Impact on production and shipments from delays in procuring semiconductors and other materials
First written in FY2023-Q2. 2 of 4 entries say "Restated". Latest entry: FY2024.
The whole theme swung hardest in 2021: 3 of 7 companies on the "Worse" side.
3 other companies' latest entry also says "Dropped".
- FY2024DroppedAnnual reportThe business and risk disclosures for the current fiscal year contain no explicit reference to the delays in procuring semiconductors and other materials, production delays and lower shipment volumes described through the previous fiscal year.
- FY2023RestatedAnnual report
「In “Labor-saving machinery and molds for resin molding,” the inability to procure semiconductors and other materials as scheduled delayed production and reduced shipment volumes, although」
The company states that delays in procuring semiconductors and other materials, production delays and lower shipment volumes also occurred over the full year. Meanwhile, orders for data centers and cable television offset the impact, resulting in higher net sales for the “Other” segment as a whole. - FY2023-Q3RestatedAnnual report
「In “Labor-saving machinery and molds for resin molding,” the inability to procure semiconductors and other materials as scheduled delayed production and reduced shipment volumes. However, strong orders for “Data Centers” and “Cable Television” resulted in net sales increasing by ¥53 million, or 2.6%, year on year to ¥2,133 million.」
The company states that delays in procuring semiconductors and other materials, production delays and lower shipment volumes continued. Meanwhile, orders for data centers and cable television offset the impact, resulting in higher net sales for the “Other” segment as a whole. - FY2023-Q2First statedAnnual report
「In “Labor-saving machinery and molds for resin molding,” the inability to procure semiconductors and other materials as scheduled delayed production and reduced shipment volumes. As a result, net sales declined by ¥48 million, or 3.3%, year on year to ¥1,404 million.」
For the first time, the company states that it was unable to procure semiconductors and other materials as scheduled, resulting in actual production delays and lower shipment volumes.