Growth and Monetization of the Biomass Gasification Power Generation Business
First written in FY2016. 7 of 19 entries say "Worsened", first in FY2017-Q2. Latest entry: FY2022.
No other company in this theme has enough history to compare yet.
- FY2022DroppedAnnual report
「In addition, with the liquidation of the overseas subsidiary PJB completed in April 2022, we were able to substantially complete during the current consolidated fiscal year the restructuring of unprofitable businesses in which we had invested in the past without producing results, an initiative pursued since the previous consolidated fiscal year. These businesses included the renewable energy-related business operated by ZEエナジー, the overseas financial instruments trading business operated by PJB, and overseas investment projects of Traders Investment, among others.」
The company moved from treating the biomass business as a growth and earnings pillar within the group to restructuring unprofitable businesses, and stated that this restructuring was nearly complete. - FY2022-Q3RestatedAnnual report
「At a meeting of the Board of Directors held on 13 July 2021, we resolved to transfer all shares in ZEエナジー, an equity-method affiliate, and carried out the share transfer on the same date. As a result, ZEエナジー has been removed from the scope of application of the equity method.」
The transfer of all shares in ZEエナジー and its removal from the scope of the equity method continue to be confirmed in the business description and notes. - FY2022-Q1ReframedAnnual report
「At a meeting of the Board of Directors held on 13 July 2021, we resolved to transfer all shares in ZEエナジー, an equity-method affiliate, and to waive the receivable, and carried out the share transfer and debt waiver on the same date. As a result, ZEエナジー was removed from the scope of application of the equity method.」
The former group initiative to grow and monetise the biomass business was restructured through the transfer of all shares in ZEエナジー and its removal from the scope of the equity method, with improvement of the company's business entrusted to external parties. - FY2021-Q3RestatedAnnual report
「From the first quarter of the current fiscal year, figures relating to the renewable energy-related business have been presented under "Other" in the segment information.」
Following the removal of ZEエナジー from the scope of consolidation, the renewable energy-related business has continued to be included under "Other" rather than treated as a standalone segment. - FY2021-Q1SoftenedAnnual report
「However, the woody biomass gasification power generation systems delivered had not reached profitable operation and remained under improvement. Accordingly, we determined that accepting external funding, whose collaboration effects were expected, to establish a new management structure aimed at further growth of ZEエナジー and technological improvement, while allocating more management resources to the growing FX business and financial systems development business, would contribute to increasing the corporate value of the group as a whole. We therefore resolved to transfer part of the shares.」
Against the backdrop of the biomass power generation systems still not achieving profitable operation and remaining under improvement, part of ZEエナジー was transferred to introduce external funding and a new management structure, while resource allocation within the group shifted toward the FX and financial systems development businesses. - FY2020-Q3Revenue up and losses narrowed, but target power output not achievedAnnual report
「Meanwhile, the renewable energy-related business operated by the subsidiary ZEエナジー continued improvement work on the woody biomass gasification power generation system at the Mogamimachi Satoyama Power Plant so that it could generate electricity at a level sufficient to secure profitability, but the target power output was not achieved. However, operating revenue for the cumulative third quarter increased to ¥99.470 million, up ¥89.754 million, or 923.8%, year on year, due to sales of carbonisation equipment and other products.」
Improvement work continues at the Mogamimachi Satoyama Power Plant, but the target power output has not been achieved. Meanwhile, operating revenue from the renewable energy-related business increased substantially due to sales of carbonisation equipment and other products. - FY2020-Q2WorsenedAnnual report
「We continued improvement work on the woody biomass gasification power generation system at the Mogamimachi Satoyama Power Plant so that it could generate electricity at a level sufficient to secure profitability, but the target power output was not achieved. In addition, delivery and sales of the carbonisation equipment had been scheduled for the cumulative second quarter, but delivery was delayed until October 2019」
Although improvement work continues, the target power output was not achieved, and delivery and sales of the carbonisation equipment were delayed from the scheduled period to October 2019. Profitability and revenue recovery in the biomass business have still not been achieved. - FY2020-Q1Profitability still not achieved; focus shifting to mid-sized projectsAnnual report
「The renewable energy-related business operated by the subsidiary ZEエナジー continued to focus on operating adjustments and improvement work aimed at achieving stable operation of the woody biomass gasification power generation system at the Mogamimachi Satoyama Power Plant, as electricity sales had still not reached a level sufficient to secure profitability. As a result, operating revenue from external customers for the cumulative first quarter was limited to ¥3.538 million, an increase of ¥0.937 million, or 36.0%, year on year. Although no large-scale orders for woody biomass gasification power generation systems or other equipment were won during the period, the company also focused on winning orders for mid-sized projects involving carbonisation equipment and worked to restore revenue.」
The Mogamimachi Satoyama Power Plant has still not reached a level sufficient to secure profitability, and operating adjustments and improvement work toward stable operation continue. No large-scale orders were received, and efforts are being expanded to restore revenue by winning orders for mid-sized projects involving carbonisation equipment and other products. - FY2019-Q3AdvancedAnnual report
「With regard to securing dried wood chips with the low moisture content required for electricity sales, an installation project is under way for a new, high-capacity wood-chip dryer. As for current power generation, electricity is being sold intermittently when dried wood chips with a low moisture content are available, but sales volumes remain minimal.」
Installation of a new wood-chip dryer is under way to enable continuous operation of the Mogamimachi Satoyama Power Plant. However, electricity sales remain intermittent and volumes remain minimal. - FY2019-Q2WorsenedAnnual report
「Electricity sales from the Mogamimachi Satoyama Power Plant to the power company began in July 2017, but the plant has not yet achieved continuous operation on a profitable basis. Work is therefore proceeding to resolve, one by one, the issues that must be addressed for continuous operation. One particularly important issue was securing dried wood chips with a low moisture content, as required for electricity sales. To address this issue, construction of a new, higher-capacity wood-chip dryer is scheduled to begin in October 2018.」
The Mogamimachi Satoyama Power Plant has still not achieved continuous operation on a profitable basis, and securing dried wood chips remains an unresolved issue. Although a plan to install a new dryer has been presented, full-scale operation and monetisation have not yet been achieved. - FY2019-Q1WorsenedAnnual report
「At Mogamimachi Satoyama Power Plant, electricity sales to the power company began in July 2017. We are focusing on improving the processing method for woody chips and installing new dryers so that sufficient quantities of woody chips with low moisture content can be secured for continuous operation. Regarding current power generation, electricity is being sold intermittently when woody chips with low moisture content are available. During the six months ended the first quarter, no new orders were received because work on the existing projects above was ongoing, and completed construction revenue remained at ¥2.415 million, down ¥25.563 million, or 91.4%, year on year.」
The Mogamimachi Satoyama Power Plant has been unable to secure sufficient wood chips for continuous operation and is selling electricity intermittently while working on improvements and installing a dryer. Existing projects remain ongoing, with no new orders received, and completed construction revenue fell 91.4% year on year. - FY2018-Q3WorsenedAnnual report
「During the nine months ended the third quarter, no new orders were received because work on each of the existing projects above was ongoing, and completed construction revenue remained at ¥51.999 million, down ¥552.298 million, or 91.4%, year on year.」
Operational adjustments and modifications to existing projects continued, no new orders were received, and completed construction revenue fell 91.4% year on year. - FY2018-Q2SoftenedAnnual report
「Construction of company-owned power plants, which had been planned to be funded by proceeds from the exercise of these stock acquisition rights, will be put on hold for the time being due to the change in the intended use of the funds. However, because power generation using woody biomass power generation equipment with a capacity of less than 2,000 kW qualifies for a feed-in tariff of ¥40 per 1 kWh, higher than the purchase prices for other renewable energy sources such as solar power, it is a business capable of securing stable profits over the long term. We therefore plan to revise and implement the plan again once our cash flow position improves.」
The company has changed its policy to put the construction plan for company-owned power plants on hold for the time being and revise the plan after its cash flow position improves. - FY2018-Q1WorsenedAnnual report
「For Azumino Biomass Energy Center among the projects above, we received notice of contract termination from the ordering party, AIR WATER INC., on 31 July and are currently removing the woody biomass gasification power generation equipment at the site for reuse in the next project. At Mogamimachi Satoyama Power Plant, electricity sales to the power company began on 18 July.」
The contract for Azumino Biomass Energy Center was terminated, and the project moved to equipment removal and reuse. Meanwhile, Mogamimachi Satoyama Power Plant began selling electricity. - FY2017WorsenedAnnual report
「Additional improvement work and adjustment operations are being carried out at each of these three woody biomass gasification power generation equipment sites, but none has yet reached completion and handover.」
The three power generation facilities had still not reached completion and handover, and the company explicitly disclosed prolonged responses to technical issues and delivery delays. Meanwhile, all were scheduled for completion and handover during the second quarter of the fiscal year ending March 2018. - FY2017-Q3AdvancedAnnual report
「At Kabuchan-mura Mori Power Plant and Azumino Biomass Energy Center, we are currently selling electricity generated by woody biomass gasification power generation equipment on an ongoing basis while carrying out partial modifications and commissioning adjustments, with the customers' consent, to maximize and stabilize output. At Mogamimachi Satoyama Power Plant, the woody biomass gasification power generation equipment was connected to the power grid in January, and electricity sales are scheduled to begin after customer acceptance.」
At two power plants, ongoing electricity sales, modifications and commissioning adjustments are being conducted to maximize output, while Mogamimachi Satoyama Power Plant completed grid interconnection in January. - FY2017-Q2WorsenedAnnual report
「Delays in delivery of the woody biomass gasification power generation equipment at Kabuchan-mura Mori Power Plant and Azumino Biomass Energy Center, which had been scheduled for completion and handover by the end of the second quarter of the current consolidated fiscal year, as well as the resulting delay in the construction period for the equipment at Mogamimachi Satoyama Power Plant, caused completed construction revenue to remain at ¥495.273 million.」
Following the first-quarter delays, delays in delivery and construction periods at multiple power plants were disclosed. Completed construction revenue remained at ¥495.273 million, and segment loss for the renewable energy business was ¥265.351 million. - FY2017-Q1Delivery delaysAnnual report
「Because delivery of the biomass gasification power generation plant (1,900 kW), scheduled for completion and handover by the end of the first quarter of the current consolidated fiscal year, was pushed back to the second quarter, completed construction revenue was limited to ¥211.763 million, below the forecast.」
Completion and handover of the 1,900 kW plant was pushed back from the first quarter to the second quarter, falling below the initial forecast. - FY2016First statedAnnual report
「In the next fiscal year, we expect ZE Energy's biomass gasification power generation plant business, which became a subsidiary during the current consolidated fiscal year, to enter a full-scale growth phase as the Group's second earnings pillar and contribute to consolidated results.」
The company aims to develop ZE Energy as its second earnings pillar, expand orders, improve productivity, roll out company-owned facilities nationwide, and stabilize earnings through electricity sales.