Toyota Tsusho (8015) · InitiativeRestatedLatest Earnings (2026-07-31): "Achieved"

100 MW Tunisia Solar Power IPP Project

First written in FY2025-H1. 1 of 3 entries say "Restated". Latest entry: 2026-07-31.

3entries
3years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2025-H1 – FY20252024: 120242025: 120252026: 12026
Same theme, other companies
Participation in a 100 MW Solar IPP Project in TunisiaA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-07-31AchievedEarnings

    「As the first investment by our Group’s AEOLUS SAS in a renewable-energy business in Africa, two solar power plants with a combined capacity of 100 MW, under construction in Tunisia, were completed and commenced commercial operations in January and March 2026, respectively.」

    The 100 MW solar IPP in Tunisia advanced from the planning stage to the completion and commencement of commercial operations at both sites.
  2. FY2025RestatedAnnual report

    「In March 2024, CFAO SAS and Eurus Energy Holdings Corporation, both wholly owned subsidiaries of the company, established the joint venture AEOLUS SAS. In August of the same year, through AEOLUS SAS, they joined an independent power producer (IPP) business for solar power plants with total capacity of 100 MW in Tunisia.」

    The annual report also confirms the establishment of AEOLUS SAS and participation in the 100 MW solar IPP business in Tunisia as a renewable energy business in Africa.
  3. FY2025-H1First statedAnnual report

    「AEOLUS SAS, established by the group to contribute to green economic development in Africa through renewable energy businesses, joined an independent power producer (IPP) business in Tunisia in August 2024 with Norway’s Scatec ASA. The business involves constructing, owning and operating solar power plants with total capacity of 100 MW and selling the electricity generated. This is the group’s first renewable energy business in Tunisia, with completion and the start of electricity sales scheduled for the second half of fiscal 2025.」

    AEOLUS SAS joined Scatec ASA in an IPP business to construct, own and operate solar power plants with total capacity of 100 MW in Tunisia. Completion and the start of electricity sales are scheduled for the second half of fiscal 2025.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Toyota Tsusho's next results are scheduled for 2026-10-29. Read the earnings preview It last moved in the Earnings of 2026-07-31: "Achieved".