Results for this period
Third quarter1 November 2025 to 31 July 2026ConsolidatedJapanese GAAPThe width of the band at each stage is based on revenue. The narrower it becomes toward the bottom, the smaller the proportion of revenue that remains as profit. The dotted outline is the full-year forecast and the band inside it is the result for this period. The progress rate is the result divided by the forecast.
塗りつぶした部分が自己資本比率です。総資産のうち、返済のいらない自前の資金がどれだけかを表します。The thin vertical line indicates the level at the end of the previous fiscal year.
Construction starts for small and medium-sized projects stalled, construction sites shut down during the summer because of record heat, construction material and labor costs remained elevated, and skilled labor shortages persisted. As a result, construction starts and progress at construction sites, as well as orders and demand, remained weak.
Not applicable.
| Item | Details |
|---|---|
| Fiscal Period Classification | Third quarter |
| Accounting standards | Japanese GAAP |
| Consolidated / non-consolidated | Consolidated |
| Period Covered | 1 November 2025 to 31 July 2026 |
| Net Sales | ¥16,272 million (YoY -5.2%) |
| Operating profit | ¥514 million (YoY -41.1%) |
| Ordinary income | ¥609 million (YoY -33.6%) |
| Profit attributable to owners of the parent | ¥386 million (YoY -36.5%) |
| Net income per share | ¥17.09 |
| Equity ratio | End of the current fiscal period 42.5 / End of previous period 42 |
| Total assets | ¥34,146 million |
| Net assets | ¥14,508 million |
| Cash and cash equivalents at end of period | ¥3,427,452 thousand |
| Full-year earnings forecast | Net Sales ¥21,000 million (YoY -6.8%) / Operating profit ¥650 million (YoY -35.6%) / Ordinary income ¥950 million (YoY -25.7%) / Net income ¥550 million (YoY -39.2%) |
| Annual Dividend Forecast | ¥6 → ¥6(0.0%) |
| Depreciation and amortization | ¥288,409 thousand |
| Breakdown of extraordinary income (loss) | Extraordinary income None / Extraordinary loss None |
| Disclosure regarding the going concern assumption | Not applicable. |
| Change in accounting policy | Changes due to revisions to standards No / Other changes No / Change in accounting estimate No / Restatement No |
| Changes in the scope of consolidation | New 0 / Excluded 0 / Company name None |
| Availability of Supplementary Financial Results Materials | No |
| Availability of Financial Results Briefing | No (no eligible attendees) |
| Issued Shares at Period-End | 26,007,448 shares |
| Treasury Shares at Period-End | 3,391,543 shares |
| Factors Behind Changes in Business Performance | Construction starts for small and medium-sized projects stalled, construction sites shut down during the summer because of record heat, construction material and labor costs remained elevated, and skilled labor shortages persisted. As a result, construction starts and progress at construction sites, as well as orders and demand, remained weak. |
Items this document does not state (13)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.Construction starts for small and medium-sized projects stalled, construction sites shut down during the summer because of record heat, construction material and labor costs remained elevated, and skilled labor shortages persisted. As a result, construction starts and progress at construction sites, as well as orders and demand, remained weak. The Company also said it was working to improve productivity through digitalization, build up inventory by adding new items, and maintain gross profit by communicating price revisions to customers.