Results for this period
First quarter1 April 2026 to 30 June 2026ConsolidatedJapanese GAAPThe width of the band at each stage is based on revenue. The narrower it becomes toward the bottom, the smaller the proportion of revenue that remains as profit. The dotted outline is the full-year forecast and the band inside it is the result for this period. The progress rate is the result divided by the forecast.
塗りつぶした部分が自己資本比率です。総資産のうち、返済のいらない自前の資金がどれだけかを表します。The thin vertical line indicates the level at the end of the previous fiscal year.
System Solutions benefited from a large network system project for a university carried over from the previous fiscal year, subscriptions for 3D CAD software, and products for low-Earth-orbit satellite manufacturers. Network Solutions was affected by a decline in video distribution system projects, delays in introducing replacement products for 4.9 GHz band products, and the reaction to large J-Alert-related deliveries in the same period of the previous fiscal year, resulting in lower sales and a wider operating loss. Electronic Components and Equipment benefited from the earlier-than-scheduled delivery of aircraft components for the Ministry of Defense, a recovery in semiconductor demand, and new orders for components installed on low-Earth-orbit satellites.
No applicable matters
| Item | Details |
|---|---|
| Fiscal Period Classification | First quarter |
| Accounting standards | Japanese GAAP |
| Consolidated / non-consolidated | Consolidated |
| Period Covered | 1 April 2026 to 30 June 2026 |
| Net Sales | ¥7,195 million (YoY +16.7%) |
| Operating profit | ¥252 million (YoY +6.7%) |
| Ordinary income | ¥260 million (YoY +10.3%) |
| Profit attributable to owners of the parent | ¥81 million (YoY -1.5%) |
| Net income per share | 5.41 |
| Equity ratio | End of the current fiscal period 43.4 / End of previous period 46.5 |
| Total assets | ¥13,812 million |
| Net assets | ¥6,032 million |
| Full-year earnings forecast | Net Sales ¥18,900 million (YoY -3.3%) / Operating profit ¥740 million (YoY -40.2%) / Ordinary income ¥700 million (YoY -35.1%) / Profit attributable to owners of the parent ¥420 million (YoY -43.7%) |
| Revision to Earnings Forecast | Not disclosed → Net Sales 9,900 / Operating profit 200 / Ordinary income 200 / Profit attributable to owners of the parent 65 |
| Annual Dividend Forecast | ¥7 → ¥7(0.0%) |
| Segment revenue | System Solutions ¥650,750 thousand (YoY +5.2%), Network Solutions ¥227,867 thousand (YoY -26.8%), Electronic Components and Equipment ¥6,316,877 thousand (YoY +20.7%) |
| Segment profit | System Solutions ¥-66,212 thousand, Network Solutions ¥-75,490 thousand, Electronic Components and Equipment ¥393,888 thousand (YoY +16.0%) |
| Depreciation and amortization | ¥10,784 thousand |
| Disclosure regarding the going concern assumption | No applicable matters |
| Change in accounting policy | Changes due to revisions to standards No / Other changes No / Change in accounting estimate No / Restatement No |
| Changes in the scope of consolidation | Added: 0 companies; excluded: 0 companies |
| Availability of Supplementary Financial Results Materials | Yes |
| Availability of Financial Results Briefing | No |
| Issued Shares at Period-End | 15,514,721 |
| Treasury Shares at Period-End | 395,348 |
| Factors Behind Changes in Business Performance | System Solutions benefited from a large network system project for a university carried over from the previous fiscal year, subscriptions for 3D CAD software, and products for low-Earth-orbit satellite manufacturers. Network Solutions was affected by a decline in video distribution system projects, delays in introducing replacement products for 4.9 GHz band products, and the reaction to large J-Alert-related deliveries in the same period of the previous fiscal year, resulting in lower sales and a wider operating loss. Electronic Components and Equipment benefited from the earlier-than-scheduled delivery of aircraft components for the Ministry of Defense, a recovery in semiconductor demand, and new orders for components installed on low-Earth-orbit satellites. |
Items this document does not state (12)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.In System Solutions, results were supported by a large network system project for a university carried over from the previous fiscal year, subscriptions for 3D CAD software, and products for low-Earth-orbit satellite manufacturers. In Electronic Components and Equipment, contributions came from the earlier-than-scheduled delivery of aircraft components for the Ministry of Defense, a recovery in semiconductor demand, and new orders for components installed on low-Earth-orbit satellites. In Network Solutions, however, lower sales of video distribution system projects, delays in launching replacement products following the discontinuation of 4.9 GHz band products, and the reaction to large J-Alert-related deliveries in the same period of the previous fiscal year resulted in lower sales and a wider operating loss. The reason given for revising the forecast for the six months ending September 2026 was recent business performance trends.