Komori
Tokyo Board Industries (7815) · InitiativeAdvanced

Strengthening Business Continuity Systems During Natural Disasters Through BCP

First written in FY2020. 2 of 4 entries say "Restated". Latest entry: FY2026.

4entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2020 – FY20222020: 120202021: 120212022: 120222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Emergency Response Framework Based on a Business Continuity Plan (BCP)A theme 310 companies write about · 75 as a headwind · 239 as a tailwind

The whole theme swung hardest in 2020: 22 of 111 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 195 companies compared. The sentences above are computed from all 195.Comparing 200 of the theme's 315 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「The Group is working to minimise damage and strengthen its business continuity system from a BCP perspective. In particular, at production sites with a high fire risk, it will further strengthen measures, including capital investment based on risk assessments, and work to prevent recurrence.」

    In light of damage caused by natural disasters and fires, measures have become more specific, including further strengthening capital investment and other measures based on risk assessments at production sites with high fire risk, and preventing recurrence.
  2. FY2022RestatedAnnual report

    「From a business continuity planning (BCP) perspective, our Group will continue working to minimize damage and strengthen its business continuity framework.」

    The policy of minimising damage through the BCP and strengthening the business continuity system in preparation for natural disasters and other events continues.
  3. FY2021RestatedAnnual report

    「From a business continuity planning (BCP) perspective, our Group will continue working to minimize damage and strengthen its business continuity framework.」

    The policy of minimising damage and strengthening the business continuity system based on the BCP in response to natural disasters and other events has been reaffirmed.
  4. FY2020First statedAnnual report

    「From a business continuity planning (BCP) perspective, our Group will continue working to minimize damage and strengthen its business continuity framework.」

    For the first time, the Company explicitly stated a policy of minimising damage and strengthening its business continuity system from a BCP perspective in response to the risk of facility damage and operational shutdowns caused by typhoons, high waves and other events.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Tokyo Board Industries's next results are scheduled for 2026-10-15. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Strengthening Business Continuity Systems During Natural Disasters Through BCP | TOKYO BOARD INDUSTRIES CO.,LTD. (7815) | Komori