Komori
Amg Holdings (8891) · InitiativeIncrease in detached-home contracts and deliveries, decrease in condominium deliveriesLatest Earnings (2026-08-07): "Advanced"

Launch of Condominiums Scheduled for Completion in the Current and Next Fiscal Years and Securing Contracts

First written in FY2017-Q1. 12 of 36 entries say "Advanced", first in FY2017-Q2. Latest entry: 2026-08-07.

36entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q2 – FY2018-Q3OtherFY2020-Q2 – FY2021-Q3OtherFY2022-Q2 – FY2024-Q3OtherFY2025-H1 – FY2026-H12016: 220162017: 420172018: 420182019: 420192020: 420202021: 320212022: 420222023: 420232024: 320242025: 220252026: 22026
Same theme, other companies
Contract Backlog and Scheduled Deliveries in the Condominium Development BusinessA theme 8 companies write about · 1 as a headwind · 15 as a tailwind

The whole theme swung hardest in 2018: 1 of 8 companies on the "Worse" side.

3 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1Increase in detached-home contracts and deliveries, decrease in condominium deliveriesAnnual report

    「During the interim consolidated fiscal period, the Company entered into new contracts for 164 detached houses (156 units in the previous period) and delivered 170 units (157 units in the previous period). For condominiums, the Company entered into new contracts for 80 units (77 units in the previous period) and delivered 49 units (65 units in the previous period).」

    For detached houses, new contracts increased from 156 to 164 units and deliveries increased from 157 to 170 units. For condominiums, new contracts increased from 77 to 80 units, while deliveries declined from 65 to 49 units.
  2. FY2025Declines in sales launches, contracts and deliveriesAnnual report

    「During the consolidated fiscal year, the Company began selling 5 newly built condominium projects comprising 236 units (More Grace Ichinomiya Honmachi, More Grace Owariasahi, More Grace Moriyama, More Grace Chikusa Haruoka and More Grace Sumiyoshi). Including properties launched for sale in the previous period, 176 units (182 units in the previous period) and 1 whole-building condominium were contracted.」

    Sales began for 5 newly built condominium projects comprising 236 units, but contracts fell to 176 units from 182 units in the previous period. Deliveries also declined to 144 units from 169 units.
  3. FY2025-H1Sales launches and deliveries increased, while contracts decreasedAnnual report

    「In the condominium development business, during the interim consolidated fiscal period, the Company began selling 2 newly built condominium projects comprising 113 units (More Grace Ichinomiya Honmachi and More Grace Owariasahi). Including properties launched for sale in the previous period, 77 units (110 units in the previous period) were contracted. In addition, 65 units, comprising 1 newly completed project and completed inventory, were delivered (58 units in the previous period).」

    Sales began for 2 newly built condominium projects comprising 113 units, while contracts fell to 77 units from 110 units in the same period of the previous year. Deliveries rose to 65 units from 58 units.
  4. FY2024AdvancedAnnual report

    「During the consolidated fiscal year, the Company began selling 4 newly built condominium projects comprising 141 units (More Grace Nishi-Gifu Station The Casa, More Grace Ichinomiya Shinsei, More Grace Shin-Kisogawa Station Residence and More Grace Kakamigahara Midrise). Including properties launched for sale in the previous period and 1 pre-owned unit, 182 units (95 units in the previous period) were contracted.」

    Sales began for 4 newly built condominium projects comprising 141 units, and the number of contracted units rose to 182 from 95 in the previous period.
  5. FY2024-Q3Increases in contracts and deliveriesAnnual report

    「In the condominium development business, during the cumulative third quarter of the consolidated fiscal year, the Company began selling 3 newly built condominium projects comprising 101 units (More Grace Nishi-Gifu Station The Casa, More Grace Ichinomiya Shinsei and More Grace Shin-Kisogawa Residence). Including properties launched for sale in the previous period and 1 pre-owned unit, 148 units (69 units in the previous period) were contracted. In addition, 76 units, comprising 2 newly completed projects and completed inventory, were delivered (74 units in the previous period).」

    Sales began for 3 newly built condominium projects comprising 101 units, and contracts rose to 148 units from 69 units in the same period of the previous year. Deliveries also rose to 76 units from 74 units.
  6. FY2024-Q2Increase in contracted units, decrease in delivered unitsAnnual report

    「In the condominium development business, during the cumulative second quarter of the consolidated fiscal year, the Company began selling 3 newly built condominium projects comprising 101 units (More Grace Nishi-Gifu Station The Casa, More Grace Ichinomiya Shinsei and More Grace Shin-Kisogawa Residence). Including properties launched for sale in the previous period and 1 pre-owned unit, 110 units (42 units in the previous period) were contracted. In addition, 58 units, comprising 2 newly completed projects and completed inventory, were delivered (62 units in the previous period).」

    Sales began for 3 newly built condominium projects comprising 101 units, and contracts rose to 110 units from 42 units in the same period of the previous year. Deliveries, however, fell to 58 units from 62 units in the same period of the previous year.
  7. FY2024-Q1Increase in launches and contracted units, decrease in deliveriesAnnual report

    「In the condominium business, during the cumulative first quarter of the current consolidated fiscal year we began marketing 3 newly built condominiums comprising 101 units (More Grace Nishi-Gifu Station The Casa, More Grace Ichinomiya Shinsei and More Grace Shin-Kisogawa Residence) and contracted 60 units, including properties launched for sale from the previous period and 1 existing property (17 units in the previous period). Deliveries comprised 36 units from 2 newly completed properties and completed inventory (47 units in the previous period).」

    We began marketing 3 newly built condominiums comprising 101 units, and contracted units increased to 60 from 17 in the same period of the previous year. Deliveries, however, totaled 36 units, below 47 in the same period of the previous year.
  8. FY2023Decrease in launches, contracted units and deliveriesAnnual report

    「In the condominium business, during the consolidated fiscal year we began marketing 3 newly built condominiums comprising 100 units (More Grace Kozoji Forest Fort, More Grace Meieki The Gate and More Grace Chikusa Mid Stage) and contracted 95 units, including properties launched for sale from the previous period (174 units in the previous period). The decrease in contracted units was due to the smaller number of properties scheduled for completion in the current period than in the previous year (3 properties comprising 125 units in the current period, compared with 7 properties comprising 191 units in the previous period), as well as delays in the sales schedule during the period because excavation of the bedrock at More Grace Kozoji Forest Fort took longer than originally scheduled. Deliveries comprised 122 units from 3 newly completed properties and completed inventory (167 units in the previous period).」

    We began marketing 3 newly built condominiums comprising 100 units, but contracted units totaled 95, below 174 in the previous period. The decrease was attributed to the smaller number of properties scheduled for completion and delays in the sales schedule caused by bedrock excavation work. Deliveries also decreased to 122 units.
  9. FY2023-Q3Increase in launches, decrease in contracted units, increase in deliveriesAnnual report

    「In the cumulative third quarter of the current consolidated fiscal year, we began marketing 3 newly built condominiums comprising 100 units (More Grace Kozoji Forest Fort, More Grace Meieki The Gate and More Grace Chikusa Mid Stage) and contracted 69 units, including properties launched for sale from the previous period (138 units in the previous period). The decrease in contracted units was due to the smaller number of properties scheduled for completion in the current period than in the previous year (3 properties comprising 125 units in the current period, compared with 7 properties comprising 191 units in the previous period), as well as delays in the sales schedule during the period because the bedrock at More Grace Kozoji Forest Fort was harder than originally expected, requiring more time for excavation work. Deliveries comprised 74 units from 1 newly completed property and completed inventory (69 units in the previous period).」

    We began marketing 3 newly built condominiums comprising 100 units, while contracted units decreased to 69 from 138 in the same period of the previous year. The stated reasons for the decrease in contracts were the smaller number of properties scheduled for completion in the current period and delays in the sales schedule caused by the time required for excavation work due to the hard bedrock. Deliveries totaled 74 units, above the same period of the previous year.
  10. FY2023-Q2Increase in properties launched and deliveries, decrease in contracted unitsAnnual report

    「Despite this environment, in the cumulative second quarter of the current consolidated fiscal year, the condominium business launched 3 newly built condominiums comprising 100 units and contracted 42 units, including properties launched for sale from the previous period (86 units in the previous period). Deliveries comprised 62 units from 1 newly completed property and completed inventory (47 units in the previous period).」

    Newly built condominium launches totaled 3 properties and 100 units, while deliveries totaled 62 units and contracted units totaled 42, below 86 in the previous period.
  11. FY2023-Q1Increase in properties launched and deliveries, decrease in contracted unitsAnnual report

    「Despite this environment, in the cumulative first quarter of the current consolidated fiscal year, the condominium business launched 2 newly built condominiums comprising 71 units and contracted 17 units, including properties launched for sale from the previous period (41 units in the previous period). Deliveries comprised 47 units from 1 newly completed property and completed inventory (36 units in the previous period).」

    Newly built condominium launches totaled 2 properties and 71 units, while deliveries increased to 47 units from 36 in the same period of the previous year. Contracted units decreased to 17 from 41.
  12. FY2022Increase in properties launched, increase in contracted units, decrease in deliveriesAnnual report

    「Against this backdrop, during the consolidated fiscal year we launched 7 newly built condominiums comprising 219 units and contracted 174 units, including properties launched for sale from the previous period (168 units in the previous period). Deliveries comprised 167 units from 7 newly completed properties and completed inventory (179 units in the previous period).」

    Newly built condominium launches totaled 7 properties and 219 units, while contracted units totaled 174, above 168 in the previous period. Deliveries totaled 167 units, below 179.
  13. FY2022-Q3Properties launched flat, decrease in contracted units, increase in deliveriesAnnual report

    「Against this backdrop, during the cumulative third quarter of the current period we launched 7 newly built condominiums comprising 219 units and contracted 138 units, including properties launched for sale from the previous period (150 units in the previous period). Deliveries comprised 69 units from 2 newly completed properties and completed inventory (38 units in the previous period).」

    Newly built condominium launches totaled 7 properties and 219 units, the same level as in the same period of the previous year. Contracted units totaled 138, below 150, while deliveries totaled 69, above 38.
  14. FY2022-Q2Increase in properties launched, decrease in contracted units, increase in deliveriesAnnual report

    「Against this backdrop, during the cumulative second quarter of the current period we launched 7 newly built condominiums comprising 219 units and contracted 86 units, including properties launched for sale from the previous period (92 units in the previous period). Deliveries comprised 47 units from 1 newly completed property and completed inventory (28 units in the previous period).」

    Newly built condominium launches totaled 7 properties and 219 units. Contracted units totaled 86, below 92 in the same period of the previous year, while deliveries totaled 47, above 28.
  15. FY2022-Q1AdvancedAnnual report

    「Against this backdrop, during the quarter we launched 3 newly built condominiums comprising 83 units and contracted 41 units, including properties launched for sale from the previous period (24 units in the previous period). Deliveries comprised 36 units from 1 newly completed property and completed inventory (6 units in the previous period).」

    We launched 3 newly built condominiums comprising 83 units, contracted 41 units and delivered 36 units. Launches, contracts and deliveries all increased from 24 contracted units and 6 delivered units in the same period of the previous year.
  16. FY2021-Q3Increase in contracted units, weak deliveriesAnnual report

    「Against this backdrop, during the current period we launched 2 newly built condominiums comprising 94 units and contracted 150 units, including properties launched for sale from the previous period (125 units in the previous period). Deliveries comprised 38 units from 1 newly completed property, completed inventory and detached homes (152 units in the previous period).」

    We launched 2 newly built condominiums comprising 94 units, and contracted units totaled 150, above 125 in the same period of the previous year. Deliveries, however, totaled 38 units, below 152 in the same period of the previous year.
  17. FY2021-Q2Increase in contracted units, sharp decrease in deliveriesAnnual report

    「Against this backdrop, during the current period we launched 2 newly built condominiums comprising 94 units and contracted 92 units, including properties launched for sale from the previous period (89 units in the previous period). Deliveries comprised 28 units from 1 newly completed property, completed inventory and detached homes (135 units in the previous period).」

    We launched 2 newly built condominiums comprising 94 units, and contracted units increased to 92 from 89 in the same period of the previous year. Deliveries, however, fell sharply to 28 units from 135.
  18. FY2021-Q1Decrease in contracted units, sharp decrease in deliveriesAnnual report

    「Against this backdrop, during the current period we began marketing 1 newly built condominium comprising 45 units and contracted 24 units, including completed inventory and properties launched for sale from the previous period (51 units in the previous period). As no newly completed properties were available during the first quarter of the current period, deliveries comprised 6 units of completed inventory and 1 detached home (79 units in the previous period).」

    We began marketing 1 newly built condominium comprising 45 units, but contracted units totaled 24, below 51 in the same period of the previous year. Deliveries also decreased to 6 units from 79 in the same period of the previous year.
  19. FY2020Decrease in contracted units, increase in delivered unitsAnnual report

    「Against this backdrop, during the current period we launched 4 newly built condominiums comprising 133 units and contracted 164 units, including 1 existing property, completed inventory and properties scheduled for completion in the following period (243 units in the previous period). We also delivered 220 units, including completed inventory (199 units in the previous period).」

    We launched 4 newly built condominiums comprising 133 units. Contracted units decreased to 164 from 243 in the previous period, while deliveries increased from 199 to 220 units.
  20. FY2020-Q3Decrease in contracted units, increase in delivered unitsAnnual report

    「Against this backdrop, during the current period we launched 3 newly built condominiums comprising 103 units and contracted 125 units, including completed inventory, existing properties and properties launched for sale in the previous period (172 units in the previous period). Deliveries comprised 152 units, including completed inventory, existing properties and newly completed properties (88 units in the previous period).」

    We launched 3 newly built condominiums comprising 103 units. Contracted units decreased to 125 from 172 in the same period of the previous year, while deliveries increased from 88 to 152 units.
  21. FY2020-Q2Decrease in contracted units, increase in delivered unitsAnnual report

    「Against this backdrop, during the current period we launched 2 newly built condominiums comprising 83 units and contracted 89 units, including completed inventory, existing properties and properties launched for sale in the previous period (96 units in the previous period). Deliveries comprised 135 units, including completed inventory, existing properties and newly completed properties (82 units in the previous period).」

    We launched 2 newly built condominiums comprising 83 units. Contracted units decreased to 89 from 96 in the same period of the previous year, while deliveries increased from 82 to 135 units.
  22. FY2020-Q1AdvancedAnnual report

    「Against this backdrop, during the current period we launched 1 newly built condominium comprising 40 units and contracted 51 units, including completed inventory and properties launched for sale in the previous period (44 units in the previous period). Deliveries comprised 79 units of completed inventory and newly completed properties (7 units of completed inventory in the previous period, when no newly completed properties were available during the first quarter).」

    We launched 1 newly built condominium comprising 40 units, and contracted units totaled 51, up from 44 in the same period of the previous year. Deliveries, including completed inventory and newly completed properties, also totaled 79 units, up from 7 units in the same period of the previous year.
  23. FY2019AdvancedAnnual report

    「Against this backdrop, during the current period we launched 9 newly built condominiums comprising 288 units and contracted 243 units, including completed inventory and properties scheduled for completion in the following period (163 units in the previous period). We also delivered 199 units, including completed inventory (178 units in the previous period).」

    Newly built condominium launches totaled 9 properties and 288 units, while contracted units totaled 243, up from 163 in the previous period. Deliveries also increased to 199 units.
  24. FY2019-Q3Increase in properties launched and contracted units, decrease in deliveriesAnnual report

    「Against this backdrop, during the current period we launched 7 newly built condominiums comprising 233 units and contracted 172 units, including completed inventory and properties launched for sale in the previous period (126 units in the previous period). In addition, we contracted 1 existing property. Deliveries comprised 88 units, including 1 existing property, 2 newly completed properties and completed inventory (126 units in the previous period, including newly completed properties).」

    We launched 7 newly built condominiums comprising 233 units, and contracted units totaled 172, up from 126 in the same period of the previous year. Deliveries, however, totaled 88 units, below 126 units in the same period of the previous year.
  25. FY2019-Q2Increase in contracted units, decrease in delivered unitsAnnual report

    「Against this backdrop, during the current period we launched 4 newly built condominiums comprising 128 units and contracted 96 units, including completed inventory and properties launched for sale in the previous period (93 units in the previous period). Deliveries comprised 82 units from 2 newly completed properties and completed inventory (104 units in the previous period, including newly completed properties).」

    We launched 4 newly built condominiums comprising 128 units, and contracted units increased to 96 from 93 in the same period of the previous year. Deliveries, however, decreased to 82 units from 104.
  26. FY2019-Q1Decrease in newly built condominium launches and contracts, sharp decrease in deliveriesAnnual report

    「Against this backdrop, during the current period we launched 2 newly built condominiums comprising 48 units and contracted 44 units, including completed inventory and properties launched for sale in the previous period (45 units in the previous period). As no properties were completed during the first quarter of the current period, deliveries totaled 7 units of completed inventory (51 units in the previous period, including newly completed properties).」

    We launched 2 newly built condominiums comprising 48 units, and contracted units totaled 44, below the 45 units in the same period of the previous year. As there were no newly completed properties, deliveries were limited to 7 units of completed inventory, down from 51 units in the same period of the previous year.
  27. FY2018Decrease in contracted units, increase in delivered unitsAnnual report

    「Against this backdrop, during the current period we launched 5 newly built condominiums comprising 210 units and contracted 163 units, including completed inventory and properties scheduled for completion in the following period (204 units in the previous period). We also delivered 178 units, including completed inventory (146 units in the previous period).」

    During the current period, we launched 5 newly built properties comprising 210 units. Contracted units totaled 163, below the 204 units in the previous period, while deliveries totaled 178 units, above the 146 units in the previous period.
  28. FY2018-Q3AdvancedAnnual report

    「Against this backdrop, we contracted 126 units, including 6 newly built properties and completed inventory. We delivered a total of 126 units, comprising 44 units in properties completed in June for which all units had been contracted during the previous period, 9 units of completed inventory, all 51 units in 2 properties completed in September, and all 22 units in 1 property completed in December.」

    The newly built properties covered by contracts increased from 5 properties and 93 units in the second quarter to 6 properties and 126 units, while deliveries also advanced from 104 to 126 units.
  29. FY2018-Q2AdvancedAnnual report

    「Under these conditions, the company contracted 93 homes, including 5 newly launched developments and completed-home inventory. It also delivered a total of 104 homes: 44 homes in a June-completed development for which all homes had been contracted during the previous fiscal year, 9 homes from completed-home inventory, and all 51 homes in 2 developments completed in September.」

    We contracted 93 units, including 5 newly built properties and completed inventory, and delivered 104 units comprising properties completed in June, completed inventory and properties completed in September.
  30. FY2018-Q1AdvancedAnnual report

    「Under these conditions, the company newly launched 3 developments and contracted 45 homes, including completed-home inventory. It also delivered 51 homes: 44 homes in a June-completed development for which all homes had been contracted during the previous fiscal year, and 7 homes from completed-home inventory.」

    We newly launched 3 properties, contracted 45 units, and delivered 51 units, including completed properties and completed inventory. The results for launches, contracts and deliveries are stated in comparison with the first quarter of the previous year.
  31. FY2017AdvancedAnnual report

    「Under these conditions, during the current fiscal year the company launched 55 homes in 2 developments completed in the first half, 90 homes in 3 developments completed in the second half, and 128 homes in 3 developments scheduled for completion in the next fiscal year. Including 1 property that remained uncontracted at the end of the previous fiscal year, it contracted 204 homes, compared with 132 homes in the same period of the previous year, and delivered 146 homes.」

    We continued launching properties scheduled for completion in the current and following periods. Contracted units increased from 170 in the cumulative first nine months to 204, while delivered units increased from 56 to 146.
  32. FY2017-Q3AdvancedAnnual report

    「Against this backdrop, during the cumulative first nine months of the current period, we launched 2 properties comprising 55 units scheduled for completion in the first half, 3 properties comprising 90 units scheduled for completion in the second half, and 2 properties comprising 102 units scheduled for completion in the following period. Including 1 unit that remained uncontracted at the end of the previous period, we contracted 170 units (97 units were contracted in the same quarter of the previous year) and delivered 56 units.」

    We continued launching properties scheduled for completion in the current and following periods, and contracted units increased from 118 in the cumulative first half to 170. We also delivered 56 units.
  33. FY2017-Q2AdvancedAnnual report

    「Against this backdrop, during the cumulative first half of the current period, we launched 2 properties comprising 55 units scheduled for completion in the first half, 3 properties comprising 90 units scheduled for completion in the second half, and 1 property comprising 44 units scheduled for completion in the following period. Including 1 unit that remained uncontracted at the end of the previous period, we contracted 118 units (59 units were contracted in the same quarter of the previous year).」

    We launched properties scheduled for completion in the first and second halves and in the following period, bringing contracted units, including properties uncontracted at the end of the previous period, to 118. This represents progress from 38 units as of the first quarter.
  34. FY2017-Q1First statedAnnual report

    「In addition, we launched 2 of the 5 condominiums scheduled for completion in the current period (27 units in Gifu, Gifu Prefecture, and 28 units in Ginan, Hashima District, Gifu Prefecture) and 1 condominium scheduled for completion in the following period (44 units in Nishi Ward, Nagoya), bringing the number of contracted units to 38 by the end of the first quarter.」

    We launched 2 of the 5 properties scheduled for completion in the current period and 1 property scheduled for completion in the following period, with 38 units contracted by the end of the first quarter.
Moved together

"Operating Scale of Condominium Management and Repair-Related Services" moved the same way as this thread, in the same document, in 12 of its 36 moves.

1265432★123456
  1. ★This thread
  2. 1Operating Scale of Condominium Management and Repair-Related Services12×
  3. 2Handover of New-Build and Major Renovation Projects6×
  4. 3Clearing Completed Inventory5×
  5. 4Dividends on Common Shares4×
  6. 5Expansion of the Detached Housing and Kanto Businesses through the Acquisition of TAKI HOUSE as a Subsidiary3×
  7. 6Quarterly Loss-Making Results2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Amg Holdings yet. It last moved in the Earnings of 2026-08-07: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.