Orvis (7827) · InitiativeAdvanced
Increasing production capacity through the introduction of a super-cut machine for engineered materials
First written in FY2017. 1 of 2 entries say "Advanced", first in FY2023-Q3. Latest entry: FY2023-Q3.
2entries
6years
0from disclosures
How it moved
Same theme, other companies
Installation of a Super Cut Machine for Engineered Structural Materials at the Fukuyama PlantA theme 1 companies write about · 0 as a headwind · 1 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2023-Q3AdvancedAnnual report
「また、製材ラインの渋滞を解消する設備投資を実施いたしました。各工程の生産量と作業量の差が小さくなり、工程間の連結がスムーズになるなど、生産効率の改善が進み」
製材ラインの渋滞解消を目的とする設備投資を実施し、工程間の連結がスムーズになるなど生産効率の改善が進んだと記載している。 - FY2017First statedAnnual report
「Fukuyama Plant (Fukuyama, Hiroshima Prefecture) — Timber business; super-cut machine (cross-cutting): ¥65 million; financed with internal funds; construction commenced in December 2017 and was scheduled for completion in June 2018; planned 100% increase in engineered-timber production capacity.」
The Company planned to invest ¥65 million in a super-cut machine at the Fukuyama Plant, with work beginning in December 2017 and completion scheduled for June 2018, doubling engineered-timber production capacity.