Completion of the Nationwide Logistics Network and Stable Supply
First written in FY2016. 26 of 38 entries say "Advanced", first in FY2017-Q3. Latest entry: 2026-07-31.
The whole theme swung hardest in 2022: 1 of 7 companies on the "Worse" side.
1 other company's latest entry also says "Advanced".
- 2026-07-31AdvancedEarnings
「For destinations receiving small-lot deliveries, changing to deliveries on 2 designated days per week reduced average delivery time by 10%.」
The Company added a result showing a 10% reduction in average delivery time through leveling delivery workloads with designated-day deliveries. - FY2026AdvancedAnnual report
「From summer 2025, the company introduced deliveries on 2 designated days per week for small-lot delivery destinations and brought forward delivery dates during the year-end peak season, reducing the number of delivery vehicles on the peak shipping day by 3% year on year.」
The company leveled delivery workloads through deliveries on designated dates and earlier deliveries during peak seasons, reducing the number of delivery vehicles on the peak shipping day by 3% year on year. - FY2026-H1AdvancedAnnual report
「The group has established an efficient logistics system covering 85% of the total population within a 100 km radius. … As a result, it has achieved logistics quality that reliably delivers products when needed, with 88% of actual delivery times falling within ±15 minutes of the planned delivery time.」
In addition to its existing nationwide logistics network, the company reported logistics quality metrics of 88% accuracy versus planned delivery times and within ±15 minutes. - FY2025AdvancedAnnual report
「As a result, the number of trucks with on-duty periods exceeding 13 hours fell to zero. The use of sorters and dedicated pallets, together with the consolidation of shipping and receiving locations, has also substantially reduced the number of trucks with waiting or loading times exceeding 2 hours.」
Through measures including the Kansai Hub Center, sorters, dedicated pallets and consolidation of shipping and receiving locations, the number of trucks with on-duty periods exceeding 13 hours fell to zero, while the number with waiting or loading times exceeding 2 hours also declined substantially. - FY2025-H1AdvancedAnnual report
「As a result of the Kansai Hub Center’s operations and other measures, the number of trucks with on-duty periods exceeding 13 hours fell to 0. The use of sorters and dedicated pallets, together with the consolidation of shipping and receiving locations, has also reduced the number of trucks with waiting or loading times exceeding 2 hours.」
The response to the logistics “2024 problem” has progressed through the Kansai Hub Center, sorters, dedicated pallets and consolidation of shipping and receiving locations, bringing the number of trucks with on-duty periods exceeding 13 hours to 0. The number of trucks with waiting or loading times exceeding 2 hours also declined. - FY2024AdvancedAnnual report
「As the Standards for Improving Working Hours, etc. of Motor Vehicle Drivers (the Improvement Standards Notification) under the Work Style Reform-related legislation took effect on 1 April 2024, the group is addressing the logistics “2024 problem” across the group, including not only logistics but also production and sales. The Kansai Hub Center has substantially reduced the number of trucks with on-duty periods exceeding 13 hours. The use of sorters and dedicated pallets, together with the consolidation of shipping and receiving locations, has also reduced the number of trucks with waiting or loading times exceeding 2 hours.」
The Kansai Hub Center, sorters, dedicated pallets and consolidation of shipping and receiving locations have reduced the number of vehicles subject to long on-duty periods and the number with waiting or loading times exceeding 2 hours, as part of the response to the logistics “2024 problem.” - FY2024-Q3AdvancedAnnual report
「The Kansai region was previously served from the Fukuyama Hub Center, but shipping from the Kansai Hub Center has shortened delivery times and substantially reduced the number of trucks with on-duty periods exceeding 13 hours. The company will continue working to ensure more stable supply, including by addressing the limits on drivers’ overtime hours under the Work Style Reform-related legislation, known as the logistics “2024 problem.”」
Shipping from the Kansai Hub Center shortened delivery times and substantially reduced the number of trucks with on-duty periods exceeding 13 hours. The company describes the specific effect of its response to the logistics “2024 problem.” - FY2024-Q1AdvancedAnnual report
「To ensure stable product supply, the group has established a logistics network covering 85% of the total population within a 100 km radius of distribution centers at 9 sites nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu). To reduce logistics costs, it is working to deliver products using its own fleet, which can offer lower freight costs than regular route deliveries, expand the use of pallet transport and improve truck utilization. The Kansai region was previously served from the Fukuyama Hub Center, but shipping from the Kansai Hub Center has shortened delivery times and supports compliance with the limits on drivers’ overtime hours under the Work Style Reform-related legislation, contributing to more stable supply.」
The company began shipping from the Kansai Hub Center, citing shorter delivery times and compliance with the limits on drivers’ overtime hours as additional benefits of its logistics network. - FY2023AchievedAnnual report
「During the consolidated fiscal year, the Kansai Hub Center began operations. As a result, a logistics network was completed that covers 85% of the total population, including major cities, within a 100 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu).」
The Kansai Hub Center began operations, completing a logistics network that covers 85% of the total population, including major cities, within a 100 km radius. - FY2023-Q3AdvancedAnnual report
「The Kansai Hub Center, a new supply base for the Kinki region, a major metropolitan area, is equipped with an automated sorting and shipping system that sorts products according to their delivery areas and will begin operations in stages from February 2023. This will complete a logistics network covering 85% of the total population, including major cities, within a 100 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu).」
The Kansai Hub Center’s automated sorting and shipping system will begin operating in stages from February 2023, updating the logistics network plan from coverage of 70% of the total population within a 150 km radius to coverage of 85% within a 100 km radius. - FY2023-Q2SoftenedAnnual report
「The Kansai Hub Center, a new supply base for the Kinki region, a major metropolitan area, will be equipped with an automated sorting and shipping system that sorts products according to their delivery areas and is expected to begin operations around February 2023. Once the Kansai Hub Center becomes operational, a logistics network will be completed that covers 70% of the total population, including major cities, within a 150 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu).」
The expected start of operations for the Kansai Hub Center has been revised from the previously planned completion in September 2022 to around February 2023. The plan to cover 70% of the total population within a 150 km radius of 9 sites remains unchanged. - FY2023-Q1AdvancedAnnual report
「In September 2022, the Kansai Hub Center, equipped with an automated sorting and shipping system that sorts products according to their delivery areas, will be completed. In addition, the company plans to acquire in September 2022 a separate parcel of land located approximately 300 m from the Kansai Plant and Kansai Hub Center site (sale and purchase agreement signed in March 2022; site area: 29,136.58 m²), where it plans to construct a new sorting and distribution center. Once the Kansai Hub Center becomes operational, a logistics network will be completed that covers 70% of the total population, including major cities, within a 150 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu).」
In addition to completion of the Kansai Hub Center and the start of automated sorter operations, the company has outlined plans to acquire approximately 29,136.58 m² of nearby land and construct a sorting and distribution center, and expects to complete a logistics network covering 70% of the total population within a 150 km radius of 9 sites. - FY2022AdvancedAnnual report
「To accommodate future demand growth and ensure stable product supply, the company expanded the Chubu Hub Center, completed in September 2021, with an automated sorting and shipping system that sorts products according to their delivery areas. Following the Chubu Hub Center’s start of operations, approximately 75% of nationwide shipments are sorted by the automated system, contributing to lower handling costs and shorter loading times.」
The company reports the automated sorter’s operation following the Chubu Hub Center expansion, demonstrating a system that automatically sorts approximately 75% of nationwide shipments and reduces handling costs and loading times. - FY2022-Q3AdvancedAnnual report
「To accommodate future demand growth and ensure stable product supply, the company expanded the Chubu Hub Center, completed in September 2021, with an automated sorting and shipping system that sorts products according to their delivery areas. Following the Chubu Hub Center’s start of operations, approximately 75% of nationwide shipments are sorted by the automated system, contributing to lower handling costs and shorter loading times. The company is also proceeding with construction of the Kansai Hub Center alongside the Kansai Plant, scheduled for completion in September 2022. As a result, a logistics network will be completed that covers 70% of the total population, including major cities, within a 150 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu).」
The Chubu Hub Center was completed in September 2021, establishing a system under which approximately 75% of nationwide shipments are sorted by automated sorters. Once the Kansai Hub Center is constructed, the company expects to complete a logistics network covering 70% of the total population within a 150 km radius of 9 sites. - FY2022-Q2AdvancedAnnual report
「Amid the significant changes in demand described above, the company used its supply chain management system to achieve virtually zero stockouts, including during peak periods, throughout the year from September 2020 to August 2021. It will continue working to ensure stable product supplies and support safe and secure food consumption.」
The company reports a track record of supplying products with virtually no stockouts for nearly 1 year, including periods of fluctuating demand and peak seasons, through its nationwide production and logistics network and SCM system. - FY2022-Q1AdvancedAnnual report
「To accommodate future demand growth and ensure stable product supply, the company is expanding the Chubu Hub Center on land adjacent to its existing logistics facility and is also proceeding with construction of the Kansai Hub Center alongside the Kansai Plant. As a result, a logistics network will be completed that covers 70% of the total population, including major cities, within a 150 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Kansai, Fukuyama and Kyushu). The Chubu and Kansai Hub Centers will be equipped with automated sorting and shipping systems that sort products according to their delivery areas. Once the centers are operational, 76% of nationwide shipments are expected to be sorted by these systems.」
The company is giving concrete form to its logistics plan by developing the Chubu and Kansai Hub Centers, covering 70% of the total population within a 150 km radius of 9 sites and sorting 76% of nationwide shipments with automated sorters. - FY2021AdvancedAnnual report
「Once the Kansai Hub Center in Ono, Hyogo Prefecture (scheduled for completion in September 2022) becomes operational, the Kinki region, a major metropolitan area previously served from the Fukuyama Distribution Center in Hiroshima Prefecture, will be divided into separate delivery areas. This is expected to shorten delivery times, contain logistics costs, strengthen business continuity during natural disasters and enable more stable supply. As a result, a logistics network will be completed that covers 70% of the total population, including major cities, within a 150 km radius of the company’s distribution centers nationwide (Hokkaido, Tohoku, Kanto, Hachioji, Tokai, Chubu, Fukuyama, Kyushu and the Kansai Hub Center).」
The company has specified the effects of its 9-site network after the Kansai Hub Center becomes operational, including a logistics network covering 70% of the total population within a 150 km radius, as well as improvements in delivery times, logistics costs and BCP. - FY2021-Q1AdvancedAnnual report
「To reduce labor requirements in warehouse operations, the company introduced automated guided vehicles (Automated Guided Vehicle), expanding to 29 vehicles at 7 locations nationwide as of the end of June 2020. It had also introduced 2 automated guided forklifts (Automated Guided Forklift) as of the end of June 2020 and will accelerate its labor-saving initiatives. In addition, it is pursuing measures to ensure stable supply during peak periods, including improving productivity in picking operations through a voice-picking system. As of the end of June 2020, pallet transport was being implemented on 5 routes, and the company will seek to expand the routes covered.」
The company now operates 29 automated guided vehicles at 7 sites nationwide and has also introduced 2 automated guided forklifts. Pallet transport is conducted on 5 routes. - FY2020AdvancedAnnual report
「For inter-site transfers between the company's locations, loading products onto trucks and unloading them had previously been performed entirely manually. By incorporating pallet transport, in which products are loaded onto trucks while still on pallets, the company was able to significantly shorten handling times. As of the end of March 2020, pallet transport was being implemented on 5 routes, and the company will seek to expand the routes covered.」
The number of routes using pallet transport increased from the 4 previously reported to 5 as of the end of March 2020. - FY2020-Q3AdvancedAnnual report
「The Group will work to control logistics costs by increasing the proportion of deliveries made using its own vehicles and improving load efficiency per truck. It began introducing automated guided vehicles in August 2017 to improve the efficiency of warehouse operations and reduce labor requirements, expanding to 29 vehicles at 7 locations nationwide as of the end of December 2019. It also plans to introduce automated guided forklifts. As of the end of December 2019, pallet transport was being implemented on 4 routes, and the company will seek to expand the routes covered.」
Automated guided vehicles expanded to 29 vehicles at 7 locations nationwide. The company also describes plans to introduce automated guided forklifts, increase the use of its own delivery services and improve load efficiency, and implement pallet transport on 4 routes. - FY2020-Q2AdvancedAnnual report
「To improve the efficiency of warehouse operations and reduce labor requirements, the company began introducing automated guided vehicles (Automatic Guided Vehicle) in August 2017. These had expanded to 29 vehicles at 7 locations nationwide. In addition, through measures including the introduction of a voice-picking system to improve productivity in picking operations, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
Automated guided vehicles expanded from 22 vehicles at 6 locations nationwide to 29 vehicles at 7 locations nationwide. The company also states that it was able to make deliveries without major disruption using its own delivery services when common-carrier services were suspended or collection was restricted. - FY2020-Q1AdvancedAnnual report
「During the Golden Week holiday period from 27 April to 6 May 2019, while common-carrier operators suspended services or restricted collection, the company arranged its own delivery services for the holiday period and was able to deliver products and goods to customers without major disruption.」
The company states that it was able to make deliveries without major disruption using its own delivery services even during the Golden Week holiday period, when common-carrier services were suspended or collection was restricted. - FY2019AdvancedAnnual report
「After completing the construction of a robust and flexible logistics network covering the entire country, the company began introducing automated guided vehicles (Automatic Guided Vehicle) in August 2017 to improve the efficiency of warehouse operations and reduce labor requirements. By March 2019, this had expanded to 22 vehicles at 6 locations nationwide. In addition, through measures including the introduction of a voice-picking system to improve productivity in picking operations, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
The company expanded automated guided vehicles to 22 vehicles at 6 locations nationwide and established a stable supply structure together with voice picking and other measures. - FY2019-Q3AdvancedAnnual report
「As a result, although concerns arose during the December 2018 peak season over insufficient transport capacity in the trucking industry due to a driver shortage, the Group was able to deliver products and goods to customers without major disruption.」
The company states that it was able to maintain supply without major disruption by using its logistics network and other resources even during the December 2018 peak season, when a driver shortage raised concerns over insufficient transport capacity. - FY2019-Q2AdvancedAnnual report
「After completing the construction of a robust and flexible logistics network covering the entire country and establishing a structure capable of maintaining stable supplies amid future market expansion and during peak periods, the Group was able to deliver products and goods to customers with generally no major problems despite a shortage of trucks in western Japan caused by torrential rains in western Japan.」
The company states that it was able to maintain generally uninterrupted supply by using its logistics network even during the truck shortage caused by torrential rains in western Japan. - FY2019-Q1RestatedAnnual report
「After completing the construction of a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods. It introduced automated guided vehicles to improve the efficiency of warehouse operations and reduce labor requirements, and introduced a voice-picking system to improve productivity in picking operations. In addition, as part of its BCP, it installed emergency power-generation equipment at all 21 locations nationwide and stockpiled fuel to secure 72 hours (3 days) of power, enabling important business activities to continue in the event of a power outage caused by a disaster or other event. Through these measures, it will provide cost control across the entire distribution process through delivery of products and goods to customers, together with stable supply.」
The company reconfirms stable supply through its nationwide logistics network, labor savings through automated guided vehicles and voice picking, and BCP measures covering 21 locations and 72 hours. - FY2018RestatedAnnual report
「After completing the construction of a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods. It also introduced a voice-picking system to improve productivity in picking operations. Through these measures, it will provide cost control across the entire distribution process through delivery of products and goods to customers, together with stable supply.」
The company reconfirms its policy of using a nationwide logistics network and voice picking to control distribution costs and ensure stable supply. - FY2018-Q3RestatedAnnual report
「After completing the construction of a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods. It also introduced a voice-picking system to improve productivity in picking operations. Through these measures, it will provide cost control across the entire distribution process through delivery of products and goods to customers, together with stable supply.」
The company reconfirms stable supply through its nationwide logistics network, as well as productivity improvements through voice picking and distribution cost control. - FY2018-Q2RestatedAnnual report
「After completing the construction of a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods. It also introduced a voice-picking system to improve productivity in picking operations. Through these measures, it will provide cost control across the entire distribution process through delivery of products and goods to customers, together with stable supply.」
The company reconfirms stable supply through its nationwide logistics network and distribution cost control and productivity improvements through voice picking. - FY2018-Q1RestatedAnnual report
「In logistics, after completing the construction of a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
The company reconfirms the completion of its nationwide logistics network and its stable supply structure. - FY2017RestatedAnnual report
「In logistics, after completing the construction of a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
The company reconfirms the completion of its nationwide logistics network and its structure for stable supply amid market expansion and during peak periods. - FY2017-Q3AdvancedAnnual report
「Although the number of delivery vehicles reached a record high during the year-end peak, when sales are concentrated, the company was able to conduct deliveries without disruption by fully utilizing its logistics network, which had been expanded over six years, including the Fukuyama Cross-Dock Center and Hachioji Distribution Center.」
Even when the number of delivery vehicles reached a record high at year-end, the company was able to conduct deliveries without disruption by using its expanded logistics network. - FY2017-Q2RestatedAnnual report
「In logistics, after completing the six-year effort to build a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
The company reconfirms the completion of its nationwide logistics network and its stable supply structure. - FY2017-Q1RestatedAnnual report
「In logistics, after completing the six-year effort to build a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
The company reconfirms the completion of its nationwide logistics network and its stable supply structure. - FY2016First statedAnnual report
「After completing the six-year effort to build a robust and flexible logistics network covering the entire country, the company established a structure capable of maintaining stable supplies amid future market expansion and during peak periods.」
The company states that the six-year development of its logistics network has reached a milestone and that it has established a structure capable of maintaining stable supplies amid market expansion and during peak periods.