Accidents, Delays and Cost Increases in Outsourced Construction Projects

First written in FY2016. 8 of 13 entries say "Restated". Latest entry: FY2025.

13entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2019 – FY2020RestatedFY2022-Q3 – FY20252016: 120162017: 120172018: 120182019: 120192020: 220202021: 320212022: 220222023: 020232024: 120242025: 12025
Same theme, other companies

The whole theme swung hardest in 2026: 14 of 59 companies on the "Worse" side.

84 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 140 companies compared. The sentences above are computed from all 140.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「As these measures, to maintain quality and prevent construction delays, our design office conducts regular site supervision, holds regular meetings with contractors as needed, and reviews construction drawings and construction schedules in an effort to identify risks promptly and appropriately.」

    The risks of accidents, insolvency, breaches, delays and cost increases related to outsourced construction, and the measures addressing them through site supervision by the design office, regular meetings, reviews of construction drawings and schedules, and contractor diversification, have been reconfirmed.
  2. FY2024RestatedAnnual report

    「As these measures, to maintain quality and prevent construction delays, our design office conducts regular site supervision, holds regular meetings with contractors as needed, and reviews construction drawings and construction schedules in an effort to identify risks promptly and appropriately.」

    The response to construction risks through site supervision by the design office, regular meetings with contractors, reviews of construction drawings and schedules, and contractor diversification has been reconfirmed.
  3. FY2022RestatedAnnual report

    「As these measures, to maintain quality and prevent construction delays, our design office conducts regular site supervision, holds regular meetings with contractors as needed, and reviews construction drawings and construction schedules in an effort to identify risks promptly and appropriately.」

    The response to outsourced construction risks through site supervision by the design office, regular meetings with contractors, and reviews of construction drawings and schedules has been reconfirmed.
  4. FY2022-Q3RestatedAnnual report

    「In construction, we have implemented strict construction management by staff at our design office and worked to prevent extensions of construction periods.」

    Measures to prevent extensions of outsourced construction periods through strict construction management by staff at the in-house design office are continuing.
  5. FY2022-Q2MitigatedAnnual report

    「In construction, we have implemented strict construction management by staff at our design office and worked to prevent extensions of construction periods.」

    Strict construction management by staff at the in-house design office is being implemented, and efforts to prevent extensions of construction periods are continuing. It is also stated that no construction delays occurred during the cumulative period of the second quarter under review.
  6. FY2022-Q1RestatedAnnual report

    「In construction, we have implemented strict construction management by staff at our design office and worked to prevent extensions of construction periods.」

    Measures to prevent delays in outsourced construction periods through strict construction management by staff at the in-house design office have been reconfirmed.
  7. FY2021-Q3RestatedAnnual report

    「For construction work, we have implemented strict construction management by staff at our in-house design office and worked to prevent construction delays.」

    Measures to prevent construction delays through strict construction management by staff at the in-house design office have been reconfirmed.
  8. FY2021-Q2MitigatedAnnual report

    「For construction work, we have implemented strict construction management by staff at our in-house design office and worked to prevent construction delays.」

    Strict construction management by staff at the in-house design office is being implemented, and measures to address delays in outsourced construction projects are continuing.
  9. FY2020RestatedAnnual report

    「Because the Group outsources much of its construction work, accidents during construction, contractor insolvency, breaches of construction contracts and other unforeseen events could result in the suspension or delay of construction, increases in construction costs and other consequences.」

    The risks of accidents, contractor insolvency or breach, construction delays and increases in construction costs related to outsourced construction have been reconfirmed.
  10. FY2019RestatedAnnual report

    「However, if an accident occurs during construction, a contractor becomes insolvent, a construction contract is breached, or any other unforeseen event occurs, the Group's performance could be affected by the suspension or delay of construction, increases in construction costs and other factors. In addition, if the construction plan itself is delayed because of external factors such as the tightening of building confirmation reviews following amendments to the Building Standards Act, the Group's performance could be affected.」

    The risks of accidents, contractor breaches, delays and cost increases in outsourced construction, as well as plan delays caused by tighter building confirmation reviews, have been reconfirmed.
  11. FY2018WorsenedAnnual report

    「Contractors are selected after considering quality, construction periods and costs, among other factors, and efforts are made to avoid dependence on any particular contractor. To maintain quality and prevent delays, the Group's design office conducts regular site supervision, holds regular meetings with contractors as needed, and reviews construction drawings and construction schedules. However, if an accident occurs during construction, a contractor becomes insolvent, a construction contract is breached, or any other unforeseen event occurs, the Group's performance could be affected by the suspension or delay of construction, increases in construction costs and other factors. In addition, if the construction plan itself is delayed because of external factors such as the tightening of building confirmation reviews following amendments to the Building Standards Act, the Group's performance could be affected.」

    While continuing to diversify contractors, conduct site supervision, hold regular meetings and review schedules, the risk of construction delays from new external factors, including tighter building confirmation reviews following amendments to the Building Standards Act, has been added.
  12. FY2017MitigatedAnnual report

    「The company selects outsourced contractors after considering quality, construction schedules and costs, and seeks to avoid dependence on any particular contractor. To maintain quality and prevent construction delays, the group's design office regularly supervises construction sites, holds regular meetings with outsourced contractors as needed, and checks construction drawings and construction schedules. However, if an accident occurs during construction, an outsourced contractor becomes insolvent, a construction contract is breached, or another unforeseen event occurs, the group's results may be affected by the suspension or delay of construction, increases in construction costs and other factors.」

    While the risks of accidents, contractor insolvency, delays and cost increases in outsourced construction remain, specific measures have been developed, including diversifying contractors, site supervision by the design office, regular meetings, and reviews of construction drawings and schedules.
  13. FY2016First statedAnnual report

    「However, if an accident occurs during construction, an outsourced contractor becomes insolvent, a construction contract is breached, or another unforeseen event occurs, the group's results may be affected by the suspension or delay of construction, increases in construction costs and other factors.」

    The company identifies the possibility of accidents, insolvency or breach of contract by outsourced contractors, construction delays and cost increases arising from its business model of outsourcing construction work.
Moved together

"Expansion from a Flow Business into a Stock Business" moved the same way as this thread, in the same document, in 3 of its 13 moves.

32★12
  1. ★This thread
  2. 1Expansion from a Flow Business into a Stock Business3×
  3. 2First-quarter sales growth and return to profitability2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Eslead's next results are scheduled for 2026-10-30. Read the earnings preview