Semiannual Report — FY2026 H1
What MUTO SEIKO CO. reported for the period from 2026-04-01 to 2027-03-31.
Filed 2026-11-12View the original on EDINET
How much it says
65Detailed
What moved here
11named for the first time
Its own wording
25terms
Which filing this is
34/ 34newest
No officer data yetThis company's filings have not been read for officers yet. Nothing is missing from the filings — the roster simply has not been extracted.
The gist
The company transferred all shares of 大英エレクトロニクス株式会社, a consolidated subsidiary that operated the printed circuit board business, to 竹田iPホールディングス株式会社. From the current interim consolidated accounting period, 大英エレクトロニクス株式会社 was excluded from the scope of consolidation, leaving the company with a single business segment, the plastic molding business. In connection with this, the company recorded a gain on the sale of shares in an affiliated company as an extraordinary gain.
Komori's summary of this document, not the document's own words.65Detailed
How much this filing saysA weighted roll-up of 10 rubric dimensions, each scored from a fixed set of questions asked against this filing — built only from the 34 this document could answer. It measures how specific the disclosure is, not whether the company is doing well. Derived from the data, not editorial.
93
Very detailed
77
Very detailed
8
Almost nothing
100
Very detailed
0
Almost nothing
100
Very detailed
55
Typical
44
Thin
79
Very detailed
100
Very detailed
R&D spendNot disclosedThis document does not carry the figure.
Cash left over7億円Cash from the business, less what went into equipment.
Spent on equipmentNot disclosedThis document does not carry the figure.
EmployeesNot disclosedThis document does not carry the figure.
How to read this page
This is not the documentIt is Komori's reading of the filing submitted to EDINET. The original is linked above.
The score is not a verdictIt measures how specific the disclosure is. It says nothing about results or where the share price goes.
When it updatesContent lands once the filing has been read through. Right after submission, the summary can still be empty.