Komori
GSI Creos (8101) · RiskMaterialised

Risk of Production Shutdowns Due to Factory Equipment Problems

First written in FY2027-H1. 1 of 1 entries say "Materialised", first in FY2027-H1. Latest entry: FY2027-H1.

1entries
1years
0from disclosures
Share on X
How it moved
Same theme, other companies
Risk of production delays or stoppages caused by manufacturing equipment failuresA theme 45 companies write about · 46 as a headwind · 0 as a tailwind

GSI Creos moved to the "Worse" side of this theme in 2026, 5 years after the typical company in this theme (2021).

The whole theme swung hardest in 2021: 5 of 13 companies on the "Worse" side.

5 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 45 companies compared. The sentences above are computed from all 45.