Komori
Kyokuto Securities (8706) · RiskRestated

Risk of Computer System and Network Connection Disruptions

First written in FY2016. 5 of 6 entries say "Restated". Latest entry: FY2025.

6entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY20252016: 120162017: 120172018: 120182019: 120192020: 020202021: 120212022: 020222023: 020232024: 020242025: 12025
Same theme, other companies
Systems and Communications Infrastructure Failure RiskA theme 224 companies write about · 224 as a headwind · 2 as a tailwind

The whole theme swung hardest in 2026: 16 of 83 companies on the "Worse" side.

122 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 199 companies compared. The sentences above are computed from all 199.Comparing 200 of the theme's 226 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「The Group and its contractors have taken measures such as system monitoring, redundancy and backup arrangements in preparation for these system outage risks. However, if these measures are insufficient or an outage occurs on a scale exceeding expectations, losses or liability for damages may arise.」

    Reconfirms the response measures involving system monitoring, redundancy and backups, as well as the residual risk associated with outages exceeding expectations.
  2. FY2021RestatedAnnual report

    「The Group and its contractors have taken measures such as system monitoring, redundancy and backup arrangements in preparation for these system outage risks. However, if these measures are insufficient or an outage occurs on a scale exceeding expectations, losses or liability for damages may arise.」

    Describes specific measures for responding to outages through system monitoring, redundancy and backups, while reconfirming the residual risk.
  3. FY2019RestatedAnnual report

    「If computer systems or networks used in the Group's operations, whether operated by the Group or its contractors, experience failures due to poor quality, unauthorized external access, disasters, power outages or other factors, the impact on the Group's operations may depend on the scale of the failure and may affect its operating results and financial position.」

    Reiterates the risk of failures in the Group's and its contractors' systems and networks due to poor quality, unauthorized access, disasters or power outages.
  4. FY2018RestatedAnnual report

    「If computer systems or networks used in the Group's operations, whether operated by the Group or its contractors, experience failures due to poor quality, unauthorized external access, disasters, power outages or other factors, the impact on the Group's operations may depend on the scale of the failure and may affect its operating results and financial position.」

    Reiterates the risk of failures in the Group's and its contractors' systems and networks due to poor quality, unauthorized access, disasters or power outages.
  5. FY2017RestatedAnnual report

    「If computer systems or networks used in the Group's operations, whether operated by the Group or its contractors, experience failures due to poor quality, unauthorized external access, disasters, power outages or other factors, the impact on the Group's operations may depend on the scale of the failure and may affect its operating results and financial position.」

    Reiterates the risk of failures in the Group's and its contractors' systems and networks due to poor quality, unauthorized access, disasters or power outages.
  6. FY2016First statedAnnual report

    「If computer systems or networks used in the Group's operations, whether operated by the Group or its contractors, experience failures due to poor quality, unauthorized external access, disasters, power outages or other factors, the impact on the Group's operations may depend on the scale of the failure and may affect its operating results and financial position.」

    Indicates the risk of business interruption caused by poor quality, unauthorized access, disasters or power outages affecting the Group's or its contractors' systems and networks.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Kyokuto Securities's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Computer System and Network Connection Disruptions | KYOKUTO SECURITIES CO.,LTD. (8706) | Komori