Komori
Toyota Tsusho (8015) · InitiativeAdvanced

Expansion of Renewable Energy Business Facilities

First written in FY2016. 20 of 27 entries say "Advanced", first in FY2017-Q1. Latest entry: FY2026.

27entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2023AdvancedFY2025-H1 – FY20262016: 220162017: 320172018: 220182019: 220192020: 320202021: 120212022: 220222023: 520232024: 320242025: 220252026: 22026
Same theme, other companies
Expanding the Solar, Wind and Biomass Power PortfolioA theme 31 companies write about · 0 as a headwind · 38 as a tailwind

The whole theme swung hardest in 2025: 2 of 20 companies on the "Worse" side.

19 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 31 companies compared. The sentences above are computed from all 31.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「The Group will also build a “service platform for integrated control of renewable energy and storage batteries” and a “system for reliably delivering renewable energy to customers.” It will expand its value chain beyond “generating” renewable energy to “aggregating and balancing” and “delivering” it, thereby contributing to the achievement of carbon neutrality.」

    For its renewable energy business, the Group outlined a policy of expanding the value chain beyond owning and operating power generation facilities to include integrated control of storage batteries and the aggregation, balancing and supply of renewable energy.
  2. 2026-04-30AdvancedRevision of earnings forecasts

    「In addition, we will build a “service platform for integrated control of renewable energy and storage batteries” and a “system for reliably delivering renewable energy to customers,” expanding the value chain beyond simply “generating” renewable energy to “aggregating and balancing” and “delivering” it, thereby contributing to the achievement of carbon neutrality.」

    Outlined a policy of expanding the renewable-energy business from owning generation facilities to a value chain that includes aggregation, balancing and supply.
  3. FY2026-H1AdvancedAnnual report

    「In June 2025, Suez Gulf Wind Farm II, which was under construction in Egypt, began commercial operations. With installed capacity of 654MW, the power plant is the largest in Africa, where electricity demand is expected to grow with population increases. Combined with Suez Gulf Wind Farm I, which is already operating, total capacity is 916.5MW.」

    Regarding the expansion of renewable energy facilities, the commencement of commercial operations at a 654 MW wind farm moved the business into the operating stage, with total capacity of 916.5 MW including the existing No. I power plant.
  4. FY2025AchievedAnnual report

    「テラスエナジー㈱ became a wholly owned subsidiary in April 2024, and the Group integrated its management with ㈱ユーラスエナジーホールディングス on 1 April 2025. Through this integration, the Group became a power producer with Japan’s No. 1 wind and solar generation capacity, and aims to make a major advance toward becoming a renewable energy company that leads the achievement of carbon neutrality and continues to be selected globally.」

    The Group completed the conversion of テラスエナジー into a wholly owned subsidiary and its management integration with ユーラスエナジーホールディングス on 1 April 2025, becoming an operator with Japan’s No. 1 wind and solar power generation capacity.
  5. FY2025-H1AdvancedAnnual report

    「AEOLUS SAS, a group company established to contribute to green economic development in Africa through renewable energy businesses, joined an independent power producer (IPP) business in Tunisia in August 2024 with Norway's Scatec ASA. The business involves constructing, owning and operating solar power plants with a combined capacity of 100MW and selling the electricity.」

    In its renewable energy business, AEOLUS SAS joined Scatec ASA in a total of 100 MW of solar power IPP projects in Tunisia, with completion and the start of electricity sales scheduled for the second half of fiscal 2025.
  6. FY2024Annual update of capital expenditureAnnual report

    「The Group made capital investments totaling ¥230,330 million. This was mainly attributable to capital investments in facilities related to wind power generation.」

    Updated capital expenditures for the fiscal year ended March 2024 to ¥230.330 billion and stated that the main investment destination was facilities related to wind power generation.
  7. FY2024-Q3RestatedAnnual report

    「With SBエナジー㈱ becoming part of the Group, the Group will become one of Japan’s largest power producers in both wind and solar power, in addition to its existing wind power business. The Group determined that this would enable it to advance its carbon-neutrality initiatives by accelerating the creation of new businesses using renewable energy to meet market needs and the development of technology in the renewable energy sector.」

    The Group reconfirmed its policy of expanding its renewable energy business on the assumption that it would acquire 85% of SBエナジー (now テラスエナジー) and make it a subsidiary, as well as its business platform combining wind and solar power.
  8. FY2024-Q2AdvancedAnnual report

    「北海道北部風力送電㈱, established and funded by ㈱ユーラスエナジーホールディングス and others, commenced commercial operations in April 2023 for a complete set of power transmission and transformation facilities in the northern Hokkaido region, which had faced challenges with its transmission network. The facilities comprise approximately 78 km of transmission lines and one of the largest lithium-ion storage batteries in Japan. In neighboring areas, 3 companies, including companies under the ユーラス group, are also developing wind farms with a total capacity of approximately 540 MW, expected to be among the largest in Japan, by fiscal 2025. The wind farms will be connected to the transmission and transformation facilities in phases.」

    Commenced commercial operations of power transmission and transformation facilities in northern Hokkaido comprising approximately 78 km of transmission lines and a large-scale storage battery, and outlined a plan to connect wind farms with a capacity of approximately 540 MW by fiscal 2025.
  9. FY2024-Q1RestatedAnnual report

    「To further expand its renewable energy business, the Group acquired 85% of the shares of SBエナジー㈱ held by SoftBank Group Corp., made it a subsidiary in April 2023 and changed its name to テラスエナジー㈱.」

    The acquisition of 85% of SBエナジー’s shares, its conversion into a subsidiary and the change of its name to テラスエナジー㈱ were also confirmed in the scope of consolidation and business activities for the first quarter.
  10. FY2023Annual update of capital expenditureAnnual report

    「The Group made capital investments totaling ¥201,732 million. This was mainly attributable to capital investments in facilities related to wind power generation.」

    Updated capital expenditures to ¥201.732 billion and stated that the main investment destination was facilities related to wind power generation.
  11. FY2023AchievedAnnual report

    「For the same purpose, the Group acquired 85% of the shares of SBエナジー㈱ held by SoftBank Group Corp., made it a subsidiary in April 2023 and changed its name to テラスエナジー㈱. By accelerating its efforts to achieve carbon neutrality, the Group will contribute to the transition to a decarbonized society.」

    The Group completed the acquisition of 85% of SBエナジー’s shares and made it a subsidiary, then changed its name to テラスエナジー㈱.
  12. FY2023-Q3AdvancedAnnual report

    「The Group entered into an agreement on 9 February 2023 to acquire 85% of the shares of SBエナジー株式会社 (hereinafter, “SBエナジー”). Upon completion of the acquisition, SBエナジー is expected to become a subsidiary of the Group.」

    The Group entered into an agreement to acquire 85% of SBエナジー’s shares to expand its renewable energy business. The planned acquisition date has not been determined and is subject to the fulfillment of conditions precedent.
  13. FY2023-Q1AdvancedAnnual report

    「To build a renewable energy value chain, we signed a capital and business alliance agreement in March 2022 with レラテック株式会社, which provides consulting services for wind-condition surveys for onshore and offshore wind power generation. We aim to become a solutions provider supporting offshore wind power and contribute to the growth of the offshore wind market, where demand is expected to increase. To expand the renewable energy business, we decided in May 2022 to acquire the 40% interest in ユーラスエナジーホールディングス held by Tokyo Electric Power Company Holdings,Incorporated, making it a wholly owned subsidiary. Based on a resolution of our board of directors at its meeting held on 26 May 2022, the group acquired 40% of the shares of its consolidated subsidiary ユーラスエナジーホールディングス on 1 August 2022, making it a wholly owned subsidiary. The acquisition price was ¥185.0 billion.」

    In addition to a capital and business alliance with a company conducting offshore wind-condition surveys and consulting, acquired the remaining 40% of ユーラスエナジーホールディングス and made it a wholly owned subsidiary, expanding the foundation of the renewable energy business.
  14. FY2022AdvancedAnnual report

    「The group made capital expenditures totaling ¥154.884 billion, mainly on wind power generation-related facilities.」

    Made capital expenditures totaling ¥154.884 billion, primarily on wind power generation-related facilities.
  15. FY2021AdvancedAnnual report

    「The group made capital expenditures totaling ¥143.970 billion, mainly on wind power generation-related facilities. Capital expenditures include right-of-use assets.」

    In the fiscal year ended March 2021, made capital expenditures totaling ¥143.970 billion, mainly on wind power generation-related facilities.
  16. FY2021-Q1AdvancedAnnual report

    「To stabilize Myanmar's electricity supply and promote the use of renewable energy, we secured an order in April 2020 from the Electricity Generation Enterprise of Myanmar's Ministry of Electricity and Energy for a rehabilitation project at the Sedawgyi Hydropower Plant.」

    Secured an order for a hydropower plant rehabilitation project in Myanmar, giving concrete form to a renewable energy-related business.
  17. FY2020AdvancedAnnual report

    「The group made capital expenditures totaling ¥160.987 billion, mainly on wind power generation-related facilities.」

    Capital expenditures totaled ¥160.987 billion, mainly invested in wind power generation-related facilities.
  18. FY2020-Q3AdvancedAnnual report

    「To help spread clean, affordable renewable energy and further expand its wind power business, we began commercial operations in October 2019 at a 262.5 MW wind farm in the Arab Republic of Egypt that we had been developing jointly with Euras Energy Holdings Corporation.」

    The 262.5MW power plant in Egypt's first wind-power IPP project, for which orders were secured and participation announced in 2018, began commercial operations.
  19. FY2020-Q2AdvancedAnnual report

    「To support the development of local communities through electrification at the community level, we subscribed to a private placement by US venture company Powerhive Inc., which operates mini-grid businesses combining solar power generation systems and storage batteries in unelectrified areas of Kenya, and invested in the company in July 2019.」

    Expanded the regions and formats of the renewable energy business through an investment in a Kenyan mini-grid business combining solar power generation and battery storage.
  20. FY2019AdvancedAnnual report

    「The Group made capital investments totaling ¥88,737 million, mainly in facilities related to wind power generation.」

    Made ¥88.737 billion in capital expenditures, primarily on wind power generation-related facilities, expanding renewable energy facilities.
  21. FY2018AdvancedAnnual report

    「The group made capital expenditures totaling ¥67.482 billion, mainly on wind power generation facilities.」

    Made capital expenditures totaling ¥67.482 billion, primarily on wind power generation facilities.
  22. FY2018-Q3AdvancedAnnual report

    「In Egypt, we secured an order in November 2017, together with ユーラスエナジーホールディングス and others, for the construction, ownership, and operation of a 262.5MW wind farm, and will participate in the country's first wind-power IPP project.」

    Gave concrete form to participation in Egypt's first wind-power IPP project by securing an order for the construction, ownership, and operation of a 262.5MW wind farm.
  23. FY2018-Q1AdvancedAnnual report

    「At ユーラスエナジーホールディングス, a group company, the Eurus Kitah-Awaji Solar Park, which had been under construction in Awaji, Hyogo Prefecture, was completed and began commercial operations in May 2017.」

    Completed a solar power plant in Awaji, Hyogo Prefecture, which began commercial operations in May 2017.
  24. FY2017AdvancedAnnual report

    「The group made capital expenditures totaling ¥80.163 billion, mainly on wind power generation facilities and automotive sales locations. In addition, ユーラスエナジーホールディングス, a group company, newly entered the wind power generation business in Finland and the Netherlands, bringing the number of countries in which it operates to 11 worldwide. A large-scale solar power plant that the company had been constructing in Hawaii was also completed and began commercial operations in January 2017.」

    Expanded the countries of operation for wind power generation to 11 and completed a large-scale solar power plant in Hawaii, which began commercial operations.
  25. FY2017-Q3AdvancedAnnual report

    「In addition, ユーラスエナジーホールディングス, a group company, newly entered the wind power generation business in Finland and the Netherlands, bringing the number of countries in which it operates to 11 worldwide.」

    Newly entered the wind power generation business in Finland and the Netherlands, bringing the number of countries of operation worldwide to 11.
  26. FY2017-Q1AdvancedAnnual report

    「In addition, ユーラスエナジーホールディングス, a group company, has been operating the Eurus Rokkasho Solar Park in Rokkasho Village, Aomori Prefecture, smoothly. It is currently the largest-scale solar power generation facility in Japan.」

    Operated the Eurus Rokkasho Solar Park in Rokkasho Village, Aomori Prefecture, smoothly as Japan's largest-scale solar power generation facility.
  27. FY2016First statedAnnual report

    「The group made capital expenditures totaling ¥105.061 billion. This was mainly due to capital expenditures on solar power generation facilities.」

    Made capital expenditures totaling ¥105.061 billion, primarily on solar power generation facilities. The completion and start of operations of the Gotsu Biomass Power Plant and wind power generation facilities were also mentioned.
Moved together

"African Business Through CFAO and Synergies Across Businesses" moved the same way as this thread, in the same document, in 18 of its 26 moves.

181616161412★123456
  1. ★This thread
  2. 1African Business Through CFAO and Synergies Across Businesses18×
  3. 2Consolidated dividend payout ratio of 25% based on profit before amortization of goodwill16×
  4. 3Expansion of Transactions in the Mobility Sector and Next-Generation Businesses16×
  5. 4Expanding Existing Businesses and Entering New Businesses through Partnerships and Investments16×
  6. 5Business Creation through Innovative Technologies, Services, and Products14×
  7. 6Resources & Environment and a Sustainable Society12×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Toyota Tsusho's next results are scheduled for 2026-10-29. Read the earnings preview It last moved in the Revision of earnings forecasts of 2026-04-30: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Expansion of Renewable Energy Business Facilities | TOYOTA TSUSHO CORPORATION (8015) | Komori