Uncertainty in revenue and cost estimates under the percentage-of-completion method

First written in FY2020. 8 of 15 entries say "Restated". Latest entry: 2026-11-13.

15entries
7years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2020 – FY2022-Q3RestatedFY2023-Q2 – FY2024-Q1WorsenedFY2024-Q2 – 2026-11-132020: 320202021: 120212022: 320222023: 320232024: 320242025: 020252026: 22026
Same theme, other companies
Uncertainty in Cost and Progress Estimates for Construction Revenue RecognitionA theme 127 companies write about · 124 as a headwind · 2 as a tailwind

Tokyo Sangyo moved to the "Worse" side of this theme in 2024, 1 year before the typical company in this theme (2025).

The whole theme swung hardest in 2022: 10 of 87 companies on the "Worse" side.

3 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 127 companies compared. The sentences above are computed from all 127.
Full recordFilings, disclosures and news, newest first
  1. 2026-11-13MaterialisedResults

    「当社は、案件1の事業環境、A社との協議状況および今後発生が見込まれる費用等を総合的に勘案した結果、債権回収不能見込額の全額に相当する3,123百万円を貸倒引当金繰入額として特別損失に、今後発生が見込まれる不可避的な費用等1,313百万円を工事損失引当金繰入額として売上原価に、それぞれ計上いたしました。」

    再生可能エネルギー発電所建設工事に関する回収不能見込みと将来費用が、貸倒引当金および工事損失引当金として実際に計上された。案件2についても工事損失引当金960百万円を計上し、案件3では保証履行請求を受け719百万円の保証履行損失を計上している。
  2. FY2027-H1MaterialisedAnnual report

    「Questions have been raised regarding the permits for this project, creating material uncertainty regarding the business plan. ... For Project 2, the financial position of the Company's customer (hereinafter, “Company B”) has deteriorated significantly, increasing the likelihood that it may be unable to bear costs that Company B should originally bear.」

    For renewable energy power plant construction projects, questions regarding permits, material uncertainty regarding the business plans, and the possibility of additional cost burdens due to the deteriorating financial position of customers have become concrete issues.
  3. FY2024WorsenedAnnual report

    「Revenue from construction projects for which revenue is recognized over time as performance obligations are satisfied is calculated based on the progress toward satisfying the performance obligations. The percentage of completion is measured based on the proportion of construction costs incurred by the end of each reporting period to the expected total contract costs. Estimating total contract costs involves a degree of uncertainty, including whether all work required for completion has been identified, whether the construction cost estimates are based on reasonable grounds, and whether changes in the assumptions underlying the estimates resulting from changes in conditions after construction begins, such as soaring raw-material prices and specification changes, are reflected in the estimated total contract costs in a timely manner.」

    The company provides detailed disclosure of the uncertainty involved in estimating total contract costs, including identifying additional work, establishing reasonable grounds for the estimates, and reflecting soaring raw-material prices and specification changes in a timely manner.
  4. FY2024-Q3WorsenedAnnual report

    「Following this additional matter, the company determined that there may be issues because the additional construction costs that should have been included in total contract costs, the basis for calculating the percentage of completion, had not been compiled and estimated in a timely and appropriate manner, and revenue, cost of revenue, provisions for construction losses and other items may not have been recognized in a timely and appropriate manner. The company decided on 15 January 2024 to commission the external investigation committee to conduct an additional investigation, and the investigation is currently continuing.」

    Regarding the solar power construction project, concerns arose that additional construction costs had not been compiled and estimated, and revenue, costs and provisions for construction losses had not been recognized, in a timely and appropriate manner. The external investigation committee's additional investigation is continuing. The company also recognized an allowance for doubtful accounts of ¥3,714 million against advances of ¥6,538 million, as well as a provision for construction losses of ¥457 million for expected future losses.
  5. FY2024-Q2WorsenedAnnual report

    「Following this additional matter, the company determined that there may be issues because the additional construction costs that should have been included in total contract costs, the basis for calculating the percentage of completion, had not been compiled and estimated in a timely and appropriate manner, and revenue, cost of revenue, provisions for construction losses and other items may not have been recognized in a timely and appropriate manner. Because this could materially affect the accounting treatment, including account classifications, amounts and timing of recognition, as well as previously disclosed financial figures, the company decided on 15 January 2024 to commission the external investigation committee appointed to investigate the initial matter to conduct an additional investigation into the facts relating to the construction project, whether similar construction projects with the same potential problems exist, and the impact on the company's financial statements and other matters. The investigation has now begun.」

    Regarding the solar power construction project, concerns arose that additional construction costs had not been compiled and estimated, and revenue, costs and provisions for construction losses had not been recognized, in a timely and appropriate manner. An additional investigation by the external investigation committee has begun.
  6. FY2024-Q1RestatedAnnual report

    「During the first three months of the consolidated fiscal year, there were no material changes concerning matters described in the quarterly securities report that could materially affect investors' decisions, or to the business and other risks described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates for construction projects.
  7. FY2023RestatedAnnual report

    「Revenue from construction projects for which revenue is recognized over time as performance obligations are satisfied is calculated based on the progress toward satisfying the performance obligations. The percentage of completion is measured based on the proportion of construction costs incurred by the end of each reporting period to the expected total contract costs.」

    For construction projects following the adoption of the revenue recognition accounting standard, the company continues to disclose uncertainty associated with estimates of the percentage of completion and total contract costs.
  8. FY2023-Q3RestatedAnnual report

    「During the cumulative third quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that management recognizes could materially affect the financial position, operating results and cash flows of the consolidated companies, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates under the percentage-of-completion method.
  9. FY2023-Q2RestatedAnnual report

    「During the cumulative second quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates under the percentage-of-completion method.
  10. FY2022ReframedAnnual report

    「For construction contracts involving performance obligations satisfied over time, revenue from construction projects is recognized when the outcome of the work through the relevant stage of progress can be determined with reasonable certainty. Application of this method requires reasonable estimates of total contract revenue, total contract costs and the percentage of completion at the reporting date.」

    For construction projects following the adoption of the revenue recognition accounting standard, the company organizes the issue as revenue recognition arising from satisfaction of performance obligations and uncertainty in estimating revenue, costs and the percentage of completion.
  11. FY2022-Q3RestatedAnnual report

    「During the cumulative third quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates under the percentage-of-completion method.
  12. FY2021-Q3RestatedAnnual report

    「During the cumulative third quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates under the percentage-of-completion method.
  13. FY2021-Q2RestatedAnnual report

    「During the cumulative second quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates under the percentage-of-completion method.
  14. FY2021-Q1RestatedAnnual report

    「During the first three months of the consolidated fiscal year, there were no material changes concerning matters described in the quarterly securities report that could materially affect investors' decisions, or to the business and other risks described in the securities report for the previous fiscal year.」

    The company states that there have been no material changes regarding uncertainty in revenue and cost estimates under the percentage-of-completion method.
  15. FY2020First statedAnnual report

    「In recognizing revenue under the percentage-of-completion method, estimates of total contract revenue and total contract costs are important. However, these estimates involve a degree of uncertainty, including changes in the scope of work resulting from changes in conditions after construction begins, such as soaring raw-material prices and specification changes.」

    The company states that estimates of total contract revenue, total contract costs and the percentage of completion may differ from actual results due to raw-material prices, specification changes and other factors.
Moved together

"Decline in Total Assets and Liabilities and Rise in Equity Ratio" moved the same way as this thread, in the same document, in 6 of its 15 moves.

655543★123456
  1. ★This thread
  2. 1Decline in Total Assets and Liabilities and Rise in Equity Ratio6×
  3. 2Substantial declines in revenue and profit5×
  4. 3Increase in revenue and order backlog in the Chemical Machinery-Related Division5×
  5. 4Decline in segment profit and mixed performance across divisions5×
  6. 5Collection risk arising from credit extended to business partners4×
  7. 6Continuation of Existing Business Activities3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Tokyo Sangyo yet. It last moved in the Results of 2026-11-13: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.