indicating further progress in condominium sales. - FY2023-Q2AdvancedAnnual report
「In terms of sales progress, 5 of the properties completed during the current period, including Le Jade Hokkaido Ballpark (Kita-Hiroshima, Hokkaido; 118 units), have been fully delivered. Of the properties scheduled for delivery during the current or following period, 6, including Le Jade Matsudo Station Front (Matsudo, Chiba; 44 units), are fully contracted.」
For properties completed during the current period, all units have been delivered at 5 properties, while 6 properties scheduled for delivery during the current or following period are fully contracted. - FY2023-Q1AdvancedAnnual report
「In terms of sales progress, 8 properties, including Le Jade Hokkaido Ballpark (Kita-Hiroshima, Hokkaido; 118 units), sold out, while 5 properties, including Le Jade Matsudo Station Front (Matsudo, Chiba; 44 units), are fully contracted.」
The disclosure reports 8 condominium properties sold out and 5 properties fully contracted, indicating concrete progress in sales. - FY2022-Q3AdvancedAnnual report
「In terms of sales progress, the 9 properties Le Jade Uehommachi (Tennoji-ku, Osaka; 56 units), Le Jade Nishinomiya-Kitaguchi Hinokuchicho (Nishinomiya, Hyogo; 94 units), Le Jade Tennoji Katsuyama (Tennoji-ku, Osaka; 39 units), Le Jade Senri Furueda (Suita, Osaka; 71 units), Le Jade Suma Myohoji Station Front (Suma-ku, Kobe; 40 units), Le Jade Bio Makuhari Hongo (Hanamigawa-ku, Chiba; 70 units), Le Jade Takatsuki Nishimakami (Takatsuki, Osaka; 43 units), Mirakita City Himeji (Himeji, Hyogo; 143 units) and Le Jade Senri Aoyamadai (Suita, Osaka; 152 units) sold out. Le Jade Yao Sakuragaoka (Yao, Osaka; 72 units) and Le Jade Hokkaido Ballpark (Kita-Hiroshima, Hokkaido; 118 units) became fully contracted, among other developments, and contracts and deliveries are progressing steadily.」
In addition to the 9 properties that had previously sold out, Le Jade Hokkaido Ballpark became fully contracted, confirming progress in condominium sales. - FY2022-Q2AdvancedAnnual report
「The 9 properties Le Jade Uehommachi (Tennoji-ku, Osaka; 56 units), Le Jade Nishinomiya-Kitaguchi Hinokuchicho (Nishinomiya, Hyogo; 94 units), Le Jade Tennoji Katsuyama (Tennoji-ku, Osaka; 39 units), Le Jade Senri Furueda (Suita, Osaka; 71 units), Le Jade Suma Myohoji Station Front (Suma-ku, Kobe; 40 units), Le Jade Bio Makuhari Hongo (Hanamigawa-ku, Chiba; 70 units), Le Jade Takatsuki Nishimakami (Takatsuki, Osaka; 43 units), Mirakita City Himeji (Himeji, Hyogo; 143 units) and Le Jade Senri Aoyamadai (Suita, Osaka; 152 units) sold out, while Le Jade Yao Sakuragaoka (Yao, Osaka; 72 units) became fully contracted. The number of units delivered increased from the initial plan, and sales are progressing steadily.」
The 9 properties sold out and 1 property fully contracted were confirmed, and the number of units delivered exceeded the initial plan. Both the launch of new sales projects and sell-out performance progressed. - FY2022-Q1AdvancedAnnual report
「The 4 properties Le Jade Nishinomiya-Kitaguchi Hinokuchicho (Nishinomiya, Hyogo; 94 units), Le Jade Tennoji Katsuyama (Tennoji-ku, Osaka; 39 units), Le Jade Senri Furueda (Suita, Osaka; 71 units) and Le Jade Suma Myohoji Station Front (Suma-ku, Kobe; 40 units) sold out, while the 2 properties Le Jade Uehommachi (Tennoji-ku, Osaka; 56 units) and Le Jade Bio Makuhari Hongo (Hanamigawa-ku, Chiba; 70 units) are fully contracted.」
The disclosure reports 4 properties sold out and 2 properties fully contracted, indicating concrete progress in condominium sales. - FY2021-Q3AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Gifu (Gifu, Gifu; 54 units), Le Jade Takatsuki Bessho (Takatsuki, Osaka; 49 units), Le Jade Takatsuki Nishimakami (Takatsuki, Osaka; 43 units) and Grand Crea Ichinomiya (Ichinomiya, Aichi; 41 units; a joint project with Chuden Real Estate). Le Jade Mukonoso Honmachi (Amagasaki, Hyogo; 33 units) sold out upon completion, while Le Jade Nagai Koen-dori (Sumiyoshi-ku, Osaka; 108 units) and Le Jade Neyagawa Koen (Neyagawa, Osaka; 60 units), scheduled for completion during the period, and Le Jade Hirano (Hirano-ku, Osaka; 58 units), Le Jade Tsukuba Station Front (Tsukuba, Ibaraki; 218 units), Le Jade Kakegawa Station Front (Kakegawa, Shizuoka; 83 units) and Le Jade Urawa (Urawa-ku, Saitama; 44 units), scheduled for completion in the following period, are fully contracted.」
In addition to launching sales for new condominium projects, the disclosure reports 1 property sold out upon completion and 6 properties scheduled for completion during the current or following period that are fully contracted, indicating concrete progress in sales. - FY2021-Q2AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Ibaraki Higashinakajo (Ibaraki, Osaka; 40 units), Le Jade Urawa (Urawa-ku, Saitama; 44 units), Le Jade Kakegawa Station Front (Kakegawa, Shizuoka; 83 units), Le Jade Gifu Kinkoen (Gifu, Gifu; 38 units) and Le Jade Kyoto Horikawa (Shimogyo-ku, Kyoto; 60 units). Le Jade Nagai Koen-dori (Sumiyoshi-ku, Osaka; 108 units) and Le Jade Hirano (Hirano-ku, Osaka; 58 units) are fully contracted.」
Sales began for more than 5 new condominium projects in multiple regions, and 2 properties, Le Jade Nagai Koen-dori and Le Jade Hirano, became fully contracted. - FY2021-Q1AdvancedAnnual report
「In the residential development business, we have begun sales of new projects including Le Jade Hirano (Hirano Ward, Osaka; 58 total units), Le Jade Uehommachi (Tennoji Ward, Osaka; 56 total units) and Le Jade Tsukuba Station Front (Tsukuba, Ibaraki Prefecture; 218 total units), while Le Jade Nagai Koen-dori (Sumiyoshi Ward, Osaka; 108 total units) has sold out under contract.」
The disclosure reports the launch of sales for 3 new projects and the full contracting of Le Jade Nagai Koen-dori, which has 108 units, indicating concrete progress in condominium sales. - FY2020-Q3AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Mukonoso Honmachi (Amagasaki, Hyogo; 33 units), Le Jade Nagai Koen-dori (Sumiyoshi-ku, Osaka; 108 units), Le Jade Senri Aoyamadai (Suita, Osaka; 152 units) and Le Jade Senri Furueda (Suita, Osaka; 71 units). Le Jade Kuzuha (Hirakata, Osaka; 78 units), Le Jade Kotoen (Nishinomiya, Hyogo; 49 units), Le Jade Higashisumiyoshi Imagawa Ryokudo (Higashisumiyoshi-ku, Osaka; 41 units) and Le Jade Toyota Master Hills (Hino, Tokyo; 63 units) sold out upon completion, while Le Jade Morinomiya (Higashinari-ku, Osaka; 45 units), scheduled for completion during the period, and Le Jade Nishi-Akashi (Akashi, Hyogo; 77 units), scheduled for completion in the following period, are fully contracted.」
The disclosure reports the launch of sales for 4 new condominium projects, 4 properties sold out upon completion and 2 properties scheduled for completion during the current or following period that are fully contracted, indicating concrete progress in sales performance. - FY2020-Q2AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Okurayama (Kohoku-ku, Yokohama; 25 units), Le Jade Morinomiya (Higashinari-ku, Osaka; 45 units), Le Jade Yamato-Takada Station Front (Yamato-Takada, Nara; 205 units) and Le Jade Suma Myohoji Station Front (Suma-ku, Kobe; 40 units). Le Jade Kuzuha (Hirakata, Osaka; 78 units), Le Jade Kotoen (Nishinomiya, Hyogo; 49 units) and Le Jade Higashisumiyoshi Imagawa Ryokudo (Higashisumiyoshi-ku, Osaka; 41 units) sold out upon completion.」
In addition to launching sales for 4 new projects, the disclosure reports 3 properties sold out upon completion, indicating concrete progress in condominium sales. - FY2020-Q1AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Okurayama (Kohoku-ku, Yokohama; 25 units), Le Jade Morinomiya (Higashinari-ku, Osaka; 45 units) and Le Jade Yamato-Takada Station Front (Yamato-Takada, Nara; 205 units). Le Jade Kuzuha (Hirakata, Osaka; 78 units) and Le Jade Kotoen (Nishinomiya, Hyogo; 49 units) sold out upon completion, while Le Jade Higashisumiyoshi Imagawa Ryokudo (Higashisumiyoshi-ku, Osaka; 41 units), scheduled for completion during the period, is fully contracted.」
The disclosure reports the launch of sales for 3 new projects, 2 properties sold out upon completion and a property scheduled for completion during the period that is fully contracted, indicating concrete progress in condominium sales. - FY2019-Q3AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Toyota Master Hills (Hino, Tokyo; 63 units), Le Jade Utsukushigaoka (Aoba-ku, Yokohama; 90 units), Le Jade Nishinomiya-Kitaguchi Hinokuchicho (Nishinomiya, Hyogo; 94 units) and Le Jade Takatsuki Miyanomachi (Takatsuki, Osaka; 99 units). Le Jade Suma Kaihin Koen (Suma-ku, Kobe; 30 units), Grand Le Jade Takatsuki Tenjin (Takatsuki, Osaka; 28 units) and Le Jade Takatsuki Kosobe (Takatsuki, Osaka; 181 units) sold out upon completion. Le Jade Shinkanaoka Park Fields (Kita-ku, Sakai; 204 units), scheduled for completion during the period, and Le Jade Kuzuha (Hirakata, Osaka; 78 units) and Le Jade Higashisumiyoshi Imagawa Ryokudo (Higashisumiyoshi-ku, Osaka; 41 units), scheduled for completion in the following period, are fully contracted.」
In addition to launching sales for 4 new projects, the disclosure reports 3 properties sold out upon completion and 4 properties scheduled for completion during the current or following period that are fully contracted, indicating concrete progress in sales. - FY2019-Q2AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Toyota Master Hills (Hino, Tokyo; 63 units), Le Jade Utsukushigaoka (Aoba-ku, Yokohama; 90 units), Le Jade Nishinomiya-Kitaguchi Hinokuchicho (Nishinomiya, Hyogo; 94 units) and Le Jade Takatsuki Miyanomachi (Takatsuki, Osaka; 99 units). Le Jade Suma Kaihin Koen (Suma-ku, Kobe; 30 units), Le Jade Shinkanaoka Park Fields (Kita-ku, Sakai; 204 units) and Grand Le Jade Takatsuki Tenjin (Takatsuki, Osaka; 28 units), scheduled for completion during the period, and Le Jade Kuzuha (Hirakata, Osaka; 78 units), scheduled for completion in the following period, are fully contracted.」
In addition to launching sales for 4 new condominium projects, the disclosure reports 3 properties scheduled for completion during the period and 1 scheduled for completion in the following period that are fully contracted, indicating concrete progress in sales activities. - FY2019-Q1AdvancedAnnual report
「In the condominium development business, sales have begun for new projects including Le Jade Tsujido Higashikaigan (Fujisawa, Kanagawa; 51 units), Grand Le Jade Todoroki (Setagaya, Tokyo; 43 units), Le Jade Ikeda Masumicho (Ikeda, Osaka; 35 units) and Le Jade Kotoen (Nishinomiya, Hyogo; 49 units). Le Jade Suma Kaihin Koen (Suma-ku, Kobe; 30 units), scheduled for completion during the period, and Le Jade Kuzuha (Hirakata, Osaka; 78 units), scheduled for completion in the following period, are fully contracted.」
The disclosure reports the launch of sales for 4 new condominium projects and 2 properties scheduled for completion during the current or following period that are fully contracted, providing concrete evidence of sales progress. - FY2018AdvancedAnnual report
「In the condominium development business, Feel Garden Minami-Senri (Suita, Osaka; 214 units), Le Jade Southern Gate Toyota (Hino, Tokyo; 51 units), Le Jade Kawasaki (Saiwai-ku, Kawasaki; 79 units), Le Jade Minamimorimachi (Kita-ku, Osaka; 29 units), Grand Le Jade Okamoto (Higashinada-ku, Kobe; 18 units) and Le Jade Nagaokakyo (Nagaokakyo, Kyoto; 35 units), completed during the period, sold out upon completion. Sales of condominium projects including Grand Le Jade Jiyugaoka (Meguro, Tokyo; 23 units), Le Jade Nakano (Nakano, Tokyo; 25 units) and Le Jade Bio Funabashi Kitanarashino (Funabashi, Chiba; 50 units) are also progressing steadily.」
The disclosure reports 6 properties sold out upon completion and progress in sales of multiple new and ongoing projects, indicating concrete progress in sales performance. - FY2018-Q2AdvancedAnnual report
「In the condominium development business, Feel Garden Minami-Senri (Suita, Osaka; 214 units), Le Jade Southern Gate Toyota (Hino, Tokyo; 51 units) and Le Jade Kawasaki (Saiwai-ku, Kawasaki; 79 units), completed during the period, sold out upon completion. Sales have begun for new condominium projects including Grand Le Jade Jiyugaoka (Meguro, Tokyo; 23 units) and Le Jade Nakano (Nakano, Tokyo; 25 units), while Le Jade Minamimorimachi (Kita-ku, Osaka; 29 units) and Grand Le Jade Okamoto (Higashinada-ku, Kobe; 18 units), scheduled for completion during the period, are fully contracted.」
The disclosure reports 3 properties sold out upon completion, the launch of sales for new condominium projects including Le Jade Nakano, and 2 properties fully contracted, confirming concrete progress in sales. - FY2018-Q1AdvancedAnnual report
「In the condominium development business, Feel Garden Minami-Senri (Suita, Osaka; 214 units), Le Jade Southern Gate Toyota (Hino, Tokyo; 51 units) and Le Jade Kawasaki (Kawasaki, Kanagawa; 79 units), completed during the period, sold out upon completion. Sales have begun for new condominium projects including Grand Le Jade Jiyugaoka (Meguro, Tokyo; 23 units), while Le Jade Minamimorimachi (Kita-ku, Osaka; 29 units) and Grand Le Jade Okamoto (Higashinada-ku, Kobe; 18 units), scheduled for completion during the period, are fully contracted.」
Feel Garden Minami-Senri, Le Jade Southern Gate Toyota and Le Jade Kawasaki sold out upon completion, while sales began for new projects and 2 properties were fully contracted. - FY2017AdvancedAnnual report
「In the residential development business, Le Jade Sakurajosui Tiara (Setagaya Ward, Tokyo; 42 total units) and Le Jade Takatsuki The Marks (Takatsuki, Osaka Prefecture; 95 total units), completed during the period, have been delivered and sold out. Sales of Le Jade Yokohama Hanano-ki (Minami Ward, Yokohama; 69 total units), Le Jade Takatsuki Cross (Takatsuki, Osaka Prefecture; 80 total units), Le Jade Otsu Nagisa Park (Otsu, Shiga Prefecture; 44 total units), Le Jade Fushimi Chushojima (Fushimi Ward, Kyoto; 83 total units) and other properties are progressing steadily. Feel Garden Minami-Senri (Suita, Osaka Prefecture; 214 total units), Le Jade Southern Gate Toyoda (Hino, Tokyo; 51 total units), Le Jade Minamimorimachi (Kita Ward, Osaka; 29 total units) and Grand Le Jade Okamoto (Higashinada Ward, Kobe; 18 total units), scheduled for completion in the following period, have sold out under contract.」
Le Jade Sakurajosui Tiara and Le Jade Takatsuki The Marks have been delivered and sold out, and sellouts under contract have also been confirmed for 4 properties scheduled for completion in the following period. - FY2017-Q3AdvancedAnnual report
「Sales of properties scheduled for completion during the period, including Le Jade Otsu Nagisa Park (Otsu, Shiga Prefecture; 44 total units), Le Jade Yokohama Hanano-ki (Yokohama, Kanagawa Prefecture; 69 total units), Le Jade Takatsuki Cross (Takatsuki, Osaka Prefecture; 80 total units) and Le Jade Fushimi Chushojima (Fushimi Ward, Kyoto; 83 total units), are progressing steadily. Le Jade Sakurajosui Tiara (Setagaya Ward, Tokyo; 42 total units) has been completed and sold out, while Le Jade Takatsuki The Marks (Takatsuki, Osaka Prefecture; 95 total units), Feel Garden Minami-Senri (Suita, Osaka Prefecture; 214 total units) and Le Jade Southern Gate Toyoda (Hino, Tokyo; 51 total units), scheduled for completion in the following period, have sold out under contract.」
Le Jade Sakurajosui Tiara progressed from being sold out under contract to being completed and sold out. Sales progress and sellouts under contract for other properties continue to be reported. - FY2017-Q2AdvancedAnnual report
「Sales of properties scheduled for completion during the period, including Grand Le Jade Wakamatsucho Residence (Shinjuku Ward, Tokyo; 31 total units), Le Jade Otsu Nagisa Park (Otsu, Shiga Prefecture; 44 total units), Le Jade Yokohama Hanano-ki (Yokohama, Kanagawa Prefecture; 69 total units), Le Jade Takatsuki Cross (Takatsuki, Osaka Prefecture; 80 total units) and Le Jade Fushimi Chushojima (Fushimi Ward, Kyoto; 83 total units), are progressing steadily. Le Jade Takatsuki The Marks (Takatsuki, Osaka Prefecture; 95 total units), Le Jade Sakurajosui Tiara (Setagaya Ward, Tokyo; 42 total units), and the properties scheduled for completion in the following period, Feel Garden Minami-Senri (Suita, Osaka Prefecture; 214 total units) and Le Jade Southern Gate Toyoda (Hino, Tokyo; 51 total units), have sold out under contract.」
In addition to properties for which sales progress had previously been reported, Le Jade Sakurajosui Tiara, Feel Garden Minami-Senri and Le Jade Southern Gate Toyoda have been confirmed as sold out under contract, demonstrating concrete progress in sales of multiple properties. - FY2017-Q1RestatedAnnual report
「Sales of properties scheduled for completion during the period, including Grand Le Jade Wakamatsucho Residence (Shinjuku Ward, Tokyo; 31 total units), Le Jade Sakurajosui Tiara (Setagaya Ward, Tokyo; 42 total units) and Le Jade Otsu Nagisa Park (Otsu, Shiga Prefecture; 44 total units), are progressing steadily. Le Jade Takatsuki The Marks (Takatsuki, Osaka Prefecture; 95 total units) has sold out under contract.」
The report describes sales progress for multiple condominiums and the sellout under contract of Le Jade Takatsuki The Marks, but does not indicate any new completed sellouts or deliveries. - FY2016AdvancedAnnual report
「All units of Le Jade Toyoda (Hino, Tokyo; 53 total units, including 10 non-sale units), Le Jade Yokohama Tsurumi (Tsurumi Ward, Yokohama; 45 total units), Le Jade Takatsuki (Takatsuki, Osaka Prefecture; 136 total units) and Le Jade Nishitanabe Abeno Hannancho (Abeno Ward, Osaka; 38 total units), completed during the period, have been delivered and sold out. Le Jade Takatsuki The Marks (Takatsuki, Osaka Prefecture; 95 total units), scheduled for completion in fiscal 2017, has also sold out under contract, and progress has been steady.」
For properties previously reported as sold out under contract or completed, delivered and sold out, all units of 4 properties have now been delivered and sold out, and the property scheduled for completion in fiscal 2017 has also sold out under contract. - FY2016-Q3AdvancedAnnual report
「In the residential development business, Le Jade Toyoda (Hino, Tokyo; 53 total units, including 10 non-sale units) was completed, delivered and sold out in August 2016. Le Jade Yokohama Tsurumi (Tsurumi Ward, Yokohama; 45 total units), Le Jade Takatsuki (Takatsuki, Osaka Prefecture; 136 total units) and Le Jade Nishitanabe Abeno Hannancho (Abeno Ward, Osaka; 38 total units), scheduled for completion and delivery during the period, have sold out under contract, and progress has been steady.」
In addition to the properties previously reported as sold out under contract, Le Jade Toyoda was completed, delivered and sold out in August 2016. Sales progress for multiple properties also continues. - FY2016-Q2First statedAnnual report
「The following properties scheduled for completion and delivery during the period have sold out under contract: Le Jade Toyoda (Hino, Tokyo; 53 total units, including 10 non-sale units), Le Jade Yokohama Tsurumi (Tsurumi Ward, Yokohama; 45 total units), Le Jade Takatsuki (Takatsuki, Osaka Prefecture; 136 total units) and Le Jade Nishitanabe Abeno Hannancho (Abeno Ward, Osaka; 38 total units). Sales of Le Jade Setagaya Kinuta (Setagaya Ward, Tokyo), Le Jade Minami-Kasai Park Arena (Edogawa Ward, Tokyo) and other properties are also progressing steadily.」
The report specifically describes sellouts under contract for properties scheduled for completion and delivery during the period and progress in sales of multiple properties.