Komori
Other Disclosures7966LINTEC CorporationInformation and Communications, Services and Others

Construction of a new building at the Ina Technology Center

LINTEC constructed a 4-story development building at the Ina Technology Center, expanding space for development, design, evaluation and testing, and manufacturing. The new building will begin operations in October 2026, increasing development capabilities and production capacity for semiconductor-related equipment.

Worth reading
46Recurring
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
25
¥100 million (total construction cost)
Wording
Definitive
How definitive the wording is.

Announced details

Semiconductor-related equipmentEquipment for applying and removing specialty adhesive tapeLabeling Machines
Applicable field (uses covered by this announcement)

Backside grinding (thinning) of semiconductor wafers, dicing, and label application to product packages

Launch dateOctober 2026 (scheduled start of operations)
What the company reported numerically
Quantitative Effects

Development area: approximately 1.5 times the previous floor space; manufacturing area: approximately 1.6 times the previous floor space

Usage history

The Ina Technology Center has 308 employees (as of 1 September 2026, including temporary staff and employees of affiliated companies)

Location (as indicated in this announcement)

Ina, Kita-Adachi District, Saitama Prefecture

The development building has 4 above-ground floors, a building footprint of approximately 1,000 m², and total floor space of approximately 3,600 m². The development area is approximately 1.5 times larger than before, and the manufacturing area is approximately 1.6 times larger in terms of floor space.

In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.

Announced details
ItemDetails
Names of Products / Services CoveredSemiconductor-related equipment, Equipment for applying and removing specialty adhesive tape, Labeling Machines
Launch dateOctober 2026 (scheduled start of operations)
Applicable areaBackside grinding (thinning) of semiconductor wafers, dicing, and label application to product packages
LocationIna, Kita-Adachi District, Saitama Prefecture
Location scaleThe development building has 4 above-ground floors, a building footprint of approximately 1,000 m², and total floor space of approximately 3,600 m². The development area is approximately 1.5 times larger than before, and the manufacturing area is approximately 1.6 times larger in terms of floor space.
Quantitative EffectsDevelopment area: approximately 1.5 times the previous floor space; manufacturing area: approximately 1.6 times the previous floor space
Usage historyThe Ina Technology Center has 308 employees (as of 1 September 2026, including temporary staff and employees of affiliated companies)
Items this document does not state (11)
CounterpartyCounterparty overviewRelationship with the CompanyContract ValueOffering priceContract DateAward/certification nameAwarding / certifying bodyRegistration number and expiry dateImpact on Business PerformanceSource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

To respond to growing demand for semiconductor-related equipment, strengthen the development capabilities for new equipment, and increase production capacity. The company also cited the fact that existing production capacity is nearing its limit and that orders need to be fulfilled within short lead times.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
Construction of a new building at the Ina Technology Center | LINTEC Corporation (7966) timely disclosure | Komori