Fiscal year ending February 2026 · 1 April 2025 to 28 February 2026 (11-month fiscal period)Previous forecast published 10 February 2026The bar length represents the relative magnitude of change, based on the item that changed the most in this document. The percentage change shown by the dotted line is calculated from the two reported figures because the company did not provide the rate.
At the Sakura Plant, repairs to machinery and other equipment that had been scheduled for the following fiscal year were carried out earlier than planned because the plant was in a shutdown period, resulting in profits falling below the forecast.
| Item | Details |
|---|---|
| Net Sales | ¥6,641 million → ¥6,625 million(-0.2%) |
| Operating profit | ¥-25 million → ¥-81 million |
| Ordinary income | ¥-130 million → ¥-190 million |
| Profit attributable to owners of the parent | ¥-687 million → ¥-777 million |
| Net income per share | -187.69 yen and sen → -300.1 yen and sen |
| Fiscal Period Covered | Fiscal year ending February 2026 |
| Period Covered | 1 April 2025 to 28 February 2026 (11-month fiscal period) |
| Publication date of previous forecast | 10 February 2026 |
| Previous-period results | Actual results for the fiscal year ended March 2025: net sales ¥7,733 million, operating loss ¥32 million, ordinary loss ¥90 million, net income attributable to owners of the parent ¥293 million, and net income per share ¥113.09 (12-month fiscal period) |
| Reason for the revision | At the Sakura Plant, repairs to machinery and other equipment that had been scheduled for the following fiscal year were carried out earlier than planned because the plant was in a shutdown period, resulting in profits falling below the forecast. |
| Consolidated / non-consolidated | Consolidated |
Items this document does not state (2)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.Repairs to machinery and other equipment at the Sakura Plant that had been scheduled for the following fiscal year were carried out earlier than planned because the plant was in a shutdown period.